34 10-B-40 A.xml
7.18 KB
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-B-40 A</witsml:nameWell><witsml:nameWellbore>NO 34/10-B-40 A</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:04:03.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/10-B-40 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/10-B-40 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>3628</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Kvaerner Well Services</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271917</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4626</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">4.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4773</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2277.5</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">80.7</witsml:elevKelly><witsml:sum24Hr>Spotted equipment on BOP deck. Took over the well from production department. RU WL and pumping equipment on the well. On standby to lift up lubricator due to wind speed exceeded operation limit for WL crane. </witsml:sum24Hr><witsml:forecast24Hr>RIH with BHA#1 (WL brush). Spot Safe-Solv 148 and brush DHSV area. Inflow test DHSV and RD equipment from the well.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Performed pre-job meeting with night crew. Depth: 0. Waited on weather. Continued on standby due to strong wind. Depth: 0. Function test Well Equip jar. MU BHA#1 (6,3" brush with 6,1" no-go) and installed in lubricator. Leak tested RU to 20/345 bar 5/10 min. </witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed startup meeting with night crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Spotted WL and pumping equipment on work area. Prepared brush BHA. Lined up pumping lines towards the well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cont. spotting equipment in BOP area. Built scaffolding around X-mas tree.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for activity program to be signed. Meanwhile had start up meeting with day crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Production to hand over well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Handed well over from Production to Well operation. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RU pumping line from cement unit to KWV. RU lower riser and WL BOP. Function tested WL BOP. Leak tested riser and WL BOP to 20/345 bar for 5/10 mins. Leak tested pump line to 20/345 bar for 5/10 mins.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed A-standard meeting, evaluated situation prior proceed operation with respect to strong wind. Secured work place. On standby to lift up lubricator and BHA due to wind speed was up to 58 knots while max allowable wind speed to operate WL crane is 48 knots according to APOS.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>