34 10-E-2 H.xml
20.3 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-E-2 H</witsml:nameWell><witsml:nameWellbore>NO 34/10-E-2 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:04:23.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/10-E-2 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/10-E-2 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4107</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2000-08-05T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Songa Offshore</witsml:drillContractor><witsml:rigAlias><witsml:name>SONGA DEE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>290980</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4944</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3542.6</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">25</witsml:elevKelly><witsml:sum24Hr>R/D Riser Running Equipment.
RIH and set WB.
Function test BSR.
Configure EDPHOT.
RIH and recover shallow set plug to surface.
RIH with bridge plug to 2168 m, function test BOP, continued to RIH to 3800 m.
Set bridge plug at 3800 m.
</witsml:sum24Hr><witsml:forecast24Hr>L/D 5" Drill Pipe
Tag cement plug
Displace well to gel mud.
POOH and P/U SRB cutting BHA.
RIH and cut 9 5/8" casing.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>Glydril</witsml:type><witsml:dTim>2011-10-03T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">1034</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.19</witsml:density><witsml:pv uom="mPa.s">13</witsml:pv><witsml:yp uom="Pa">8.5</witsml:yp></witsml:fluid>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 3795. Opened Middle Pipe Ram (MPR), racked back stand and P/U cement stand, connected cement hose.
Pressure surface lines to 200 bar. Depth: 3795. Circulated 1 1/2 x bottoms up at 3500 lpm - 215 bar.
Meanwhile held TBT with all personnel involved with the cementing operation. Depth: 3795. Lined up with cement unit, closed IBOP and applied 10 bar behind.
Pumped 10 m3 drill water with cement unit.
Mixed and pumped 7 .38 m3 of 1.90 sg cement, rotated the string at 40 rpm - 11 kNm.
Chased with 1.8 m3 freshwater from the cement unit.
Displaced cement using the rig pumps with 29.5 m3 of seawater. Depth: 3600. Removed cement hose and racked back cement stand in the derrick.
Tripped out of hole from 3795 m to 3600 m. Depth: 3600. Inserted sponge ball and and circulated bottoms up at 3500lpm, 205 bar. Rotated string at 50 rpm, 12-13 kNm. Depth: 3600. Held TBT for cement job. Picked up cement stand and made up same.
Lined up with cement unit, closed IBOP and applied 10 bar behind.
Pumped 10 m3 drill water with cement unit.
Mixed and pumped 7 .38 m3 of 1.90 sg cement, rotated the string at 50 rpm, 12-13 kNm.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>R/D and cleared drillfloor of all excess equipment.
Installed hydraulic roughneck (HRN) tracks.
Energised slip joint and filled riser with seawater.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held TBT with all personnel involved in changing out the handling equipment.
Changed out bails and elevators and reset anti-collision system.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U wearbushing RT and installed wearbushing as per FMC procedures.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with wearbushing on 5 1/2" HWDP to 135 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">154.4</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran down with wearbushing, opened crown mounted compensator (CMC), then ran down and landed wearbushing with 5 mT downweight. Performed 5 mT overpull.
WB set at 154.4 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH and L/O wear bushing RT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleared catwalk and loaded Emergency Drillpipe Hang Off Tool (EDPHOT) onto the catwalk.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Function tested BSR using the acoustic system, and both pod lines.
Meanwhile: Mechanic checked air leak on Hi Clutch and changed out dump valve on high clutch..</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on crane to complete a load with supply vessel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reconfigured emergency drill pipe hang off tool (EDPHOT). Configured for use with 5" DP.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5 1/2" handling equipment.
Installed insert packer and P/U VMB packer RT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">145</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with VMB RT down to 145 m. Made up to the DDM and took parameters.
Upweight - 47 mT.
Down weight 49 mT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">160</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Broke circulation with 200 lpm - 3 bar, then increased up to 2000 lpm 60 bar.
Washed down and reduced flow rate to 140 lpm - 2 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">168</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Washed down and engaged VMB packer with 10 mT downweight.
Observed pressure increase up to 30 bar. Stopped the pumps and noted pressure bleed off.
Took 10 mT overpull on the packer and proceeded to release the packer as per the Archer engineers instructions.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with VMB packer from 166 m to surface. L/O VMB packer to the deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- equipment recovery</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Due to the promise of adverse weather, installed casing tong on the drillfloor and secured same.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling equipment to 5".</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U amd M/U cement stand and racked back in the derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed handling equipment to 3 1/2"</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held TBT with all personnel with involved with M/U the bridge plug.
P/U and and M/U Halliburton EZSV bridge plug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">291</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with bridge plug on 3 1/2" DP to 291 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">291</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5" handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">291</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Change out die block on hydraulic roughneck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2168</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH from 291 m to 2168 m. Filled pipe every 25 stands.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2168</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Filled pipe, then functioned tested the BOP utilising both yellow and blue pods.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3800</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued to RIH from 2168 m to 3800 m filled the pipe every 20 stands.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">3800</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held TBT with all personnel involved with setting and testing the bridge plug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3800</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Took Parameters:
Upweight 138 mT
Downweight 100 mT
Applied 39 turns to the string and waited 2 mins as per Halliburton procedure.
P/U 8 mT over P/U weight and waited 2 mins. P/U to 156 mT (18 mT overpull) and released RT from bridge plug.
P/U clear of the plug 2 m then ran down and tagged plug with 5 mT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3795</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- mechanical plug</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lined up down the choke and kill and confirmed cement unit line up with 20 bar.
Pressure tested bridge plug to 20 bar x 5 mins and 250 bar x 10 bar - pumped 1680 ltrs.</witsml:comments></witsml:activity>
<witsml:equipFailureInfo><witsml:dTim>2011-09-30T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>service equ -- wellhead tubular equ</witsml:equipClass><witsml:eTimMissProduction uom="min">270</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-01T14:45:00.000Z</witsml:dTimRepair><witsml:description>High Pressure Cap on E-1 failed to land and lock.</witsml:description></witsml:equipFailureInfo><witsml:equipFailureInfo><witsml:dTim>2011-10-01T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>service equ -- wellhead tubular equ</witsml:equipClass><witsml:eTimMissProduction uom="min">885</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-01T14:15:00.000Z</witsml:dTimRepair><witsml:description>Failed to land and lock FMC High Pressure Cap on E-4</witsml:description></witsml:equipFailureInfo><witsml:equipFailureInfo><witsml:dTim>2011-10-02T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:equipClass>service equ -- wellhead tubular equ</witsml:equipClass><witsml:eTimMissProduction uom="min">945</witsml:eTimMissProduction><witsml:dTimRepair>2011-10-02T06:30:00.000Z</witsml:dTimRepair><witsml:description>Landed high pressure cap on E-3, however unable to lock high pressure cap to manifold hub.</witsml:description></witsml:equipFailureInfo>
</witsml:drillReport></witsml:drillReports>