1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 30/9-B-45</witsml:nameWell><witsml:nameWellbore>NO 30/9-B-45</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:55:33.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>30/9-B-45</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>30/9-B-45</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4513</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2002-03-20T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>OSEBERG B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>272897</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">8225</witsml:md><witsml:tvd uom="m">2716.3</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">918</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">167</witsml:mdKickoff><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">58</witsml:elevKelly><witsml:sum24Hr>Intervention crew arrived platform.
6 +Started to spot and check out wireline equipmen at BOP deck.</witsml:sum24Hr><witsml:forecast24Hr>Continue RU on BOP deck. Hook up equipment to platform power, F&amp;G etc.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
7 +
8 +
9 +
10 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Rig crane still down due to heavy wind.
11 +Continued spotting and hooking up equipment on BOP deck. </witsml:extendedReport >
12 +
13 +<witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Started to check out the arrived wireline equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rig crane down due to heavy wind.
14 +Spotted equipment on BOP deck. Started to hook up cables and hoses between wl-winch and add-on unit.</witsml:comments></witsml:activity>
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +
25 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 30/9-F-7 A</witsml:nameWell><witsml:nameWellbore>NO 30/9-F-7 AT2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:56:05.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>30/9-F-7 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>30/9-F-7 AT2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6628</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2011-09-24T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>KCA Deutag Drilling Norge AS</witsml:drillContractor><witsml:rigAlias><witsml:name>OSEBERG SØR</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280205</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">1603</witsml:md><witsml:tvd uom="m">1371.64</witsml:tvd><witsml:diaHole uom="in">17.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">1204</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">0</witsml:strengthForm><witsml:mdStrengthForm uom="m">0</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">14</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2593.44</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2080.1</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">0</witsml:distDrill><witsml:elevKelly uom="m">67.2</witsml:elevKelly><witsml:sum24Hr>POOH with 16&quot; x 17 1/2&quot; geopilot and XR reamer BHA on 6 5/8&quot; DP from 1195 m to surface. R/B same in derrick. N/D and repaired leak in annular preventer.</witsml:sum24Hr><witsml:forecast24Hr>Repair leak in annular preventer. N/U. Perform BOP test. M/U and RIH with 16&quot; x 17 1/2&quot; BHA. (status at 06:00 dependent on progress of annular repair)</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +<witsml:fluid><witsml:type>Versatec</witsml:type><witsml:dTim>2011-10-03T16:00:00.000Z</witsml:dTim><witsml:md uom="m">1603</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.36</witsml:density><witsml:pv uom="mPa.s">33</witsml:pv><witsml:yp uom="Pa">12</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Dimanteled annular preventer to inspect/replace seals on outer cylinder. Depth: 0. Unable to retrieve outer cylinder from annular preventer with 2 tonn. Discussed further action with Cameron onshore duty. Waited for Cameron representative to get required rest to discuss further action. Meanwhile cleaned area around BOP and drill floor for further operation.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Flow checked well. Pumped 5 m3 with 1,64 sg slug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>POOH with 16&quot; x 17 1/2&quot; geopilot and XR reamer BHA on 6 5/8&quot; DP from 1195 m to 135 m . Avg. tripping speed 850 m/hr. Avg. slips to slips time 1,1 min. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting prior to B/O and racking BHA. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">25</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>B/O and racked back 16&quot; x 17 1/2&quot; Geopilot and XR reamer BHA</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">25</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Downloaded memory data from MWD.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>B/O and racked back 16&quot; x 17 1/2&quot; Geopilot and XR reamer BHA</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Prepared for repairing annular preventer. Removed PS-30, diverter, mandrel etc.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting with new crew prior to N/D diverter and mandrel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>N/D diverter and mandrel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Cleaned annular preventer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting prior to repairing annular preventer. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Repaired annular preventer. Removed top on annular preventer. Replaced seals. No visible damage on seals. Inspected annular element. No excessive damage to packer element. Dimanteled annular preventer to inspect/replace seals on outer cylinder.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 31/2-D-2 AY3H</witsml:nameWell><witsml:nameWellbore>NO 31/2-D-2 AY3H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:56:31.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>31/2-D-2 AY3H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>31/2-D-2 AY3H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6621</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>North Atlantic Drilling Limited </witsml:drillContractor><witsml:rigAlias><witsml:name>WEST VENTURE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>297055</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">1925</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.4</witsml:strengthForm><witsml:mdStrengthForm uom="m">1566</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1482.2</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">1934.5</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1603.5</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">35.5</witsml:elevKelly><witsml:sum24Hr>Inflow tested DHSV.
6 +Installed tubing hanger debris plug.
7 +Disconnected and pulled THROT.
8 +Prepared for pulling BOP.</witsml:sum24Hr><witsml:forecast24Hr>Waiting for a suitable weather window for pulling of BOP</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
9 +
10 +<witsml:fluid><witsml:type>NaCl Solids Free</witsml:type><witsml:dTim>2011-10-03T15:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">1034</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.12</witsml:density><witsml:pv uom="mPa.s">13</witsml:pv><witsml:yp uom="Pa">7.5</witsml:yp></witsml:fluid>
11 +
12 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. further operations stopped as weather is too rough for pulling of BOP .
13 + Estimated weather window for pulling of BOP is Oct. 5, afternoon and onwards.
14 +Weather/ rig movements at 0600hrs :19 m/s, max waves 8,7 m, pitch 5,5 deg, roll 4,8 deg, heave 2,9 m
15 +</witsml:extendedReport >
16 +
17 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1925</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Inflow tested DHSV as follows: Pressured up string to 125 bar against both HCM-A&apos;s and GLV. Closed DHSV and bled off pressure above to 55 bar and monitored 1/2 hr for pressure build-up. Bled further to 5 bar and monitored 10 min for pressure build-up. Equalized pressure across DHSV w 125 bar and opened DHSV, then bled off pressure to zero. Confirmed total volume pumped in equalling total volume bled off. Closed DHSV. Final status : Both HCM-A&apos;s and GLV closed</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1925</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged up wireline equipment and toolstring with 4.688&quot; R-line plug</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">371.2</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Set 4,688&quot; debris plug in wellhead nipple profile.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">371.2</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with wireline toolstring and rigged down.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">371.2</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Retracted THROT indicator pin and unlatched THROT. Disconnected THROT and pulled above BOP.
18 +Broke out XO-block and laid out same in chute and dismantled working platform and 2&quot; hose. Removed 16&quot; elevator and the extra long bails and installed 500 t drilling bails and elevator. Laid out lo-torque manifold and hoses prior to tripping.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with THROT and laid out same</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned and tidied rig floor. Doped pipe and removed Weatherford tong from drill floor</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 450 t elevator, checked saver sub and removed rotary table. Installed spider.
19 +Meanwhile displaced riser to sea water, kill/choke lines to drill water through boost line.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Stopped further operations as weather window for pulling of BOP was not available on forecast. Estimated weather window for pulling of BOP is Oct. 5, afternoon and onwards.
20 +Weather at 2400hrs : 20 m/s, max waves 6,7 m, pitch 4deg, roll 4 deg, heave 1,8
21 +Meanwhile performed bi-weekly pressure testing of choke manifold.
22 +</witsml:comments></witsml:activity>
23 +
24 +
25 +
26 +
27 +
28 +
29 +
30 +
31 +
32 +
33 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 31/2-G-4 BY1H</witsml:nameWell><witsml:nameWellbore>NO 31/2-G-4 BY1H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:57:03.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>31/2-G-4 BY1H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>31/2-G-4 BY1H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6679</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>SONGA TRYM</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>296164</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5362</witsml:md><witsml:tvd uom="m">1593.6</witsml:tvd><witsml:diaHole uom="in">8.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">1963</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.4</witsml:strengthForm><witsml:mdStrengthForm uom="m">1564.4</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1485.4</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">10.75</witsml:diaCsgLast><witsml:mdCsgLast uom="m">1962</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1594.6</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">146</witsml:distDrill><witsml:elevKelly uom="m">25</witsml:elevKelly><witsml:sum24Hr>Drilled 8 1/2&quot; hole to TD at 5362 m. Circulated hole clean and displaced well to 1,07 sg SFCF. Started to pull out of hole with the 8 1/2&quot; Drilling assembly, experienced &quot;tight&quot; hole. </witsml:sum24Hr><witsml:forecast24Hr>Pull out of hole with the 8 1/2&quot; drilling assembly. Lay out worn 5&quot; drill pipe to deck. Rig up to and start run 6 5/8&quot; lower screen completion.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +<witsml:bitRecord><witsml:numBit>8</witsml:numBit><witsml:diaBit uom="in">8.5</witsml:diaBit><witsml:manufacturer>Reed-Hycalog</witsml:manufacturer><witsml:codeMfg>RSH616D-F5</witsml:codeMfg></witsml:bitRecord>
7 +<witsml:fluid><witsml:type>Perfflow CM</witsml:type><witsml:dTim>2011-10-03T04:00:00.000Z</witsml:dTim><witsml:md uom="m">5295</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.07</witsml:density><witsml:pv uom="mPa.s">8</witsml:pv><witsml:yp uom="Pa">13.5</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>Perfflow CM</witsml:type><witsml:dTim>2011-10-03T14:00:00.000Z</witsml:dTim><witsml:md uom="m">5362</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.07</witsml:density><witsml:pv uom="mPa.s">9</witsml:pv><witsml:yp uom="Pa">14</witsml:yp></witsml:fluid>
8 +<witsml:porePressure><witsml:readingKind>estimated</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">.88</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5362</witsml:md></witsml:porePressure>
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 4875. Staged up pumps to 2500 lpm / 157 bar / 130 rpm and downlinked to Autotrak steerforce &quot;0&quot; in preparation to hole cleaning circulation. Reciprocated string over full stand. Depth: 4875. Circulated 26 M3 HiVis pill followed by 1,07 sg SFCF / total pumped 2,6 times bottoms up. 2500 lpm / 160 bar / 130 - 140 rpm. Reciprocated string over full stand. Minor increase in cuttings load over shakers with first bottoms up. No improved hole cleaning conditions observed with the HiVis pill over shakers. Downlinked to &quot;Ribs off&quot;. 7 M3/hr dynamic losses. Depth: 4852. Flowchecked well - 1000 l/hr static losses. Depth: 4780. Pulled wet out of hole with the 8 1/2&quot; drilling assembly from 4852 m to 4780 m. Observed drag in string. Depth: 4649. Lubricated out of hole on one stand. Continued to pull out of hole from 4762 m to 4649 m, monitored carefully development in drag / overpull. Observed decreasing drag. Experienced problem breaking connections. Performed pre-job meeting prior to use manuel Rig tongs. Broke out four over-torqued 5 1/2&quot; drill pipe connections.</witsml:extendedReport >
10 +<witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5248.8</witsml:md><witsml:tvd uom="m">1596.9</witsml:tvd><witsml:incl uom="dega">92.51</witsml:incl><witsml:azi uom="dega">355.02</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5277.9</witsml:md><witsml:tvd uom="m">1595.66</witsml:tvd><witsml:incl uom="dega">92.37</witsml:incl><witsml:azi uom="dega">354.7</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5306.6</witsml:md><witsml:tvd uom="m">1595.08</witsml:tvd><witsml:incl uom="dega">89.94</witsml:incl><witsml:azi uom="dega">352.23</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5335.3</witsml:md><witsml:tvd uom="m">1594.6</witsml:tvd><witsml:incl uom="dega">91.96</witsml:incl><witsml:azi uom="dega">351.52</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">5350.9</witsml:md><witsml:tvd uom="m">1594.04</witsml:tvd><witsml:incl uom="dega">92.19</witsml:incl><witsml:azi uom="dega">350.48</witsml:azi></witsml:surveyStation>
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">5288</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 1/2&quot; hole from 5216 m to 5288 m, avg. ROP: 22 m/hr, WOB 5-10 ton. 2510-2515 lpm / 145-155 bar. 135-150 rpm / 32-45 kNm. ECD 1,34 sg. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">5298</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 1/2&quot; hole from 5288 m to 5298 m, avg. ROP: 3,6 m/hr, WOB 11-15 ton. 2500 lpm / 156 bar. 135 rpm / 35-43 kNm. ECD 1,29 sg. Drilled calcite cemented stringers. Reduced flowrate and RPM to 2000 lpm/100 rpm from 5295 m in order to improve steerability.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">5362</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 1/2&quot; hole from 5298 m to TD at 5362 m, avg. ROP: 9,8 m/hr, hr, WOB 4-15 ton. 2500 lpm / 160 bar. 125 - 135 rpm / 37-43 kNm. ECD 1,33 - 1,36 sg. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">5362</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped 0,42 times bottms up, followed by 10 M3 1,32 sg Hi weight pill. Circulated hole clean over shakers. 2500 lpm / 160 bar / 150 rpm. Total pumped 24000 strokes, two times bottoms up.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">5362</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped 24 M3 HiVis pill into string in preparation to displacement to SFCF. Racked back drilling stand. Flowchecked well, 2,5 M3/hr static losses.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">5353</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- casing</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Moved up and installed the remote operated casing tong on the Rig floor. Meanwhile pump room prepared for the displacement.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">5353</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed Pre-job meeting prior to the displacement.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">5353</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Displaced well from 1,07 sg PerfFlow mud to 1,07 sg SFCF fluid at 2500 lpm / 160 bar / 120 rpm. Downlinked to AutoTrak &quot;Ribs off&quot;. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">5353</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- pressure detection</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well, 2,1 M3/hr losses.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">5258</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled wet out of hole with the 8 1/2&quot; drilling assembly from 5353 m to 5258 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">5258</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Observed correct pipe displacement and pumped slug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">4992</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out of hole with the 8 1/2&quot; drilling assembly from 5258 m to 4992 m. Observed increasing overpull. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">4877</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued to pull out of hole with the 8 1/2&quot; drilling assembly. Observed increasing overpulls up to 20 ton, &quot;freed&quot; pipe by downwards movement and occasionally rotation. Unable to pull upwards without overpulls. Suggesting cuttings build up around the bottom hole assembly. Circulated with 1000 lpm / 43 bar for 5 min. Lubricated out of hole with the 8 1/2&quot; drilling assembly from 4992 m to 4877 m, 250 - 350 lpm / 10 - 40 bar. Observed pressure build up and overpulls at upwards movements.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +<witsml:lithShowInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:mdTop uom="m">5180</witsml:mdTop><witsml:mdBottom uom="m">5362</witsml:mdBottom><witsml:tvdTop uom="m">1597.1</witsml:tvdTop><witsml:tvdBottom uom="m">1593.6</witsml:tvdBottom><witsml:lithology>Sandstone with some calcites</witsml:lithology></witsml:lithShowInfo>
17 +
18 +
19 +
20 +
21 +<witsml:gasReadingInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:readingType>drilling gas peak</witsml:readingType><witsml:mdTop uom="m">5285</witsml:mdTop><witsml:tvdTop uom="m">1595.5</witsml:tvdTop><witsml:gasHigh uom="%">6.27</witsml:gasHigh><witsml:meth uom="ppm">50845</witsml:meth><witsml:eth uom="ppm">4577</witsml:eth><witsml:prop uom="ppm">0</witsml:prop><witsml:ibut uom="ppm">693</witsml:ibut><witsml:nbut uom="ppm">673</witsml:nbut><witsml:ipent uom="ppm">363</witsml:ipent></witsml:gasReadingInfo><witsml:gasReadingInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:readingType>drilling gas peak</witsml:readingType><witsml:mdTop uom="m">5317</witsml:mdTop><witsml:tvdTop uom="m">1594.9</witsml:tvdTop><witsml:gasHigh uom="%">10.06</witsml:gasHigh><witsml:meth uom="ppm">90505</witsml:meth><witsml:eth uom="ppm">7263</witsml:eth><witsml:prop uom="ppm">0</witsml:prop><witsml:ibut uom="ppm">979</witsml:ibut><witsml:nbut uom="ppm">951</witsml:nbut><witsml:ipent uom="ppm">476</witsml:ipent></witsml:gasReadingInfo>
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 31/2-N-24 Y1H</witsml:nameWell><witsml:nameWellbore>NO 31/2-N-24 Y1H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:57:32.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>31/2-N-24 Y1H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>31/2-N-24 Y1H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4830</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2003-11-04T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2003-12-12</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Stena Drilling</witsml:drillContractor><witsml:rigAlias><witsml:name>STENA DON</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>297649</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">383.5</witsml:mdKickoff><witsml:diaCsgLast uom="in">6.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4290.3</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">24</witsml:elevKelly><witsml:sum24Hr>Ran in with clean-out BHA, displaced to 1,31 SG.
6 +Waited on Cement.
7 +Tagged TOC at 1130 m with 10 t.
8 +Ran in with casing cutter assembly, cut casing at 1081,18 m and 1037,5 m.
9 +</witsml:sum24Hr><witsml:forecast24Hr>Pull out with cutting BHA.
10 +Retrieve 13 3/8in wear bushing and seal assembly.
11 +Retrieve 13 3/8in casing.
12 +
13 +</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
14 +
15 +<witsml:fluid><witsml:type>KCl/Polymer/CaCO3</witsml:type><witsml:dTim>2011-10-03T20:30:00.000Z</witsml:dTim><witsml:md uom="m">1130</witsml:md><witsml:presBopRating uom="bar">1034</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.12</witsml:density><witsml:pv uom="mPa.s">16</witsml:pv><witsml:yp uom="Pa">14</witsml:yp></witsml:fluid>
16 +
17 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 12. Continued to pull out with the cutting BHA to 12 m. Depth: 0. Laid down the cutting BHA. Depth: 0. Held toolbox talk. Depth: 30. Picked up and made up the jet sub and MUT to 5 1/2in drill-pipe. Depth: 340. Ran in MUT with 5 1/2in drill-pipe to 340 m. Depth: 370. Made up the top-drive and jetted the well-head area, 370 m, at 2000 lpm, 14 bar. Continued down and latched the MUT into the 13 3/8in wear-bushing, which was at 370 m, and pulled up same. Observed 21 t over-pull. Pulled back until the jet sub was at the well-head depth, 370 m. Jetted the well-head area 2000 lpm, 14 bar. Depth: 3. Pulled out with the jet tool and MUT/wear-bushing on 5 1/2in drill-pipe to surface. Depth: 0. Pulled the 13 3/8in wear-bushing through the rotary, inspected and released same from the MUT. Racked the MUT/ jet sub assembly. Cleared the drill-floor off excess equipment. Depth: 0. Held toolbox talk for retrieving the 13 3/8&quot; seal assembly. Depth: 30. Picked up and made up the HPORT, to stand 5 1/2in drill-pipe.
18 +Heave as measured at the drill-floor average 2,1 m, max 4,0 m.
19 + Depth: 30. WOW. Rig heave average 2,5 m, max 4,0 m.
20 +Limitation for retrieving the seal assembly with the HPORT, 2 m.</witsml:extendedReport >
21 +
22 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1078</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued to run in with clean-out BHA from 330 m to 1078 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">1078</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held toolbox talk.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1078</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Displaced the kill, choke and booster lines from 1,12 SG CaCO3 to 1,31 SG Aquadrill. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">1090</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Washed down to 1090 m, and displaced from 1,12 SG CaCO3 to 1,31 SG Aquadrill, 3500 lpm, 61 bar, increasing to 90 bar. 11 rpm.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1090</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on Cement to set up enough to tag it at 10 t.
23 +Meanwhile, stopped pumping and prepared more mud to 1,31 SG. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1090</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on Cement to set up enough to tag it at 10 t.
24 +Meanwhile, circulated and conditioned mud, 2000 lpm, 37 bar and carry out planned maintenance.
25 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1090</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on Cement to set up enough to tag it at 10 t.
26 +Meanwhile, circulated and conditioned mud, 2000 lpm, 37 bar and carry out planned maintenance.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1130</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Washed down from 1090 m 500 lpm, 7 bar. Tagged cement at 1130 m, with 10 t.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1130</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Circulated bottoms up from 1130 m at 4000 lpm, 110 bar. Monitored for cement traces in returns, none observed. Slugged the pipe.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:20:00.000Z</witsml:dTimEnd><witsml:md uom="m">96</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with the clean-out BHA to 96 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:20:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">96</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held toolbox talk.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Racked back 6 1/2in drill-collars stands, and laid down the jar and junk mill BHA.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held toolbox talk.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">12</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling equipment to 5 1/2in. Picked up the taper mill and casing cutting assembly and surface tested same.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">700</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran in with the casing cutters on 5 1/2in drill-pipe from 12 m to 700 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">700</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up and made up a pup joint and marine swivel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:25:00.000Z</witsml:dTimEnd><witsml:md uom="m">1078</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran in with the marine swivel on 5 1/2in drill-pipe to 1078 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:25:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">1098</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran in with the marine swivel on 5 1/2in drill-pipe to 1078 m.
27 +Top-filled the pipe and landed the swivel onto the wear-bushing with 10 t down-weight.
28 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1098</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Set up the cutting parameters, 300 lpm, 10bar; 500 lpm, 16 bar; 700 lpm, 23 bar. 100 rpm 7 kNm.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1098</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut the casing at 1081.18 m with 100 rpm, 7-8 kNm, 700 lpm, 22 bar. Observed torque increase to 15 kNn and the pressure spiked to 30 bar. Observed both the pressure and torque decrease to 5-7 kNm, 15 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1098</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow-checked.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:20:00.000Z</witsml:dTimEnd><witsml:md uom="m">733</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with the marine swivel to 733 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:20:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">678</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Laid out the marine swivel. Spaced out and laid out 1x pup, 1x stand, 1x single. Picked up and made up the marine swivel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:35:00.000Z</witsml:dTimEnd><witsml:md uom="m">1031</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran in with the marine swivel on 5 1/2in drill-pipe to 1031 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:35:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1050</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Made up the top-drive and top-filled the pipe. Ran down and landed the marine swivel onto the wear-bushing with 10 t down-weight. Set up the cutting parameters 500 lpm, 11 bar; 800 lpm, 25 bar; 100 rpm / 6 kNm.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1050</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut the casing at 1037.50 m with 100 rpm, 7-8 kNm, 800 lpm, 30 bar. Observed torque increase to 14 kNm and pressure spiked to 38 bar. Observed both pressure and torque decreased to 6-7 kNm, 18 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:50:00.000Z</witsml:dTimEnd><witsml:md uom="m">1050</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow-checked. Slugged the pipe.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:50:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">686</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with the marine swivel to 686 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">676</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Laid out the marine swivel and spaced out drill-pipe.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">657</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with cutting BHA to 657 m.</witsml:comments></witsml:activity>
29 +<witsml:logInfo><witsml:runNumber>1</witsml:runNumber><witsml:serviceCompany>Schlumberger</witsml:serviceCompany><witsml:mdTop uom="m">-9999</witsml:mdTop><witsml:mdBottom uom="m">-9999</witsml:mdBottom><witsml:tool>CCL - USIT - CBL</witsml:tool><witsml:tempBHST uom="degC">-9999</witsml:tempBHST><witsml:eTimStatic uom="h">-9999</witsml:eTimStatic><witsml:mdTempTool uom="m">-9999</witsml:mdTempTool></witsml:logInfo><witsml:logInfo><witsml:runNumber>2</witsml:runNumber><witsml:serviceCompany>Schlumberger</witsml:serviceCompany><witsml:mdTop uom="m">850</witsml:mdTop><witsml:mdBottom uom="m">1477</witsml:mdBottom><witsml:tool>CCL - USIT - CBL</witsml:tool><witsml:tempBHST uom="degC">-9999</witsml:tempBHST><witsml:eTimStatic uom="h">-9999</witsml:eTimStatic><witsml:mdTempTool uom="m">-9999</witsml:mdTempTool></witsml:logInfo>
30 +
31 +
32 +
33 +
34 +
35 +
36 +
37 +
38 +
39 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 31/4-A-14 E</witsml:nameWell><witsml:nameWellbore>NO 31/4-A-14 ET2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:57:58.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>31/4-A-14 E</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>31/4-A-14 ET2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6623</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2011-08-06T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>KCA Deutag Drilling Norge AS</witsml:drillContractor><witsml:rigAlias><witsml:name>BRAGE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>277405</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">6523</witsml:md><witsml:tvd uom="m">2316.2</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">6523</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.4</witsml:strengthForm><witsml:mdStrengthForm uom="m">5572</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2117.7</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">6522</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2316.1</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">62.6</witsml:elevKelly><witsml:sum24Hr>POOH with 5 7/8&quot; cmt drill-out assy from 4146 m. Bit worn out. Cut and slipped drilline. Changed phone light in drk. Ran test plug with weight below. Repaired leaky choke man. valve. Tested BOP. Pulled test plug.</witsml:sum24Hr><witsml:forecast24Hr>Pull BOP test string. Test top drive valves and Kelly hose. RIH with 5 7/8&quot; cmt drill-out assy. Drill cmt. in 7&quot; liner from 6411 m.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +<witsml:bitRecord><witsml:numBit>16</witsml:numBit><witsml:diaBit uom="in">5.875</witsml:diaBit><witsml:manufacturer>Security DBS</witsml:manufacturer><witsml:codeMfg>QH4GR</witsml:codeMfg></witsml:bitRecord><witsml:bitRecord><witsml:numBit>17</witsml:numBit><witsml:diaBit uom="in">5.875</witsml:diaBit><witsml:manufacturer>Smith Bits</witsml:manufacturer><witsml:codeMfg>XR+</witsml:codeMfg></witsml:bitRecord>
7 +<witsml:fluid><witsml:type>Versatec</witsml:type><witsml:dTim>2011-10-03T20:00:00.000Z</witsml:dTim><witsml:md uom="m">6411</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.31</witsml:density><witsml:pv uom="mPa.s">42</witsml:pv><witsml:yp uom="Pa">9</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. POOH 2 stands and laid down 8 singles of 5&quot; HWDP used as weight below test plug. Depth: 0. Connected swedge and HP-hose to top drive.
10 +Pressure tested top drive valves and Kelly hose to 20/ 295 bar for 5/ 10 minutes.
11 +Removed swedge and HP-hose.
12 +Meanwhile: Function tested shear ram. Depth: 0. Changed to 3 1/2&quot; handling equipment. Depth: 22. Picked up 4 3/4&quot; DC with 5 3/4&quot; stabilizer and old 5 7/8&quot; bit.
13 +Changed bit. Checked float in stabilizer, ok.
14 +Made up 1 single DC from deck. Depth: 106. Ran 4 3/4&quot; DC stand, jar stand and accelerator stand. Depth: 106. Changed to PS-slips. Changed to 4&quot; handling equipment. Depth: 340. RIH with 5 7/8&quot; cement clean-out assembly from 106 m to 340 m, on 4&quot; DP.
15 +Tripping speed limited due to wind direction. Watched hoses/ service loop pass freely in derrick.</witsml:extendedReport >
16 +
17 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1200</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 5 7/8&quot; cement drill-out assembly from 4146 m to 1200 m, on 5 1/2&quot; DP.
18 +Meanwile: Pressure tested standpipe- and choke manifolds, ongoing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1200</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 4&quot; handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">200</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 5 7/8&quot; cement drill-out assembly from 1200 m to 200 m, on 4&quot; DP.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 5 7/8&quot; cement drill-out assembly from 200 m to 136 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well for 15 minutes before BHA.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to master bushing. Changed to 3 1/2&quot; handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held handover and prejob meeting with day crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Racked 1 DC stand, jar stand and accelerator stand. Laid down 2 single DC&apos;s with bit and
19 +stabilizers. Dir. driller checked bit and stabilizers.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned and cleared rig floor. Prepared next operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held prejob meeting for cut and slip of drilline according to A-standard method.
20 +Went through relevant Wellman procedure.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Hung off travelling block. Prepared to cut and slip.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut and slipped 33 m drilline. Checked drawworks brakes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed and secured hang-off line.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reset anti collision system.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5&quot; handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Statoil electrician changed telephone flashing light on URA cabin in derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with 8 singles from deck and 2 stands of 5&quot; HWDP for weight below test plug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran test plug on 4 singles of 5&quot; DP from deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot leaky choke manifold valve no. 24.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Dismantled and repaired leakage through stem on gate valve. Reinstalled valve.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested choke valve no. 24 to 20 bar/ 5 min and 345 bar/ 10 min.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested pipe rams to 20/ 295 bar and annular preventer to 20/ 239 bar - 5/ 10 minutes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled test plug and laid down 4 singles of 5&quot; DP.</witsml:comments></witsml:activity>
21 +
22 +
23 +
24 +
25 +
26 +
27 +
28 +
29 +
30 +
31 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/12-B-42 A</witsml:nameWell><witsml:nameWellbore>NO 33/12-B-42 AT2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:00:47.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>33/12-B-42 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>33/12-B-42 AT2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5309</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dateDrillComplete>2007-01-05</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>DeepWell</witsml:drillContractor><witsml:rigAlias><witsml:name>STATFJORD B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271301</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4860</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.75</witsml:strengthForm><witsml:mdStrengthForm uom="m">2094</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1829</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4503.5</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">77.8</witsml:elevKelly><witsml:sum24Hr>Performed time base log up from 760 m to surface. Bullheaded well with 100 m3 injection water.
6 +RIH with EVO plug to 2286 m. Not able to activate tractor. POOH and not able to pass X-0 restriction to 812 m. Pumped 10 m3 injection water with RX in to the well. Worked string up and down. Still not able to pass restriction at 812 m. Set plug at 812 m. POOH.
7 +RIH and fished plug at 812 m. POOH.</witsml:sum24Hr><witsml:forecast24Hr>WOW due not able to brake lubricator and L/D BHA #4. L/D BHA #4. RIH with EVO dummy plug drift to 4500 m. POOH. RIH and install EVO plug a 4450 m. POOH.
8 +Operational target tomorrow 06.00: Rig over to slick line. </witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
9 +
10 +
11 +
12 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. WOW. Not able to break lubricator and L/D BHA #4 due to high wind. Depth: 0. Broke lubricator. L/D BHA #4 with EVO plug on deck. Observed 2 small marks on the shoulder top of plug. Depth: 0. Built new cabel head. Tested tractor and toolstring. Depth: 0. M/U BHA #5 ( dummy plug drift run). Stabbed lubricator. Leak tested QTS to 345 bar. Opened up well. WHP 33 bar. Depth: 1300. RIH with BHA #5 to 1300 m.</witsml:extendedReport >
13 +
14 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed time base log up from 760 m to surface with 15 m/min. Recorded station every 10 m for 15 seconds.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Closed in well. WHP 46 bar. Inflow tested HMV and swab. Broke lubricator. L/D BHA #2 on deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Tested tractor and toolstring signals. Prepared EVO plug toolstring on deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U BHA #3 (EVO plug). Stabbed lubricator. Leak tested QTS to 345 bar. Opened up well. WHP 46 bar</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Bullheaded 3 m3 50/50 TEG, 17 m3 injection water with 750 lpm.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Completed bullheading of well with a total of 100 m³ injection water. Maximum rate: 950 l/min. SIWHP dropped to 0 bar. Topped up with 3m³ 50/50% TEG mix. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2286</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH w/ run #3 EVO plugg from 0 m to 2286 m, WHP 0 bar. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2286</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Attempted several times to activate tractor. No go. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">812</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>POOH from 2286 m. Hung up in SPM at 1388 m. Worked string free from restriction. Continued POOH. Hung up in X/O at 812 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">812</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Attempted several times to pass restriction without success. Pulled up to 2500 lbs on surface. Also stuck for downwards movement. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">812</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Mixed 10 m³ injection water with 2% RX - 72 friction reducer. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">812</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Lined up and pumped 1 m³ TEG mix, 10 m³ inj. water with 2% RX, 4 m³ inj. water og 1 m³ TEG mix.
15 +SIWHP before pumping 34 bar. Max rate: 150 l/min. SIWHP after pumping 0 bar. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">812</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Pulled 2300 lbs on surface. Still not able to pass restriction. Set plug with midt packer element at 811 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>POOH from 812 m to surface.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Closed in X-mas tree. WHP 10 bar. Inflow tested HMV and swab. Broke lubricator. L/D BHA #3. Observed 1 stuck wheel on tractor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Built new cabel head. M/U BHA #4( pull EVO plug). Stabbed lubricator and leak tested QTS to 345 bar. Opened up well. WHP 22 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">800</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>RIH with BHA #4 to 800 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">800</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Pumped up tubing above plug to 40 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">812</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>RIH from 800 m to 812 m and latched on EVO plug. Equalized plug. WHP dropped to 15 bar. Jarred up 1 stroke plug free.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">800</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>POOH from 812 m to 800 m. Waited 30 min for plug element to retrack.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>POOH from 800 m to surface. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>stuck equipment</witsml:stateDetailActivity><witsml:comments>Closed in X-mas tree. WHP 10 bar. Inflow tested HMV and swab.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW. Not able to break lubricator and L/D BHA #4 due to high wind.</witsml:comments></witsml:activity>
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +
25 +
26 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-A-37 C</witsml:nameWell><witsml:nameWellbore>NO 33/9-A-37 C</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:59:10.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>33/9-A-37 C</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>33/9-A-37 C</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6610</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2011-06-01T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Archer</witsml:drillContractor><witsml:rigAlias><witsml:name>STATFJORD A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271273</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2497</witsml:md><witsml:tvd uom="m">2472.5</witsml:tvd><witsml:diaHole uom="in">8.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2465</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.62</witsml:strengthForm><witsml:mdStrengthForm uom="m">2463</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2440</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2463.5</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">64.5</witsml:elevKelly><witsml:sum24Hr>Waited for additional premix to arrive on location. Offloaded boat and started to mix new 1,23 sg WARP mud. Pulled out of hole to 1999 m. Draw-work disc brake failure caused elevator to land on rotary, setting down 20 tons. Troubleshot failed brake and loss of power to draw-works electric motors. Well was observed on trip tank while troubleshooting.</witsml:sum24Hr><witsml:forecast24Hr>Continue to troubleshoot and rectify fault in draw-work brake system. Continue to pull out of hole to 800 m and commence displacing well to 1,23 sg WARP mud in stages.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +<witsml:bitRecord><witsml:numBit>7</witsml:numBit><witsml:diaBit uom="in">8.5</witsml:diaBit><witsml:manufacturer>Security DBS</witsml:manufacturer><witsml:codeMfg>FMR3753Z</witsml:codeMfg></witsml:bitRecord>
7 +<witsml:fluid><witsml:type>WARP (Oil Based)</witsml:type><witsml:dTim>2011-10-03T20:00:00.000Z</witsml:dTim><witsml:md uom="m">2497</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.23</witsml:density><witsml:pv uom="mPa.s">14</witsml:pv><witsml:yp uom="Pa">2</witsml:yp></witsml:fluid>
8 +<witsml:porePressure><witsml:readingKind>estimated</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">.98</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2497</witsml:md></witsml:porePressure>
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 1999. Continued troubleshooting fault in draw-work control system. Observed well on trip tank. </witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2444</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for additional amount of premix required for reduction of mudweight to arrive.
12 +Continued to observe well and reciprocate drill string at intervalls to ensure free movement.
13 +Performed planned maintenance while waiting.
14 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2444</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for additional amount of premix required for reduction of mudweight to arrive.
15 +Offloaded boat and started to mix new WARP mud with 1,23 sg.
16 +Continued to observe well and reciprocate drill string at intervalls to ensure free movement.
17 +Performed planned maintenance while waiting.
18 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1999</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out of hole from 2444 m to 1999 m (average pulling speed: 356 m/hr).
19 +Operation stopped due to draw-work brake failure.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1999</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Draw-work power and brake failure.
20 +Upon coming down with an empty block the draw-works parking brake failed to engage, simultaneously as the electric motors for the draw-work tripped out. This caused the traveling block to slide down until elevator landed on top of slips in rotary table setting down 20 tons on bails/elevator.
21 +Immediately started to troubleshoot fault in draw-work control system. Observed well on trip tank. </witsml:comments></witsml:activity>
22 +
23 +
24 +
25 +
26 +
27 +
28 +
29 +
30 +
31 +
32 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-C-5 C</witsml:nameWell><witsml:nameWellbore>NO 33/9-C-5 C</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:59:37.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>33/9-C-5 C</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>33/9-C-5 C</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5837</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2008-05-01T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2008-07-15</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Archer</witsml:drillContractor><witsml:rigAlias><witsml:name>STATFJORD C</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271329</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2994</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.75</witsml:strengthForm><witsml:mdStrengthForm uom="m">3719</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2520</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3711</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2517</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">78.2</witsml:elevKelly><witsml:sum24Hr>Pulled completion and control lines from 2950 mMD to 274 mMD.</witsml:sum24Hr><witsml:forecast24Hr>POOH remaining completion string. M/U and RIH with 5&quot; dress off mill, 7 5/8&quot; scraper and magnet BHA&apos;s on 3 1/2&quot; DP, M/U 9 5/8&quot; scraper and magnet BHA and RIH on 5&quot; DP.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +<witsml:fluid><witsml:type>Kill fluid</witsml:type><witsml:dTim>2011-10-03T23:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">-9999</witsml:density><witsml:pv uom="mPa.s">17</witsml:pv><witsml:yp uom="Pa">17.5</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 701. B/O and L/D 5 1/2&quot; tubing joint and 5 1/2&quot; x 7&quot; x-over. Depth: 701. Changed to 7&quot; handling equipment Depth: 348. POOH 7&quot; tubing and control lines. Average pulling speed 9 - 10 jt/hr. Depth: 348. Changed to 5 1/2&quot; handling equipment Depth: 274. B/O and L/D 4 x 5 1/2&quot; joints and SPM. Depth: 274. Removed clamps from chemical injection mandrel.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2950</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling gear to pull 7&quot; tubing and rigged the control lines over the sheave wheels to spooling unit.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2250</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 7&quot; tubing and control lines. Average pulling speed 8 - 9 jt/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2021</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 7&quot; tubing and control lines. Average pulling speed 9 - 10 jt/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2021</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Stopped POOH due to problem with elevators. Trouble shot elevator and cyberbase.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1867</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 7&quot; tubing and control lines. Average pulling speed 9 - 10 jt/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1867</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5 1/2&quot; handling equipment</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1812</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 3 x 5 1/2&quot; tubing joint and L/D, B/O and L/D SPM.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1812</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 7&quot; handling equipment</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1285</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 7&quot; tubing and control lines. Average pulling speed 9 - 10 jt/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1285</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5 1/2&quot; handling equipment</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1285</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>B/O and L/D 3 x 5 1/2&quot; tubing joints. B/O and L/D SPM.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1229</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 7&quot; handling equipment</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1229</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 7&quot; tubing and control lines. Average pulling speed 9 - 10 jt/hr. Meanwhile filled trip tank.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1062</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Stopped POOH and lifted slings for tubing with pipe handling crane as rig cranes down due to high winds.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">763</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH 7&quot; tubing and control lines. Average pulling speed 9 - 10 jt/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">763</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5 1/2&quot; handling equipment</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">721</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- completion string</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>B/O and L/D 2 x 5 1/2&quot; tubing joints and SPM.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-E-1 H</witsml:nameWell><witsml:nameWellbore>NO 33/9-E-1 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:00:02.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>33/9-E-1 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>33/9-E-1 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>2417</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>1996-03-13T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>DeepOcean</witsml:drillContractor><witsml:rigAlias><witsml:name>EDDA FAUNA</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>403711</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3322.2</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">2</witsml:elevKelly><witsml:sum24Hr>None</witsml:sum24Hr><witsml:forecast24Hr>None</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 265. Continued mobilizing equipment for Statfjord Nord E-1 H, E-4 H and Vigdis G-1 H.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">262</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Started mobilising equipment for well Statfjord E-1 H, E-4 H and Vigdis G-1 H.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-M-3 H</witsml:nameWell><witsml:nameWellbore>NO 33/9-M-3 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:00:24.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>33/9-M-3 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>33/9-M-3 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4445</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dateDrillComplete>2002-01-14</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Island Offshore Management</witsml:drillContractor><witsml:rigAlias><witsml:name>ISLAND FRONTIER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>373829</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">222</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4512.5</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2536</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">3</witsml:elevKelly><witsml:sum24Hr>Transit to shore, with stop at Fedjeosen for lubrication of ROV umbilical¿s. Moored alongside RO-RO quay at CCB. Demobilized Statfjord Øst M-3H equipment.</witsml:sum24Hr><witsml:forecast24Hr>Complete demobilizing Statfjord Øst M-3H equipment.
6 +Status 06:00 No operation
7 +</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +
9 +
10 +
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. </witsml:extendedReport >
12 +
13 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Retrieved TCRT to surface. Released &amp; retrieved GW#3. Landed TCRT on skid and disconnected LS reel.Skid out TCRT and sea fastened same.
14 +Meanwhile:
15 +ROV closed ROV basket .
16 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Deployed GW#3 connect ROV hook on transponders and retrieved to surface. Deployed GW # 3 connect ROV hook on ROV basked and retrieved to surface.Performed valve status check. Opened 3-C Annulus manifold valve 90º CCW.
17 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Deployed GW #3 w/forerunner for close hatchers. Closed hatches. Retrieved GW #3.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed as left survey. Opened MC 31 with 35 turn CCW and 237 NM. Retrieved Magnum ROV.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- transit</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Transit to shore, with stop at Fedjeosen for lubrication of ROV umbilicals. ETA 19:00 CCB. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- transit</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Deployed both ROV&apos;s and lubricated the umbilicals.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- transit</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued transit to shore, ETA 19:00 CCB. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Moored alongside RO-RO quay at CCB. Skid stack into MTH. Split stack and skid out connector.
18 +Cut off sea fasting on deck.
19 +Backloaded:
20 +AWS / Halliburton Explosive cont.
21 +Welltec 8m basked
22 +2 ea AWS 7/16 logging cont.
23 +Halliburton 8m basked.
24 +Baker oil tool basked.
25 +Halliburton 8 ft container.
26 +Connector.</witsml:comments></witsml:activity>
27 +
28 +
29 +
30 +
31 +
32 +
33 +
34 +
35 +
36 +
37 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-A-10 A</witsml:nameWell><witsml:nameWellbore>NO 34/10-A-10 A</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:02:57.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/10-A-10 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/10-A-10 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>3026</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Archer</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271833</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2084</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">2205.2</witsml:mdKickoff><witsml:diaCsgLast uom="in">2.875</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2464.8</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1925.8</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">85</witsml:elevKelly><witsml:sum24Hr>Run USIT log in 7&quot; and 9 5/8&quot; casing. R/D WL. Slipped and cut drilling line. Repaired leakage on shearram sylinder.</witsml:sum24Hr><witsml:forecast24Hr>RIH with 3 1/2&quot; cement stinger to 2095 m. Circulate and condition mud prior to cement job. Set balanced cement plug from 2095 m. Circulate out excess and clean pipe. POOH with 3 1/2&quot; cement stinger. RIH with 8 1/2&quot; dress off assy. WOC.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +<witsml:fluid><witsml:type>Kill Fluid- SW/Polymer</witsml:type><witsml:dTim>2011-10-03T23:30:00.000Z</witsml:dTim><witsml:md uom="m">2117</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.82</witsml:density><witsml:pv uom="mPa.s">8</witsml:pv><witsml:yp uom="Pa">44.5</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 259. RIH with 3 1/2&quot; cement stinger on 3 1/2&quot; DP from surface to 259m. Checked every tool joint OD, max 5,5&quot;. Depth: 259. Changed to 5&quot; handling equipment. Depth: 269. P/U 1 single 5&quot; DP and M/U x-over and 5&quot; N-nipple- dartsub. Depth: 1900. RIH with 3 1/2&quot; cement stinger on 5&quot; DP from 269 m to 1900 m. Observed no restriction in 7&quot; liner hanger area.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">100</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre-job meeting prior to change items in tool string.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with USIT/ CBL from 100 m to surface.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed items in toolstring; Gemco and USRS-B to USRS-C. Changed out GPIT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed communication test.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1849</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with USIT/CBL from surface to 1849 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1384</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Logged USIT/CBL across interval 1849 m - 1384 m in 9 5/8&quot; casing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">540</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Logged USIT/CBL across interval 1384 m - 540 m in 9 5/8&quot; casing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1700</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with USIT/CBL from 540 m to 1700 m for repeat pass.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1637</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed repeat pass across interval 1700 m - 1637 m . </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1637</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Confirmed data in town.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with USIT/ CBL from 1637 m to surface.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre-job meeting prior to L/D toolstring and R/D wireline.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>L/D toolstring and R/D wireline equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre-job compass-meeting prior to slip and cut drilling line.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Hung off DDM. Observed leakage on BOP shearram sylinderbody.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged up, slipped and cut 33 m drill line. Meanwhile repaired shearram sylinderbody.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed hangoff line. Reset drawwork measure system. Tested anticollision system after slip and cut operation. Meanwhile continued repaired shearram sylinderbody.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Bled down pressure on BOP control unit. Tightened up studbolts on both shearram sylinders. Drained riser and function tested shearram. Filled up riser. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cement plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre-job DOP/ compass meeting prior RIH with 3 1/2&quot; cement stinger.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cement plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling equipment to 3 1/2&quot; DP.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +<witsml:equipFailureInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>well control equ syst -- bop stack</witsml:equipClass><witsml:eTimMissProduction uom="min">240</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-03T21:45:00.000Z</witsml:dTimRepair><witsml:description>Det var lekkasje mellom sylinder pos.6 og Dør pos.4 på shearram som vender mot Sør/Øst.
18 +Mutrer 8 stk pos.11 ble gjort opp med 1830nm.Dette ble testet og funnet iorden,men det var bevegelse I sylinder på andre siden(Nord/Vest)ingen lekkasje,men det ble bes</witsml:description></witsml:equipFailureInfo>
19 +
20 +
21 +
22 +
23 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-A-35</witsml:nameWell><witsml:nameWellbore>NO 34/10-A-35</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:03:18.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/10-A-35</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/10-A-35</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>1876</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>1992-01-27T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Halliburton</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271833</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:diaCsgLast uom="in">5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3017</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">85</witsml:elevKelly><witsml:sum24Hr>Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:sum24Hr><witsml:forecast24Hr> Waiting for chemicals to arrive from shore. </witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-A-40</witsml:nameWell><witsml:nameWellbore>NO 34/10-A-40</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:03:40.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/10-A-40</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/10-A-40</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>2070</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>1993-04-30T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Solution Services</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271833</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">547</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4949</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1860</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">82</witsml:elevKelly><witsml:sum24Hr>Waited for logging operation in well A-10. RIH with BHA# 1 Tractor and RST to 475 m. WL cabin and grease Skid shutt down. POOH fom 475 m. Statoil fire &amp; gas tested and solved system for EL. WL equipment.</witsml:sum24Hr><witsml:forecast24Hr>RIH with BHA# 1 Tractor and RST. Log RST - D in Brent: 4340 - 3840 m and in Cook: 3720 - 3380 m. </witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Equalized and opened HMV. Tested tractor and RST tool. Opened SV. WHP 92 bar. Depth: 2235. Ran in hole by gravity at 30 m/min lost weight at 2235 m. PU 50 m every 400 m (AWS procedure for new cable) Depth: 4280. Activated tractor and RIH from 2235 m to 4000 m 06:00. PU 50 m every 400 m (AWS procedure for new cable). Had to make 3 attempts to pass through straddle at 3548,5 m.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer. Meanwhile held A - standard / pre-job meeting with involved personnel on night shift.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed A - standard / pre-job meeting with involved personnel on day shift.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed communication checks on logging tools. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Leaktested lubricator to 20/345 bar for 5/10 min with 100 % MEG. Opened HMV. WHP 93,8 bar. Pumped 50 ltr 100% MEG to equalize DHSV. Pumped 4 m3 of base oil. Openes swab. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran in hole by gravity at 30 m/min to 475 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:35:00.000Z</witsml:dTimEnd><witsml:md uom="m">475</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Winch cabin and unit for grease supply shut down. Loosed electric power due to gas alarm in D-21. AWS contacted SKR. Pressured up stuffing box to keep well control.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Gas alarm in D-21 cleared out. Electric power turned on. POOH from 475 m to surface. Closed SV and HMV.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Evaluated situation. Discussed situation w/ Statoil fire &amp; gas prod dep. and electrician for sorting out why override of ignitionsource disconnection system failed.
12 +</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Statoil fire &amp; gas tested system for electric WL equipment. Solved the reason for cabin and grease loosed electric power shut down .Override of ignitionsource disconnection system for WL cabin was not activated on switchboard 17 - EN01.</witsml:comments></witsml:activity>
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-B-40 A</witsml:nameWell><witsml:nameWellbore>NO 34/10-B-40 A</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:04:03.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/10-B-40 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/10-B-40 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>3628</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Kvaerner Well Services</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271917</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4626</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">4.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4773</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2277.5</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">80.7</witsml:elevKelly><witsml:sum24Hr>Spotted equipment on BOP deck. Took over the well from production department. RU WL and pumping equipment on the well. On standby to lift up lubricator due to wind speed exceeded operation limit for WL crane. </witsml:sum24Hr><witsml:forecast24Hr>RIH with BHA#1 (WL brush). Spot Safe-Solv 148 and brush DHSV area. Inflow test DHSV and RD equipment from the well.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Performed pre-job meeting with night crew. Depth: 0. Waited on weather. Continued on standby due to strong wind. Depth: 0. Function test Well Equip jar. MU BHA#1 (6,3&quot; brush with 6,1&quot; no-go) and installed in lubricator. Leak tested RU to 20/345 bar 5/10 min. </witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed startup meeting with night crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Spotted WL and pumping equipment on work area. Prepared brush BHA. Lined up pumping lines towards the well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cont. spotting equipment in BOP area. Built scaffolding around X-mas tree.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for activity program to be signed. Meanwhile had start up meeting with day crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Production to hand over well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Handed well over from Production to Well operation. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RU pumping line from cement unit to KWV. RU lower riser and WL BOP. Function tested WL BOP. Leak tested riser and WL BOP to 20/345 bar for 5/10 mins. Leak tested pump line to 20/345 bar for 5/10 mins.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed A-standard meeting, evaluated situation prior proceed operation with respect to strong wind. Secured work place. On standby to lift up lubricator and BHA due to wind speed was up to 58 knots while max allowable wind speed to operate WL crane is 48 knots according to APOS.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-E-2 H</witsml:nameWell><witsml:nameWellbore>NO 34/10-E-2 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:04:23.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/10-E-2 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/10-E-2 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4107</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2000-08-05T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Songa Offshore</witsml:drillContractor><witsml:rigAlias><witsml:name>SONGA DEE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>290980</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4944</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3542.6</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">25</witsml:elevKelly><witsml:sum24Hr>R/D Riser Running Equipment.
6 +RIH and set WB.
7 +Function test BSR.
8 +Configure EDPHOT.
9 +RIH and recover shallow set plug to surface.
10 +RIH with bridge plug to 2168 m, function test BOP, continued to RIH to 3800 m.
11 +Set bridge plug at 3800 m.
12 +</witsml:sum24Hr><witsml:forecast24Hr>L/D 5&quot; Drill Pipe
13 +Tag cement plug
14 +Displace well to gel mud.
15 +POOH and P/U SRB cutting BHA.
16 +RIH and cut 9 5/8&quot; casing.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
17 +
18 +<witsml:fluid><witsml:type>Glydril</witsml:type><witsml:dTim>2011-10-03T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">1034</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.19</witsml:density><witsml:pv uom="mPa.s">13</witsml:pv><witsml:yp uom="Pa">8.5</witsml:yp></witsml:fluid>
19 +
20 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 3795. Opened Middle Pipe Ram (MPR), racked back stand and P/U cement stand, connected cement hose.
21 +Pressure surface lines to 200 bar. Depth: 3795. Circulated 1 1/2 x bottoms up at 3500 lpm - 215 bar.
22 +Meanwhile held TBT with all personnel involved with the cementing operation. Depth: 3795. Lined up with cement unit, closed IBOP and applied 10 bar behind.
23 +Pumped 10 m3 drill water with cement unit.
24 +Mixed and pumped 7 .38 m3 of 1.90 sg cement, rotated the string at 40 rpm - 11 kNm.
25 +Chased with 1.8 m3 freshwater from the cement unit.
26 +Displaced cement using the rig pumps with 29.5 m3 of seawater. Depth: 3600. Removed cement hose and racked back cement stand in the derrick.
27 +Tripped out of hole from 3795 m to 3600 m. Depth: 3600. Inserted sponge ball and and circulated bottoms up at 3500lpm, 205 bar. Rotated string at 50 rpm, 12-13 kNm. Depth: 3600. Held TBT for cement job. Picked up cement stand and made up same.
28 +Lined up with cement unit, closed IBOP and applied 10 bar behind.
29 +Pumped 10 m3 drill water with cement unit.
30 +Mixed and pumped 7 .38 m3 of 1.90 sg cement, rotated the string at 50 rpm, 12-13 kNm.</witsml:extendedReport >
31 +
32 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>R/D and cleared drillfloor of all excess equipment.
33 +Installed hydraulic roughneck (HRN) tracks.
34 +Energised slip joint and filled riser with seawater.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held TBT with all personnel involved in changing out the handling equipment.
35 +Changed out bails and elevators and reset anti-collision system.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U wearbushing RT and installed wearbushing as per FMC procedures.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with wearbushing on 5 1/2&quot; HWDP to 135 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">154.4</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran down with wearbushing, opened crown mounted compensator (CMC), then ran down and landed wearbushing with 5 mT downweight. Performed 5 mT overpull.
36 +WB set at 154.4 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH and L/O wear bushing RT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleared catwalk and loaded Emergency Drillpipe Hang Off Tool (EDPHOT) onto the catwalk.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Function tested BSR using the acoustic system, and both pod lines.
37 +Meanwhile: Mechanic checked air leak on Hi Clutch and changed out dump valve on high clutch..</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on crane to complete a load with supply vessel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reconfigured emergency drill pipe hang off tool (EDPHOT). Configured for use with 5&quot; DP.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5 1/2&quot; handling equipment.
38 +Installed insert packer and P/U VMB packer RT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">145</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with VMB RT down to 145 m. Made up to the DDM and took parameters.
39 +Upweight - 47 mT.
40 +Down weight 49 mT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">160</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Broke circulation with 200 lpm - 3 bar, then increased up to 2000 lpm 60 bar.
41 +Washed down and reduced flow rate to 140 lpm - 2 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">168</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Washed down and engaged VMB packer with 10 mT downweight.
42 +Observed pressure increase up to 30 bar. Stopped the pumps and noted pressure bleed off.
43 +Took 10 mT overpull on the packer and proceeded to release the packer as per the Archer engineers instructions.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with VMB packer from 166 m to surface. L/O VMB packer to the deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Due to the promise of adverse weather, installed casing tong on the drillfloor and secured same.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling equipment to 5&quot;.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U amd M/U cement stand and racked back in the derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling equipment to 3 1/2&quot;</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held TBT with all personnel with involved with M/U the bridge plug.
44 +P/U and and M/U Halliburton EZSV bridge plug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">291</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with bridge plug on 3 1/2&quot; DP to 291 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">291</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5&quot; handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">291</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Change out die block on hydraulic roughneck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2168</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH from 291 m to 2168 m. Filled pipe every 25 stands.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2168</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Filled pipe, then functioned tested the BOP utilising both yellow and blue pods.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3800</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued to RIH from 2168 m to 3800 m filled the pipe every 20 stands.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">3800</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held TBT with all personnel involved with setting and testing the bridge plug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3800</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Took Parameters:
45 +Upweight 138 mT
46 +Downweight 100 mT
47 +Applied 39 turns to the string and waited 2 mins as per Halliburton procedure.
48 +P/U 8 mT over P/U weight and waited 2 mins. P/U to 156 mT (18 mT overpull) and released RT from bridge plug.
49 +P/U clear of the plug 2 m then ran down and tagged plug with 5 mT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3795</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lined up down the choke and kill and confirmed cement unit line up with 20 bar.
50 +Pressure tested bridge plug to 20 bar x 5 mins and 250 bar x 10 bar - pumped 1680 ltrs.</witsml:comments></witsml:activity>
51 +
52 +
53 +
54 +
55 +
56 +<witsml:equipFailureInfo><witsml:dTim>2011-09-30T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>service equ -- wellhead tubular equ</witsml:equipClass><witsml:eTimMissProduction uom="min">270</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-01T14:45:00.000Z</witsml:dTimRepair><witsml:description>High Pressure Cap on E-1 failed to land and lock.</witsml:description></witsml:equipFailureInfo><witsml:equipFailureInfo><witsml:dTim>2011-10-01T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>service equ -- wellhead tubular equ</witsml:equipClass><witsml:eTimMissProduction uom="min">885</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-01T14:15:00.000Z</witsml:dTimRepair><witsml:description>Failed to land and lock FMC High Pressure Cap on E-4</witsml:description></witsml:equipFailureInfo><witsml:equipFailureInfo><witsml:dTim>2011-10-02T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>service equ -- wellhead tubular equ</witsml:equipClass><witsml:eTimMissProduction uom="min">945</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-02T06:30:00.000Z</witsml:dTimRepair><witsml:description>Landed high pressure cap on E-3, however unable to lock high pressure cap to manifold hub.</witsml:description></witsml:equipFailureInfo>
57 +
58 +
59 +
60 +
61 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-F-3 H</witsml:nameWell><witsml:nameWellbore>NO 34/10-F-3 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:04:46.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/10-F-3 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/10-F-3 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4067</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>1998-11-21T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2000-05-21</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>DEEPSEA ATLANTIC</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>404360</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">225</witsml:mdKickoff><witsml:mdStrengthForm uom="m">4155</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2982</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">6027</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3380.6</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">32</witsml:elevKelly><witsml:sum24Hr>Pulled wear bushing - pulled seal assembly - engaged 9 5/8&quot; casing and pulled to surface.</witsml:sum24Hr><witsml:forecast24Hr>Change out drilline - install 13 3/8&quot; wear bushing - log (CBL/ USIT) 13 3/8&quot; casing.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +<witsml:fluid><witsml:type>CACL BRINE</witsml:type><witsml:dTim>2011-10-03T20:00:00.000Z</witsml:dTim><witsml:md uom="m">4155</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.37</witsml:density><witsml:pv uom="mPa.s">-9999</witsml:pv><witsml:yp uom="Pa">-9999</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 916. Rigged to pull 9 5/8&quot; casing.
10 + Depth: 876. Pulled hanger &amp; 3 joints of casing. Racked back in derrick. Re-calibrated drawork height. Depth: 0. Pulled 9 5/8&quot; casing from 876 m to surface. Depth: 0. Rigged down casing running equipment. Next: Change drill line. Depth: 0. Planned maintenance. Prepared to change drilling line. </witsml:extendedReport >
11 +
12 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1057</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran 9 5/8&quot; casing cutting assembly from 140 to 1057 m. Picked up marine swivel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1057</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Filled string/ 12 m3. Made up topdrive.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1083</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Recorded parameters: 103 tons up/ 99 tons down. Set down 5 tons: Free torque % KNm w/ 100 RPM.
13 +Broke circulation and circulated until stable circulation parameters.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1083</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut 9 5/8&quot; casing @ 1080 m. 600 lpm/ 66 Bar - 100 RPM/ 6-12 KNm. Pressure dropped to +-40 Bar @ cut through. Casing was in tension. Cut took 3 minutes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1083</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well. OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">830</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH from 1083 to 830 m. Laid down marine swivel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">830</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Drawork stopped. Recalibrated drawworks. Electronic fault. Second time on trip.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">183</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH from 830 to 183 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- cut</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled cutting assembly from 183 m to surface and laid down.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed prejob meeting prior to wear bushing operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">41</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Made up BHA for w.bshg retrieval.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">163</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH. Washed down w/ 3000 lpm/ 16 bar. Set down 10 tons and released wear bushing w/ 23 tons overpull.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled wear bushing to surface and laid down.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned up rigfloor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Changed encoder on drawork &apos;A&apos;.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">164</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran wash assembly from surface to 134 m. Washed wellhead area 3000 lpm/ 12 Bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">357</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up and ran seal assembly running tool from surface to 357 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">357</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Closed annular - set down 25 tons and released seal assembly w/ 20 tons overpul.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">357</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well. Gained 900 ltrs - then stable well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">190</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled seal assembly from wellhead to surface. Changed handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">190</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Laid down seal assembly w/ running tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled washing string from 190 m to surface.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed prejob meeting prior to retrieving casing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">45</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Made up 9 5/8&quot; spear assembly w/ pack off. Changed handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">169</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran casing spear from 45 to 169 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">169</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Landed with 10 tons downwt. Turned string to left and pulled 9 5/8&quot; casing loose without overpull.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">167</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled back 2 m and started to circulate out volume between casings with closed annular and through choke line.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1080</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Closed in well when quickly reaching 90% gas. Circulated slowly through chokeline and poorboy complete volume. Gas % decreased continously.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1051</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Opened well and circulated until equal mudweight in/ out and low gas (0 - 0.5%)</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1051</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well. OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">916</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled casing to surface. Changed handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">916</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Released spear assembly and racked back in derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">916</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed prejob meeting prior to pulling casing stands.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">916</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged 9 5/8&quot; casing handling equipment.</witsml:comments></witsml:activity>
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/11-A-11</witsml:nameWell><witsml:nameWellbore>NO 34/11-A-11</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:05:05.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/11-A-11</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/11-A-11</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5001</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dateDrillComplete>2004-12-27</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>KVITEBJØRN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280877</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4389</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">2.1</witsml:strengthForm><witsml:mdStrengthForm uom="m">4200</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3989</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4483.2</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">60.5</witsml:elevKelly><witsml:sum24Hr>Received logging equipment from town. Waited for Baker logging personnel to arrive. Baker personnel arrived. Handed well from Prod dept. to D&amp;W. Transferred controll of DHSV and HMV from platform system to local panel. Waited for Prod dept. to close in wells prior to performing critical lift</witsml:sum24Hr><witsml:forecast24Hr>Perform critical lift and rig on well. Prepare Baker logging equipment. MU BHA no 1 with CMI logging tool. RIH with CMI logging tool to TD. Logg with CMI tool according to program.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +<witsml:fluid><witsml:type>Fresh Water</witsml:type><witsml:dTim>2011-10-03T16:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">827</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.05</witsml:density><witsml:pv uom="mPa.s">-9999</witsml:pv><witsml:yp uom="Pa">-9999</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Disconnected KWV end cap and RU kill line to KWV. Meanwhile Production department to close in wells prior to performing critical lift. Depth: 0. Changed hatch cover to WL hatch. Removed X-mas top cap. Performed critical lift and landed wireline stack onto x-mas tree. MU clamp on lower riser. Depth: 0. Function tested BOP Depth: 0. Leak tested with cmt unit against closed Lo-Tq valve outside KVW to 20/ 445 bar for 5/ 10 min Depth: 0. Leak tested against closed KWV to 20/ 445 bar for 5/ 10 min.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Received logging equipment from town. Spotted tool containers and logging cabin on pipedeck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Baker logging personnel to arrive. Meanwhile held A-standard training with topic leak testing and prepared equipment for 5/16&quot; mono cable operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Baker logging personnel to arrive. Meanwhile prepared WL equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Baker personnel arrived. New arrived Baker personnel on platform introduction brief.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting with involved personnel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Handed well from Prod dept. to D&amp;W. Transferred controll of DHSV and HMV from platform system to local panel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Preformed SJA and DOP meeting prior critical lifting operations (RU WL riser incl WL BOP).</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Production department to close in wells prior to performing critical lift.</witsml:comments></witsml:activity>
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/4-C-8 H</witsml:nameWell><witsml:nameWellbore>NO 34/4-C-8 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:01:15.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/4-C-8 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/4-C-8 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6546</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2005-06-02T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2011-07-05</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>SNORRE B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280485</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:tvd uom="m">0</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4427.6</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.69</witsml:strengthForm><witsml:mdStrengthForm uom="m">3944</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2472</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4641.7</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2637</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">37</witsml:elevKelly><witsml:sum24Hr>Waited for 60 hrs weather window to run completion string to production packer.</witsml:sum24Hr><witsml:forecast24Hr>Wait for weather window to run completion string to production packer.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +<witsml:fluid><witsml:type>Cs/KFormate </witsml:type><witsml:dTim>2011-10-03T15:00:00.000Z</witsml:dTim><witsml:md uom="m">4645</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.63</witsml:density><witsml:pv uom="mPa.s">26</witsml:pv><witsml:yp uom="Pa">14</witsml:yp></witsml:fluid>
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited for 60 hrs weather window to run completion string to production packer.
10 +Max heave observed 6,8 m.
11 +Meanwhile performed general maintenance on drilling equipment.</witsml:extendedReport >
12 +
13 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for 60 hrs weather window to be able to RIH with comletion string to prod.packer.
14 +Meanwhile performed general maintenance on drilling equipment. Broke down drill pipe stand. Washed and greased threads, racked back same.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for 60 hrs weather window to be able to RIH with comletion string to prod.packer.
15 +Meanwhile performed general maintenance on drilling equipment.</witsml:comments></witsml:activity>
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +
25 +
26 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/7-C-2 AH</witsml:nameWell><witsml:nameWellbore>NO 34/7-C-2 AHT4</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:01:43.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/7-C-2 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/7-C-2 AHT4</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4341</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2001-09-21T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Island Offshore Management</witsml:drillContractor><witsml:rigAlias><witsml:name>ISLAND FRONTIER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>373829</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4660</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">3177</witsml:mdKickoff><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4629</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">2</witsml:elevKelly><witsml:sum24Hr>None</witsml:sum24Hr><witsml:forecast24Hr>None</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Lifted onboard Vetco connector. Connected stack to connector. Performed between well check on stack.
10 +Took onboard: AWS plug container.
11 +Back loaded: TCRT, Pariser wheel., 3 ea pop-off valve to be re-set, 2 ea HW 443 tand, 1 CPI work container, 1 ea 6m guide post.</witsml:extendedReport >
12 +
13 +
14 +
15 +
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/7-P-7</witsml:nameWell><witsml:nameWellbore>NO 34/7-P-7</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:02:11.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/7-P-7</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/7-P-7</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>1720</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>1991-07-14T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>BJ Services</witsml:drillContractor><witsml:rigAlias><witsml:name>SNORRE A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>272085</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">368.4</witsml:mdKickoff><witsml:strengthForm uom="g/cm3">0</witsml:strengthForm><witsml:mdStrengthForm uom="m">0</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4779.6</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">59.4</witsml:elevKelly><witsml:sum24Hr>Started to spot and prepare CT equipment prior to rig up. WOW.</witsml:sum24Hr><witsml:forecast24Hr>Continue to spot and prepare CT equipment prior to rig up.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
6 +
7 +
8 +
9 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. WOW.</witsml:extendedReport >
10 +
11 +<witsml:activity><witsml:dTimStart>2011-10-03T02:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>All coiled tubing equipment onboard. Prepared rig crane prior to lifting CT reels.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Repositioned CT reels. Lifted track and trolly to pipe deck and spotted same in position against well. Lifted power pack to pipe deck. Positioned turn table onto track and trolly. Positioned reel foundation onto turn table.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Crane dep. busy with other crane operations. Meanwhile unpacked CT equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Looked for and found beams to put under the tool container. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Activated work permit for working on pipe deck. Prepared rig up plan. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:05:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited due to crane lifting in pipe deck area.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:05:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on electrician due to busy with other work.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Hooked up CT power pack to platform fire &amp; gas system. Function tested CT power pack.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lifted 3 ea. beams for tool container up to pipe deck. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on crane dep.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held tool box talk. Lifted CT reel into foundation and removed the bridle.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW. To strong wind for crane operation.
12 +Meanwhile started to disconnect power pack prior to replacing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:50:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Crane available. Repositioned CT reel cradle and foundation bridle. Lifted and positioned tool container onto beams.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:50:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW.
13 +Meanwhile:
14 +Disconnected and prepared power pack prior to repositioning, due to drilling dep. needed more space on pipe deck.
15 +Storm secured all CT equipment.
16 +Held startup meeting for night shift crew.</witsml:comments></witsml:activity>
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +
25 +
26 +
27 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/8-V-4 H</witsml:nameWell><witsml:nameWellbore>NO 34/8-V-4 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:02:35.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>34/8-V-4 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>34/8-V-4 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6665</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Diamond Offshore Netherlands BV</witsml:drillContractor><witsml:rigAlias><witsml:name>OCEAN VANGUARD</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>287902</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">1260</witsml:md><witsml:tvd uom="m">1260</witsml:tvd><witsml:diaHole uom="in">26</witsml:diaHole><witsml:mdDiaHoleStart uom="m">421</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">0</witsml:strengthForm><witsml:mdStrengthForm uom="m">0</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">30</witsml:diaCsgLast><witsml:mdCsgLast uom="m">413.8</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">413.8</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">61</witsml:distDrill><witsml:elevKelly uom="m">22</witsml:elevKelly><witsml:sum24Hr>Drilled from 1199 m to 1260 m. Circulated 3 x BU. FC well. Experienced problems transfering mud from boat, continued circulation on hole with seawater. Displaced well to 1.50 sg KCL / Polymer WBM. Pulled out, experienced tight hole and 20 - 30 ton OP in several intervals while POOH. Circ. with SW at 656 m. Backreamed from 656 m up to 630 m. Pulled 26&quot; BHA above template. Moved rig to safe zone. POOH. Racked 26&quot; BHA, downloaded MWD data.</witsml:sum24Hr><witsml:forecast24Hr>Wait on weather to run 20&quot; casing ( estimated +/- 24 hours or 4 days).
6 +
7 +Target for tomorrow 06:00: Waiting on weather to run 20&quot; casing.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +<witsml:bitRecord><witsml:numBit>2</witsml:numBit><witsml:diaBit uom="in">26</witsml:diaBit><witsml:manufacturer>Security DBS</witsml:manufacturer><witsml:codeMfg>EBXT1GSC</witsml:codeMfg></witsml:bitRecord>
9 +<witsml:fluid><witsml:type>Spud Mud</witsml:type><witsml:dTim>2011-10-03T23:58:00.000Z</witsml:dTim><witsml:md uom="m">1260</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.03</witsml:density><witsml:pv uom="mPa.s">21</witsml:pv><witsml:yp uom="Pa">31</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>KCl/Polymer</witsml:type><witsml:dTim>2011-10-03T23:59:00.000Z</witsml:dTim><witsml:md uom="m">1260</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.5</witsml:density><witsml:pv uom="mPa.s">29</witsml:pv><witsml:yp uom="Pa">17.5</witsml:yp></witsml:fluid>
10 +
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited on weather to perform wipertrip / run 20&quot; casing.
12 +
13 +Time Wind Wind Sign Max Swell Sea Pitch Roll Heave
14 + Speed Direction Height Height Height Direction
15 +00:00 47 226 7.3 10.0 2.2 226 1.5 2.2 4.5
16 +02:00 43 234 8.3 12.4 3.0 230 2.6 2.3 5.5
17 +04:00 42 235 7.5 11.3 3.6 235 2.3 2.3 4.5
18 +06:00 43 234 6.5 9.9 3.4 234 1.9 2.1 4.4
19 +
20 +Meanwhile :
21 +Changed discharge module on mud pump # 2. Continued working on BOP and carried out PM&apos;s and rig maintenance and cleaning.</witsml:extendedReport >
22 +
23 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:20:00.000Z</witsml:dTimEnd><witsml:md uom="m">1260</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 26&quot; hole from 1199 m to 1260 m with 3890 - 4240 lpm / 142 - 187 bar, 110 rpm / 4 - 10 kNm torque and 6 - 13 ton WOB. Gross ROP : 11.4 m/h. ECD : 1.06- 1.07 sg. Pumped sweeps in the middle of stand. Spotted 10 m3 1.50 sg KCL / Polymer pill around BHA before connections. Drilled with lower weight on bit as inclination started to creep up to 1.3 degrees. Experienced problems with mud pump no. 3, pumps jacking, hence isolated pump at 04:30 hours and started working on pump. Verified depth with paintmarks on drillstring. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:20:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1260</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped 25 m3 hi-visc sweep. Commenced circulating hole clean with 3890 lpm / 160 bar, 120 rpm, / 3 -4 kNm torque. ECD : 1.68 sg.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1260</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued circulating BU with seawater with 3890 - 4230 lpm / 160 - 187 bar, 120 rpm / 2 - 4 kNm torque, while reciprocating string. Circulated a total of 3 x BU ( pumped 25 m3 hi-visc pill prior to commencing first and second BU circulation.). Took Siddis Skipper in to take onboard mud for displacement at 08:35 hours. House connected at 08:45 hours. Experienced problems with delivery of mud from boat to rig at 10:00 hours..</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1260</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Trouble shot and continued transfering mud for displacement, from boat to rig. Meanwhile circulated with 4230 lpm / 185 bar, 70 rpm / 2 - 3 kNm torque. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">1260</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- pressure detection</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well for 10 minutes. Static. Approximately 30 m3 of mud was left on boat due to transfere issues, plugging of lines.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1260</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Displaced well from seawater to 1.50 sg mud with 3900 - 4200 lpm / 171 - 183 bar, 103 rpm / 2 -3 kNm torque. ECD : 1.07 - 1.22 sg. ( Theoretical bottom hole pressure after displacement 169 bar. BHP based on actual measured ECD 151 bar, excluding annulus friction)</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">688</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with 26&quot; drilling assembly from 1260 m - 688 m on 5 1/2&quot; DP. Worked through tight spot in interval 1214 m - 1209 m with up to 30 ton overpull, rotated string and pulled up.
24 +Tight spot intervals :
25 +1078 - 1075 m, 25 ton overpull
26 +995 - 993 m, 25 ton overpull
27 +781 - 688 m, 20 ton overpull</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">656</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled from 688 m - 656 m on 5 1/2&quot; DP.
28 +Worked through tight spot in interval 688 - 677 m, 20 ton overpull.
29 +Circulated with seawater with 2200 lpm / 45 bar. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:50:00.000Z</witsml:dTimEnd><witsml:md uom="m">630</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Backreamed from 656 m to 630 m with 3500 lpm / 115 bar, 60 rpm / 2 - 5 kNm torque.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:50:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">390</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with 26&quot; drilling BHA from 630 m in to 30&quot; conductor shoe at 414 m and up to 390 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">299</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out from 390 m to 299 m on 5 1/2&quot; DP, i.e. pulled out of wellhead housing at 311.5 m and above template at 304 m. Double secured drill string.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">299</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- position</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Moved rig to safe zone.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:05:00.000Z</witsml:dTimEnd><witsml:md uom="m">225</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out from 299 m to 225 m on 5 1/2&quot; DP. Observed with ROV that bottom stabilizer was plugged and upper stabilizer partially plugged.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:05:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with 26&quot; BHA from 225 m to surface. Broke out 25 3/4&quot; stabilizer. Made up 2 crossovers to pupjoint for spaceout for racking of MWD stand. Downloaded MWD tool. Inspected and gauged bit. Racked MWD stand. </witsml:comments></witsml:activity>
30 +
31 +
32 +
33 +
34 +
35 +
36 +
37 +
38 +
39 +
40 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 35/8-Q-14 H</witsml:nameWell><witsml:nameWellbore>NO 35/8-Q-14 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:05:25.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>35/8-Q-14 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>35/8-Q-14 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6435</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2010-08-14T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Dolphin</witsml:drillContractor><witsml:rigAlias><witsml:name>BIDEFORD DOLPHIN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>290170</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4751</witsml:md><witsml:tvd uom="m">3649</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:strengthForm uom="g/cm3">1.95</witsml:strengthForm><witsml:mdStrengthForm uom="m">3654.5</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3547.5</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4720</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3649</witsml:tvdCsgLast><witsml:presTestType>leak off test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">31</witsml:elevKelly><witsml:sum24Hr>Waited on weather. Not sufficient weather window for cleaning up well.</witsml:sum24Hr><witsml:forecast24Hr>Wait on weather.
6 +When weather permits : pull deep set BTU plug.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
7 +
8 +
9 +
10 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited on weather.</witsml:extendedReport >
11 +
12 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on weather. Not sufficient weather window for cleaning up well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on weather. Not sufficient weather window for cleaning up well.
13 +
14 +Simultaneously prepared for disconnecting EDP:
15 +Bled off pressure in well from 80 bar to zero. Closed all valves in XT and LRP (except GSR). Disconnected all 3 electrical jumpers between EDP and LRP and parked on EDP. Bled off LP and HP pressure to XT. Disconnected hydraulic jumper from LRP and parked on LRP. Disconnected grease injection head hoses.</witsml:comments></witsml:activity>
16 +
17 +
18 +
19 +
20 +
21 +
22 +
23 +
24 +
25 +
26 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 35/9-C-1 AY2H</witsml:nameWell><witsml:nameWellbore>NO 35/9-C-1 AY2H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:05:48.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>35/9-C-1 AY2H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>35/9-C-1 AY2H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6651 </witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2011-09-03T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Transocean</witsml:drillContractor><witsml:rigAlias><witsml:name>TRANSOCEAN SEARCHER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>296245</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">6075</witsml:md><witsml:tvd uom="m">2335.1</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">6075</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.45</witsml:strengthForm><witsml:mdStrengthForm uom="m">2927</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2336.8</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">6.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4649.8</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2336</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">22</witsml:elevKelly><witsml:sum24Hr>POOH from 2861 m to 2785 m while pumping with 1800 lpm. Circulated B/U. Flowchecked well. POOH. M/U and R/B stand with MWD tool. R/U casing handling equipment. P/U and M/U seal stinger and 7&quot; space-out joints. R/B seal stinger and space-out joints in derrick. WOW.</witsml:sum24Hr><witsml:forecast24Hr>WOW.
6 +
7 +Operational status tomorrow at 06:00: Running deflector.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +
9 +<witsml:fluid><witsml:type>XP-07 - #14</witsml:type><witsml:dTim>2011-10-03T11:00:00.000Z</witsml:dTim><witsml:md uom="m">6085</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.1</witsml:density><witsml:pv uom="mPa.s">16</witsml:pv><witsml:yp uom="Pa">6</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>LSOBM</witsml:type><witsml:dTim>2011-10-03T20:00:00.000Z</witsml:dTim><witsml:md uom="m">6075</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.1</witsml:density><witsml:pv uom="mPa.s">10</witsml:pv><witsml:yp uom="Pa">7.5</witsml:yp></witsml:fluid>
10 +
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. WOW. Max heave: 4.2 m. Increasing trend.
12 +
13 +- L/D remaining 12 stands of 5 1/2&quot; HWDP (FH) and 10 stands of 5&quot; DP to deck.
14 +- Experienced some problems with leaking seal on valve block.</witsml:extendedReport >
15 +
16 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2785</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established flow rate in 200 lpm steps to 1000 lpm/27 bar. Ensured stable trends before proceeding to next step. Activated compensator.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2861</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH slowly from 2785 m to 2861 m while pumping with 1000 lpm/29-32 bar. (10 m above top PBR at 2871.5 m.) Observed nothing going through contingency latch, 2806.7 m, and primary latch, 2834 m, with Junk muncher.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2861</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Increased flow rate in 200 lpm steps to 1820 lpm/69 bar. Max gas: 5.6%. Ensured stable trends before proceeding to next step. Started boosting riser using MP#3.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2785</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH while pumping with 1820 lpm/62-64 bar. Boosted riser with 600 lpm while POOH. Boosted with reduced rate due to avoid mud overflow.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2785</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Circulated B/U with 1820 lpm/59 bar and 60 rpm/12-13 kNm. Reciprocated string between 2782 m and 2751 m. Max gas: 3.1%. Boosted riser with 600 lpm. Reduced flow rate on well to 1000 lpm and increased boosting to 1000 lpm to reduce risk of balloning when return from B/U were in the riser.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2778</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well for 10 minutes; well stable last 10 minutes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2778</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped slug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2354</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH from 2778 m to 2354 m. Pulling speed: 2-4 minutes/stand. Pulled first 11 stands with restricted pulling speed to make sure hole taking correct volume.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">416</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH from 2354 m to 416 m. Pulling speed: 1.5-2 minutes/stand.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">416</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well for 10 minutes prior to pulling BHa through BOP; well stable.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">39</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH from 416 m to 39 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned and L/D magnets, junk muncher and float sub to deck. Recovered swarf on magnets and cement rubber seals from whipstock.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned and cleared drill floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U stand with MWD tool, 2 ea 5&quot; DP singles and 5 1/2&quot; DP pup joint. Function tested MWD with 1030 lpm/38 bar. R/B in derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>R/U casing handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed inspection of topdrive and derrick. Found loose bolt on securing plate between topdrive and travelling block and several loose bolts on oil line on topdrive gear. Fastened and secured bolts.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">38</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U seal stinger and 3 x 7&quot; tubing space-out joints/ pup joints. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>B/O 7&quot; space-out pup joint. R/B seal stinger and 2 x 7&quot; space out joints in derrick. Weather forecast suggesting too high heave for deflector to setting of deflector.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW.
17 +
18 +- Re-arranged deck to make space for DP singles from drill floor.
19 +- Performed general maintenance on drill floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW. Max heave: 1.8 m on increasing trend.
20 +
21 +- L/D 6 stands of 5 1/2&quot; HWDP (HT-55) and 6 stands of 5 1/2&quot; HWDP (FH)
22 +- Experienced som problems with the Hydralift. (Leaking valve block) </witsml:comments></witsml:activity>
23 +
24 +
25 +
26 +
27 +
28 +<witsml:equipFailureInfo><witsml:dTim>2011-09-29T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2747</witsml:md><witsml:equipClass>hoisting equ -- top drive</witsml:equipClass><witsml:eTimMissProduction uom="min">45</witsml:eTimMissProduction><witsml:dTimRepair>2011-09-28T15:15:00.000Z</witsml:dTimRepair><witsml:description>Changed out hose on topdrive link cylinder.</witsml:description></witsml:equipFailureInfo>
29 +
30 +
31 +
32 +
33 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6406/3-D-1 AY1H</witsml:nameWell><witsml:nameWellbore>NO 6406/3-D-1 AY1H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:06:21.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>6406/3-D-1 AY1H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>6406/3-D-1 AY1H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6646</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Transocean</witsml:drillContractor><witsml:rigAlias><witsml:name>TRANSOCEAN ARCTIC</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>294382</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4732</witsml:md><witsml:tvd uom="m">3694</witsml:tvd><witsml:diaHole uom="in">8.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4050</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.77</witsml:strengthForm><witsml:mdStrengthForm uom="m">4100</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3689</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4093.11</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3688.5</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">174</witsml:distDrill><witsml:elevKelly uom="m">24</witsml:elevKelly><witsml:sum24Hr>Drilled 8 ½&quot; hole from 4558 m ot 4732 m.</witsml:sum24Hr><witsml:forecast24Hr>Drill 8 ½&quot; hole.
6 +
7 +Operational target tomorrow at 06:00: Drilling at 4950 mMD.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +<witsml:bitRecord><witsml:numBit>10</witsml:numBit><witsml:diaBit uom="in">8.5</witsml:diaBit><witsml:manufacturer>Reed-Hycalog</witsml:manufacturer><witsml:codeMfg>RSH616D-F4</witsml:codeMfg></witsml:bitRecord>
9 +<witsml:fluid><witsml:type>OBM-Low ECD</witsml:type><witsml:dTim>2011-10-03T03:40:00.000Z</witsml:dTim><witsml:md uom="m">4595</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.15</witsml:density><witsml:pv uom="mPa.s">19</witsml:pv><witsml:yp uom="Pa">7</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>OBM-Low ECD</witsml:type><witsml:dTim>2011-10-03T10:15:00.000Z</witsml:dTim><witsml:md uom="m">4660</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.15</witsml:density><witsml:pv uom="mPa.s">20</witsml:pv><witsml:yp uom="Pa">8</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>OBM-Low ECD</witsml:type><witsml:dTim>2011-10-03T15:30:00.000Z</witsml:dTim><witsml:md uom="m">4686</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.15</witsml:density><witsml:pv uom="mPa.s">20</witsml:pv><witsml:yp uom="Pa">6.5</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>OBM-Low ECD</witsml:type><witsml:dTim>2011-10-03T22:00:00.000Z</witsml:dTim><witsml:md uom="m">4725</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.15</witsml:density><witsml:pv uom="mPa.s">20</witsml:pv><witsml:yp uom="Pa">7.5</witsml:yp></witsml:fluid>
10 +<witsml:porePressure><witsml:readingKind>estimated</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">.99</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4731</witsml:md></witsml:porePressure>
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 4746. Drilled 8 ½&quot; hole from 4732 m to 4746 m. Gross ROP 5.6 m/hr/ 12-16 MT,2250 lpm/255-260 bar,30 rpm/22-26 kNm, ECD 1.31-1.33 SG, Max gas 0.97%.
12 +- Challenging building angle, got deflected down. Set 100% build to break through, got high bending angle on CoPilot @ 4746 m when landing out at 90° inclination.
13 +- Downlinked off bottom w/ string compensated; 2 ea.
14 +- Maintained differential pressure of 40 bar. Depth: 4748. Reamed interval from 4740 m to 4748 m due to high bending (local DLS) on CoPilot. Continued drilling, saw bending moment increase further as bit being deflected upwards. Reamed same interval, set ATK to drop slighly to counteract deflection, drilled to 4748 m and saw bending moment started levelling off. Depth: 4764. Drilled 8 ½&quot; hole from 4748 m to 4764 m. Gross ROP 6.4 m/hr/ 12-16 MT,2250 lpm/255-260 bar,30 rpm/22-26 kNm, ECD 1.31-1.34 SG, Max gas 0.84%.
15 +- Bending moment normalised, but still tendencies of being deflected.
16 +- Loosing mud over shakers due to rig movement, trimmed rig towards STB.
17 +- Survey taken w/ string compensated.
18 +- Maintained differential pressure of 40 bar. </witsml:extendedReport >
19 +<witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4563.9</witsml:md><witsml:tvd uom="m">3691.17</witsml:tvd><witsml:incl uom="dega">89.96</witsml:incl><witsml:azi uom="dega">357.15</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4592.5</witsml:md><witsml:tvd uom="m">3691.31</witsml:tvd><witsml:incl uom="dega">89.48</witsml:incl><witsml:azi uom="dega">356.75</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4622.1</witsml:md><witsml:tvd uom="m">3691.46</witsml:tvd><witsml:incl uom="dega">89.94</witsml:incl><witsml:azi uom="dega">356.38</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4651.2</witsml:md><witsml:tvd uom="m">3691.49</witsml:tvd><witsml:incl uom="dega">89.94</witsml:incl><witsml:azi uom="dega">356.41</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4679.8</witsml:md><witsml:tvd uom="m">3691.92</witsml:tvd><witsml:incl uom="dega">88.34</witsml:incl><witsml:azi uom="dega">354.54</witsml:azi></witsml:surveyStation><witsml:surveyStation><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4709.4</witsml:md><witsml:tvd uom="m">3693.01</witsml:tvd><witsml:incl uom="dega">87.45</witsml:incl><witsml:azi uom="dega">355.14</witsml:azi></witsml:surveyStation>
20 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">4619</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 ½&quot; hole from 4558 m to 4619 m. Gross ROP 10 m/hr/ 8-12 MT,2150 lpm/230-240 bar,30 rpm/20-25 kNm, ECD 1.30-131 SG, Max gas 3.2%.
21 +- Downlinked off bottom; 3 ea.
22 +- Maintained differential pressure of 37-40 bar.
23 +- @ 4608 m - Changed to 170# screens on two shakers due to some overflow.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">4667</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 ½&quot; hole from 4619 m to 4667 m. Gross ROP 8.7 m/hr/ 8-11 MT,2100-2300 lpm/235-250 bar,30-50 rpm/21-25 kNm, ECD 1.30-133 SG, Max gas 2.5%.
24 +- Geosteered towards 3694 mTVD from 4659 m.
25 +- Downlinked off bottom; 3 ea, whereof all had to be repeated.
26 +- Maintained differential pressure of 37-40 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">4667</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- ream</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reamed interval from 4662 m to 4667 m due to high bending (local DLS) on CoPilot. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">4698</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 ½&quot; hole from 4667 m to 4698 m. Gross ROP 5,6 m/hr/ 8-12 MT,2300 lpm/235-250 bar,30-50 rpm/21-25 kNm, ECD 1.30-133 SG, Max gas 2.5%.
27 +- Stringer from 4686 m to 4692 m; 2-4 m/hr.
28 +- Downlinked off bottom; 5 ea, whereof 2 had to be repeated.
29 +- Maintained differential pressure of 37-40 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">4727</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 ½&quot; hole from 4698 m to 4727 m. Gross ROP 6,4 m/hr/ 8-12 MT,2250 lpm/245-255 bar,30 rpm/22-26 kNm, ECD 1.32-134 SG, Max gas 1.8%.
30 +- Downlinked off bottom; 3 ea, whereof 1 had to be repeated.
31 +- Maintained differential pressure of 37-40 bar.
32 +- Operation stopped due to problems downlinking. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">4727</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot on downlinking problems. Altered flow, stopped programming/checking tools for next run. Succsessful downlink on 6th attempt with string compensated.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">4732</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Drilled 8 ½&quot; hole from 4627 m to 4732 m. Gross ROP 10 m/hr/ 10-14 MT,2250 lpm/255-260 bar,30 rpm/22-26 kNm, ECD 1.33 SG, Max gas 1.3%.</witsml:comments></witsml:activity>
33 +
34 +
35 +
36 +
37 +<witsml:lithShowInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:mdTop uom="m">4558</witsml:mdTop><witsml:mdBottom uom="m">4731</witsml:mdBottom><witsml:tvdTop uom="m">3691</witsml:tvdTop><witsml:tvdBottom uom="m">3693</witsml:tvdBottom><witsml:lithology>Sandstone</witsml:lithology></witsml:lithShowInfo>
38 +
39 +
40 +
41 +
42 +
43 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6506/12-P-1 BH</witsml:nameWell><witsml:nameWellbore>NO 6506/12-P-1 BH</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:06:58.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>6506/12-P-1 BH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>6506/12-P-1 BH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6644</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimPreSpud>2011-09-21T21:00:00.000Z</witsml:dTimPreSpud><witsml:dateDrillComplete>2011-09-21</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>DEEPSEA BERGEN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>287983</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">6798.6</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4440</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.6</witsml:strengthForm><witsml:mdStrengthForm uom="m">4376</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3909.5</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">6746.6</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">23</witsml:elevKelly><witsml:sum24Hr>Laid down weak link bails to deck. Performed maintenance on BOP.</witsml:sum24Hr><witsml:forecast24Hr>Maintenance on BOP. WOW for running BOP.
6 +
7 +Operational target tomorrow at 06:00; WOW for running BOP.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +
9 +<witsml:fluid><witsml:type>Packer fluid</witsml:type><witsml:dTim>2011-10-03T23:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.11</witsml:density><witsml:pv uom="mPa.s">-9999</witsml:pv><witsml:yp uom="Pa">-9999</witsml:yp></witsml:fluid>
10 +<witsml:porePressure><witsml:readingKind>measured</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">1.06</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4376</witsml:md></witsml:porePressure>
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Performed maintenance on BOP. Changed UAP element.
12 +
13 +Meanwhile: Changed out chicksan piping on rig floor. Installed pipe handler on top drive.</witsml:extendedReport >
14 +
15 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged down weak link bail system from rig floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed maintenance on BOP. Changed to 9 5/8&quot; LPR.
16 +
17 +Meanwhile: Disconnected pipe handler, upper and lower IBOP and saver sub from top drive for NDT testing. Checked main shaft and solid body elevator. Checked fluid level on ruckers.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed maintenance on BOP. Pressure tested BOP on stump to 20/485 bar for 5/10 min. Found UAP leaking. Changed UAP element.
18 +
19 +Meanwhile: Continued NDT of top drive components. Installed new upper and lower IBOP valves on top drive. Repaired hydraulic hoses on pipe handler. Changed out chicksan piping on rig floor. Greased kill and choke manifold. Checked fluid level on ruckers. Checked marine riser dogs.</witsml:comments></witsml:activity>
20 +
21 +
22 +
23 +
24 +
25 +
26 +
27 +
28 +
29 +
30 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6507/7-A-3</witsml:nameWell><witsml:nameWellbore>NO 6507/7-A-3 T2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:07:25.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>6507/7-A-3</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>6507/7-A-3 T2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6616</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>HEIDRUN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>272421</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4697</witsml:md><witsml:tvd uom="m">2230</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4697</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.62</witsml:strengthForm><witsml:mdStrengthForm uom="m">3523</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1697.7</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4688.7</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2225</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">74.2</witsml:elevKelly><witsml:sum24Hr>V&amp;M finished commissioning of tensioner cylinders for production riser. P/U and ran production riser from 117 m to 412 m. Landed and performed 80 MT overpull test. Filled riser with sea water and pressure tested riser to 345 bar. Installed tension cylinders and transferred weigth to tensioner cylinders. Cut production riser. POOH with production riser running tool string. Installed hatch on skid deck. Furmanite machined down top of production riser (prepared for surface wellhead).</witsml:sum24Hr><witsml:forecast24Hr>Pressure test wellhead. Install surface wellhead wear bushing. Install WOR, BOP and LPR. Pull GTV plug. M/U 8 1/2&quot; BHA. RIH to top of cement while P/U 5&quot; DP.
6 +
7 +Operational target tomorrow at 06:00: RIH with 8 1/2&quot; BHA at 850 mMD, while P/U 5&quot; DP.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +
9 +<witsml:fluid><witsml:type>Performadril</witsml:type><witsml:dTim>2011-10-03T03:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.4</witsml:density><witsml:pv uom="mPa.s">25</witsml:pv><witsml:yp uom="Pa">13.5</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>Performadril</witsml:type><witsml:dTim>2011-10-03T11:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.4</witsml:density><witsml:pv uom="mPa.s">26</witsml:pv><witsml:yp uom="Pa">13.5</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>Performadril</witsml:type><witsml:dTim>2011-10-03T22:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.4</witsml:density><witsml:pv uom="mPa.s">25</witsml:pv><witsml:yp uom="Pa">14</witsml:yp></witsml:fluid>
10 +
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Furmanite finished machining down top of production riser (prepared for SWH). Rigged down Furmanite equipment.
12 +
13 +Meanwhile:
14 + - Finished L/D 35 stands 5 7/8&quot; DP from derrick. Trained ass.driller and new roughneck on last 5 stands. Depth: 0. Installed surface wellhead. Verified orientation with production dept. Installed camforging tool. Camforged top of production riser to surface wellhead.
15 +
16 +Meanwhile:
17 + - Held pre job meeting.
18 + - Started cut &amp; slip drill line.</witsml:extendedReport >
19 +
20 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">117</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>V&amp;M finished commissioning of tensioner cylinders for production riser. Pressure tested lines to cabinet. Experienced leakage, installed new line. Tested same, still leakage. Repaired and tested ok. Checked/inspected V&amp;M workplace prior to continue running riser.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">153</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U and ran production riser from 117 m to 153 m. Trained ass.driller on first 3 joints.
21 +Meanwhile: Continued testing standpipe.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">153</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pit stop. Discussed how to optimize running speed.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">316</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U and ran production riser from 153 m to 316 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">346</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up 3 m pup joint and installed lifting sub. P/U lower splash zone joint. Installed jaws in casing tong. Removed slips, changed to #1 bushings. M/U and RIH with lower and upper splash zone joints. P/U 1 standard joint.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:20:00.000Z</witsml:dTimEnd><witsml:md uom="m">346</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed jaws in casing tong. Changed casing slips and inner bushings. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:20:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U and RIH with 2 standard production riser joints. P/U tension spool piece (TSP) and installed on riser joint.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">381</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed master bushings. RIH with TSP. Installed master and #3 inner bushings. Installed 6 5/8&quot; slips. Held handover. Changed handling equipment, inserts in BX-elevator and casing tong.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">412</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U xo, pup joint and 1 stand 5 7/8&quot; HWDP for landing string. Installed valve on production riser running tool. RIH and landed production riser. Set down 15 MT. Recorded up/down weights prior to landing: 94 MT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">412</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed 80 MT overpull test on connector (174 MT on weight indicator). Reduced overpull to 30 MT. Filled riser with sea water and tested riser to 20 bar/5 min, 345 bar/15 min.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">412</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Built scaffolding on main deck for installing tension cylinders on production riser. Installed graiting on tree deck. Installed tension cylinders on production riser and transferred weigth to tensioner cylinders.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">31</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut production riser. Kept 1-2 MT overpull on string during cutting operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with production riser running tool string. Installed hatch on skid deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Furmanite machined down top of production riser (prepared for SWH).
22 +
23 +Meanwhile:
24 + - L/D production riser running tool, pup and xo.
25 + - Finished testing standpipe manifold and DDM valves to 20 bar/5 min, 345 bar/10 min.
26 + - Rigged down pressure testing equipment on DDM.
27 + - Dressed pipe shuttle to drill pipe.
28 + - Held pre job meeting.
29 + - Picked up mousehole and installed in rotary.
30 + - Started L/D 45 stands 5 7/8&quot; DP from derrick.</witsml:comments></witsml:activity>
31 +
32 +
33 +
34 +
35 +
36 +
37 +
38 +
39 +
40 +
41 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6608/10-C-4 AH</witsml:nameWell><witsml:nameWellbore>NO 6608/10-C-4 AH</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:07:51.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>6608/10-C-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>6608/10-C-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4826</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2003-11-15T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2003-12-10</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Island Offshore Management</witsml:drillContractor><witsml:rigAlias><witsml:name>ISLAND WELLSERVER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>404470</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3617</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2901</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">3</witsml:elevKelly><witsml:sum24Hr>Performed RST log. Not able to get signals from RST tool after two passes. Decided to log caliper. Logged OOH with caliper. Lost signals from caliper at 1000 m MD. POOH. L/D BHA#2. Disconnected UTH. WOW, meanwhile in transit to Sandnessjøen.</witsml:sum24Hr><witsml:forecast24Hr>WOW, meanwhile in transit to Sandnessjøen. WOW.
6 +
7 +Status at 06:00: WOW at quay in Sandnessjøen.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +
9 +
10 +
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. WOW.
12 +
13 +Meanwhile: Transit to Sandnessjøen.</witsml:extendedReport >
14 +
15 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">3455</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed RST-D in IC mode from 3418-3375 m MD at 0.5 m/min. Repeated logging pass. After second logging pass not able to get signals from RST tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3455</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubelshot RST tool. Not able to get signals. Decided to continue with caliper logging.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">3455</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed caliper logging from 3455 m to 3415 m MD with 4.5 m/min. RIH to 3455 m MD. Performed caliper logging from 3455 m to 1021 m 10 m/min. WHP 118 bar. Annulus pressure 30 bar. Lost communication with caliper.
16 +
17 +Meanwhile: Norne pressured up annulus pressure on D-1 to 60 bar. Performed survey with ROV on D-1. No visual leaks observed.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1000</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot signals from BHA while POOH. Pulled BHA into toolcatcher.
18 +
19 +Meanwhile: Closed MV#42(230 Nm, 23 turn)</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Closed UPIV and LPIV. Flushed stack with 800 ltr MEG. Inflow tested LPIV 70 bar/10 min. Inflow tested UPIV 345 bar/10 min.
20 +
21 +Meanwhile: Established GW 2 and 4. Deployed PCH RT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Retrieved PCH and BHA to surface. Inspected and L/D BHA.
22 +
23 +Meanwhile: Closed AMV, AP 50 bar. Closed DHSV. Connected Norne to SEM A.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Prepared to disconnect UTH. Disconnected UTH and retrieved same to surface.
24 +
25 +Meanwhile: Seafastened equipment on deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW, meanwhile in transit to Sandnessjøen, ETA 08:00</witsml:comments></witsml:activity>
26 +
27 +
28 +
29 +
30 +
31 +
32 +
33 +
34 +
35 +
36 +</witsml:drillReport></witsml:drillReports>
...\ No newline at end of file ...\ No newline at end of file
1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6608/10-H-4 AH</witsml:nameWell><witsml:nameWellbore>NO 6608/10-H-4 AH</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:08:19.000Z</witsml:createDate>
2 +<witsml:wellAlias><witsml:name>6608/10-H-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
3 +<witsml:wellboreAlias><witsml:name>6608/10-H-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6626</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
4 +<witsml:wellboreInfo><witsml:dTimSpud>2011-06-29T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Drilling Operations AS</witsml:drillContractor><witsml:rigAlias><witsml:name>AKER SPITSBERGEN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>404201</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
5 +<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2174</witsml:md><witsml:tvd uom="m">2078</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2231</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.55</witsml:strengthForm><witsml:mdStrengthForm uom="m">1983</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1886</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2174</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2078</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">0</witsml:distDrill><witsml:elevKelly uom="m">40</witsml:elevKelly><witsml:sum24Hr>Established Gravel Pack (GP) tool positions. Performed gravel packing job. Circulated out excess gravel. POOH with service string and wash pipe. RIH with SLT tool to conduct BOP pressure test.</witsml:sum24Hr><witsml:forecast24Hr>Conduct BOP pressure test. POOH. Wait on Weather to run middle completion.
6 +
7 +Projected operation tomorrow 06:00: Waiting on Weather.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
8 +
9 +<witsml:fluid><witsml:type>NaCl brine</witsml:type><witsml:dTim>2011-10-03T05:00:00.000Z</witsml:dTim><witsml:md uom="m">2175</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.28</witsml:density><witsml:pv uom="mPa.s">1</witsml:pv><witsml:yp uom="Pa">3</witsml:yp></witsml:fluid>
10 +<witsml:porePressure><witsml:readingKind>measured</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">1.05</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2018.5</witsml:md></witsml:porePressure>
11 +<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 453. Continued pressure testing BOP as per AKD operation procedure to 20 bar for 5 minutes, then 345 bar for 10 minutes. Used yellow pod from Koomey unit. All tests OK. Depth: 453. Function tested Acoustic signal from bridge. Operated Middle Pipe Ram (MPR), OK. Depth: 58. Pulled SLT (Spring Loaded Tool) free from wellhead with 3 mT overpull. Pulled out of BOP with heave compensator engaged. Laid out 1 single 5-7/8&quot; DP to deck. POOH with SLT on 5-7/8&quot; DP from 453 to 58 m. Average tripping speed: 526 m/hr.
12 +Performance feedback: Limited tripping speed due to full bore tool. Depth: 0. Removed bowls. POOH with SLT through rotary. Reinstalled bowls. Racked back SLT stand. POOH and racked back jet sub stand. Depth: 0. Rigged up to test surface equipment. Tested IBOP assembly and kelly hose to 20/345 bar for 5/10 minutes., OK. Function tested Blind Shear Ram and Casing Shear Ram, OK.
13 +Meanwhile: Repaired Prox on Main LGA. Depth: 0. Rigged down cement hose and X-over. Depth: 0. Waited on Weather to run Middle Completion string. Heave &gt; 2 m.
14 +Meanwhile: Tested choke manifold to 20/345 bar for 5/10 minutes, OK.</witsml:extendedReport >
15 +
16 +<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established GP position #1.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested GP (Gravel Pack) Packer. Closed Annular. Pressured up with cement unit to 20 bar for 5 minutes, then 150 bar for 10 minutes, OK. Verified squeeze position. Opened annular.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reestablished reverse position. Activated FAS tool (Flapper Anti Swabbing Tool). Unintentionally closed GP port due to heave. Pumped with 200 lpm to verify position #3 in open position, OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established circulating position and prepared for gravel pack operation. Established position #2..Sat down 25 mT. Attempted to establish circulation with 150 lpm. No Go. Pulled up 13,5 m above position 3 to open GP port. Run in and re-established position #2. Extended cement hose on pump-in stand. Tested hose at 150 bar for 5 minutes, ok.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established circulation rate with HT-400 pump. Increased flow rate in steps: 600 lpm, 10,5 bar. 800 lpm, 15 bar, 1000 lpm, 30 bar. Verified return, ok.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped clean brine 1,28 SG at 1000 lpm, 30 bar using HT-400 pump. Total pumped 38 m3.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped 1,30 SG gravel slurry from HT-400 pump. 1020 lpm, 31 bar. No screen-out observed. Stopped pumping after total pumped 80,3 m3 slurry, equivalent to 108% fill. End pressure 78,3 bar, equivalent to 10 bar below FIT at 9-5/8&quot; shoe. Stopped pumping due to reaching final pumping pressure. Max gas observed 0,2%</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lined up for reversed circulation down kill &amp; choke lines with closed Upper Annular Preventer (UAP) and GP tool in position #3. Circulated with 1,28 sg Brine, 1292 lpm, 40 bar. Pumped 3 x string volume. Observed gravel still coming over shakers. Evaluated situation. Continued circulating.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued circulating down kill &amp; choke lines with closed UAP and GP tool in position #3. Circulated with 1,28 sg Brine, 1292 lpm, 40 bar. Pumped 2 x string volume. Observed shakers clean. Total return of gravel approximately 1,5 ton. Estimated 3,3 ton gravel left around screens.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Opened UAP. Lined up well on Trip Tank 1 prior to closing S-1 sliding sleeve / detent sleeve on GP tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up 1 m above closed sleeve position. Re-eatablished GP position #2. Sat down 10 mT. Lined up to pressure up from cement unit. Attempted to pressure test locked GP sleeve. No Go. Observed increase in Trip Tank indicating sleeve not locked.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up 1 m above closed sleeve position. Re-eatablished GP position #2. Sat down 10 mT.Pressure tested closed sleeve to 20 bar for 2 minutes, then 150 bar for 5 minutes, OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up shifting tool above sliding sleeve. Ran in to verify sleeve closed. Sat down 7 mT.
17 +Meanwhile: Rigged down gravel pack hose.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well on Trip Tank prior to POOH. Observed well static.
18 +Meanwhile: Laid out pump-in stand. Removed Lo-Torque valve and cement hose. Transferred pump-in stand to Aux-rig. Greased nad inspected DDM.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8&quot; DP from 2173 to 2157 m. Laid out one 5-7/8&quot; DP pup joint to deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8&quot; DP from 2157 to 1888 m. Average tripping speed 538 m/hr. Observed gain in Trip Tank.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well on Trip Tank. Observed small gain.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Circulated bottoms up with 1800 lpm, 22 bar. Total pumped 5450 strokes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow Checked well for 10 minutes on Trip tank. Observed well static.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1137</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8&quot; DP from 1888 to 1137 m. Average tripping speed 751 m/hr. Observed fault on main Lower Guiding arm (LGA in Vertical Pipe Handler (VPH) system.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1137</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot LGA/VPH. Found fault on main LGA counter. Parked main LGA for repair. Continued operation with Aux LGA.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">673</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8&quot; DP from 1137 to 673 m. Average tripping speed 464 m/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">673</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well for 10 minutes on Trip Tank prior to pulling BHA through BOP. Observed well static.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">257</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8&quot; DP from 673 to 257 m. Average tripping speed 464 m/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">257</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed auto slips. Broke off and laid out X-over sub. Racked back last 5-7/8&quot; DP stand.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">257</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with GP tool. Cleaned and inspested same. Broke Quick Connector connection. Laid out GP tool to deck. Changed elevator inserts.
19 +Meanwhile: Rigged up Weatherford casing tong.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">240</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Broke inner lower Quick Connect. Laid out same to deck. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 4&quot; Wash Pipe from 240 to 0 m. Laid out same. Total 23 joints pulled. Average tripping speed 96 m/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged down Weatherford casing tong. Changed inserts in elevator. Prepared pipe handling equipment for BOP test run.
20 +Meanwhile: Cleaned and tidied rig floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">58</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged up handling equipment. M/U jet sub and Spring Loaded Tool (SLT). Inspected SLT. Removed bowls. RIH with test tool below RKB. Reinstalled bowls.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">394</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with SLT on 5-7/8&quot; DP from 58 to 394 m. Average running speed 448 m/hr.
21 +Performance feedback: Reduced running speed due to full bore tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">420</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Connected DDM to DP string. Washed wellhead area several times with 1500 lpm, 6 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">453</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up one joint of 5-7/8&quot; DP from deck. RIH with same. Picked up 1 stand of 5-7/8&quot; DP. RIH and landed SLT in Wwellhead. Sat down 10 mT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">453</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested BOP as per AKD operation procedure to 20 bar for 5 minutes, then 345 bar for 10 minutes. Used yellow pod from Koomey unit.</witsml:comments></witsml:activity>
22 +
23 +
24 +
25 +
26 +
27 +
28 +
29 +
30 +
31 +
32 +</witsml:drillReport></witsml:drillReports>