6507 7-A-3 T2.xml 13.1 KB
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6507/7-A-3</witsml:nameWell><witsml:nameWellbore>NO 6507/7-A-3 T2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:07:25.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>6507/7-A-3</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>6507/7-A-3 T2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6616</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>HEIDRUN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>272421</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4697</witsml:md><witsml:tvd uom="m">2230</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4697</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.62</witsml:strengthForm><witsml:mdStrengthForm uom="m">3523</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1697.7</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4688.7</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2225</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">74.2</witsml:elevKelly><witsml:sum24Hr>V&amp;M finished commissioning of tensioner cylinders for production riser. P/U and ran production riser from 117 m to 412 m.  Landed and performed 80 MT overpull test. Filled riser with sea water and pressure tested riser to 345 bar. Installed tension cylinders and transferred weigth to tensioner cylinders. Cut production riser. POOH with production riser running tool string. Installed hatch on skid deck. Furmanite machined down top of production riser (prepared for surface wellhead).</witsml:sum24Hr><witsml:forecast24Hr>Pressure test wellhead. Install surface wellhead wear bushing. Install WOR, BOP and LPR. Pull GTV plug. M/U 8 1/2&quot; BHA. RIH to top of cement while P/U 5&quot; DP.

Operational target tomorrow at 06:00: RIH with 8 1/2&quot; BHA at 850 mMD, while P/U 5&quot; DP.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>

<witsml:fluid><witsml:type>Performadril</witsml:type><witsml:dTim>2011-10-03T03:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:presBopRating  uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.4</witsml:density><witsml:pv uom="mPa.s">25</witsml:pv><witsml:yp uom="Pa">13.5</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>Performadril</witsml:type><witsml:dTim>2011-10-03T11:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:presBopRating  uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.4</witsml:density><witsml:pv uom="mPa.s">26</witsml:pv><witsml:yp uom="Pa">13.5</witsml:yp></witsml:fluid><witsml:fluid><witsml:type>Performadril</witsml:type><witsml:dTim>2011-10-03T22:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:presBopRating  uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.4</witsml:density><witsml:pv uom="mPa.s">25</witsml:pv><witsml:yp uom="Pa">14</witsml:yp></witsml:fluid>

<witsml:extendedReport  dTim="2011-10-04T00:00:00.000Z">Depth: 0. Furmanite finished machining down top of production riser (prepared for SWH). Rigged down Furmanite equipment.

Meanwhile: 
 - Finished L/D 35 stands 5 7/8&quot; DP from derrick. Trained ass.driller and new roughneck on last 5 stands. Depth: 0. Installed surface wellhead. Verified orientation with production dept. Installed camforging tool. Camforged top of production riser to surface wellhead.

Meanwhile:
 - Held pre job meeting. 
 - Started cut &amp; slip drill line.</witsml:extendedReport >

<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">117</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>V&amp;M finished commissioning of tensioner cylinders for production riser. Pressure tested lines to cabinet. Experienced leakage, installed new line. Tested same, still leakage. Repaired and tested ok. Checked/inspected V&amp;M workplace prior to continue running riser.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">153</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U and ran production riser from 117 m to 153 m. Trained ass.driller on first 3 joints. 
Meanwhile: Continued testing standpipe.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">153</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pit stop. Discussed how to optimize running speed.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">316</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>P/U and ran production riser from 153 m to 316 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">346</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up 3 m pup joint and installed lifting sub. P/U lower splash zone joint. Installed jaws in casing tong. Removed slips, changed to #1 bushings. M/U and RIH with lower and upper splash zone joints. P/U 1 standard joint.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:20:00.000Z</witsml:dTimEnd><witsml:md uom="m">346</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed jaws in casing tong. Changed casing slips and inner bushings. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:20:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U and RIH with 2 standard production riser joints. P/U tension spool piece (TSP) and installed on riser joint.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">381</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed master bushings. RIH with TSP. Installed master and #3 inner bushings. Installed 6 5/8&quot; slips. Held handover. Changed handling equipment, inserts in BX-elevator and casing tong.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">412</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>M/U xo, pup joint and 1 stand 5 7/8&quot; HWDP for landing string. Installed valve on production riser running tool. RIH and landed production riser. Set down 15 MT. Recorded up/down weights prior to landing: 94 MT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">412</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed 80 MT overpull test on connector (174 MT on weight indicator). Reduced overpull to 30 MT. Filled riser with sea water and tested riser to 20 bar/5 min, 345 bar/15 min.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">412</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Built scaffolding on main deck for installing tension cylinders on production riser. Installed graiting on tree deck. Installed tension cylinders on production riser and transferred weigth to tensioner cylinders.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">31</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut production riser. Kept 1-2 MT overpull on string during cutting operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with production riser running tool string. Installed hatch on skid deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Furmanite machined down top of production riser (prepared for SWH).

Meanwhile: 
 - L/D production riser running tool, pup and xo.
 - Finished testing standpipe manifold and DDM valves to 20 bar/5 min, 345 bar/10 min.
 - Rigged down pressure testing equipment on DDM.
 - Dressed pipe shuttle to drill pipe.
 - Held pre job meeting.
 - Picked up mousehole and installed in rotary.
 - Started L/D 45 stands 5 7/8&quot; DP from derrick.</witsml:comments></witsml:activity>










</witsml:drillReport></witsml:drillReports>