6608 10-H-4 AH.xml
23.8 KB
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6608/10-H-4 AH</witsml:nameWell><witsml:nameWellbore>NO 6608/10-H-4 AH</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:08:19.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>6608/10-H-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>6608/10-H-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6626</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2011-06-29T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Drilling Operations AS</witsml:drillContractor><witsml:rigAlias><witsml:name>AKER SPITSBERGEN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>404201</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2174</witsml:md><witsml:tvd uom="m">2078</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2231</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.55</witsml:strengthForm><witsml:mdStrengthForm uom="m">1983</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1886</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2174</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2078</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">0</witsml:distDrill><witsml:elevKelly uom="m">40</witsml:elevKelly><witsml:sum24Hr>Established Gravel Pack (GP) tool positions. Performed gravel packing job. Circulated out excess gravel. POOH with service string and wash pipe. RIH with SLT tool to conduct BOP pressure test.</witsml:sum24Hr><witsml:forecast24Hr>Conduct BOP pressure test. POOH. Wait on Weather to run middle completion.
Projected operation tomorrow 06:00: Waiting on Weather.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>NaCl brine</witsml:type><witsml:dTim>2011-10-03T05:00:00.000Z</witsml:dTim><witsml:md uom="m">2175</witsml:md><witsml:presBopRating uom="bar">1035</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.28</witsml:density><witsml:pv uom="mPa.s">1</witsml:pv><witsml:yp uom="Pa">3</witsml:yp></witsml:fluid>
<witsml:porePressure><witsml:readingKind>measured</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">1.05</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2018.5</witsml:md></witsml:porePressure>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 453. Continued pressure testing BOP as per AKD operation procedure to 20 bar for 5 minutes, then 345 bar for 10 minutes. Used yellow pod from Koomey unit. All tests OK. Depth: 453. Function tested Acoustic signal from bridge. Operated Middle Pipe Ram (MPR), OK. Depth: 58. Pulled SLT (Spring Loaded Tool) free from wellhead with 3 mT overpull. Pulled out of BOP with heave compensator engaged. Laid out 1 single 5-7/8" DP to deck. POOH with SLT on 5-7/8" DP from 453 to 58 m. Average tripping speed: 526 m/hr.
Performance feedback: Limited tripping speed due to full bore tool. Depth: 0. Removed bowls. POOH with SLT through rotary. Reinstalled bowls. Racked back SLT stand. POOH and racked back jet sub stand. Depth: 0. Rigged up to test surface equipment. Tested IBOP assembly and kelly hose to 20/345 bar for 5/10 minutes., OK. Function tested Blind Shear Ram and Casing Shear Ram, OK.
Meanwhile: Repaired Prox on Main LGA. Depth: 0. Rigged down cement hose and X-over. Depth: 0. Waited on Weather to run Middle Completion string. Heave > 2 m.
Meanwhile: Tested choke manifold to 20/345 bar for 5/10 minutes, OK.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established GP position #1.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested GP (Gravel Pack) Packer. Closed Annular. Pressured up with cement unit to 20 bar for 5 minutes, then 150 bar for 10 minutes, OK. Verified squeeze position. Opened annular.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reestablished reverse position. Activated FAS tool (Flapper Anti Swabbing Tool). Unintentionally closed GP port due to heave. Pumped with 200 lpm to verify position #3 in open position, OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established circulating position and prepared for gravel pack operation. Established position #2..Sat down 25 mT. Attempted to establish circulation with 150 lpm. No Go. Pulled up 13,5 m above position 3 to open GP port. Run in and re-established position #2. Extended cement hose on pump-in stand. Tested hose at 150 bar for 5 minutes, ok.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Established circulation rate with HT-400 pump. Increased flow rate in steps: 600 lpm, 10,5 bar. 800 lpm, 15 bar, 1000 lpm, 30 bar. Verified return, ok.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped clean brine 1,28 SG at 1000 lpm, 30 bar using HT-400 pump. Total pumped 38 m3.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pumped 1,30 SG gravel slurry from HT-400 pump. 1020 lpm, 31 bar. No screen-out observed. Stopped pumping after total pumped 80,3 m3 slurry, equivalent to 108% fill. End pressure 78,3 bar, equivalent to 10 bar below FIT at 9-5/8" shoe. Stopped pumping due to reaching final pumping pressure. Max gas observed 0,2%</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lined up for reversed circulation down kill & choke lines with closed Upper Annular Preventer (UAP) and GP tool in position #3. Circulated with 1,28 sg Brine, 1292 lpm, 40 bar. Pumped 3 x string volume. Observed gravel still coming over shakers. Evaluated situation. Continued circulating.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued circulating down kill & choke lines with closed UAP and GP tool in position #3. Circulated with 1,28 sg Brine, 1292 lpm, 40 bar. Pumped 2 x string volume. Observed shakers clean. Total return of gravel approximately 1,5 ton. Estimated 3,3 ton gravel left around screens.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Opened UAP. Lined up well on Trip Tank 1 prior to closing S-1 sliding sleeve / detent sleeve on GP tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up 1 m above closed sleeve position. Re-eatablished GP position #2. Sat down 10 mT. Lined up to pressure up from cement unit. Attempted to pressure test locked GP sleeve. No Go. Observed increase in Trip Tank indicating sleeve not locked.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up 1 m above closed sleeve position. Re-eatablished GP position #2. Sat down 10 mT.Pressure tested closed sleeve to 20 bar for 2 minutes, then 150 bar for 5 minutes, OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up shifting tool above sliding sleeve. Ran in to verify sleeve closed. Sat down 7 mT.
Meanwhile: Rigged down gravel pack hose.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well on Trip Tank prior to POOH. Observed well static.
Meanwhile: Laid out pump-in stand. Removed Lo-Torque valve and cement hose. Transferred pump-in stand to Aux-rig. Greased nad inspected DDM.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">2173</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8" DP from 2173 to 2157 m. Laid out one 5-7/8" DP pup joint to deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8" DP from 2157 to 1888 m. Average tripping speed 538 m/hr. Observed gain in Trip Tank.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well on Trip Tank. Observed small gain.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Circulated bottoms up with 1800 lpm, 22 bar. Total pumped 5450 strokes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1888</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow Checked well for 10 minutes on Trip tank. Observed well static.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1137</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8" DP from 1888 to 1137 m. Average tripping speed 751 m/hr. Observed fault on main Lower Guiding arm (LGA in Vertical Pipe Handler (VPH) system.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">1137</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot LGA/VPH. Found fault on main LGA counter. Parked main LGA for repair. Continued operation with Aux LGA.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">673</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8" DP from 1137 to 673 m. Average tripping speed 464 m/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">673</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flow checked well for 10 minutes on Trip Tank prior to pulling BHA through BOP. Observed well static.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">257</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with wash pipe and GP service string on 5-7/8" DP from 673 to 257 m. Average tripping speed 464 m/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">257</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed auto slips. Broke off and laid out X-over sub. Racked back last 5-7/8" DP stand.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">257</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with GP tool. Cleaned and inspested same. Broke Quick Connector connection. Laid out GP tool to deck. Changed elevator inserts.
Meanwhile: Rigged up Weatherford casing tong.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">240</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Broke inner lower Quick Connect. Laid out same to deck. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 4" Wash Pipe from 240 to 0 m. Laid out same. Total 23 joints pulled. Average tripping speed 96 m/hr.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- sand control</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged down Weatherford casing tong. Changed inserts in elevator. Prepared pipe handling equipment for BOP test run.
Meanwhile: Cleaned and tidied rig floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">58</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged up handling equipment. M/U jet sub and Spring Loaded Tool (SLT). Inspected SLT. Removed bowls. RIH with test tool below RKB. Reinstalled bowls.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">394</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with SLT on 5-7/8" DP from 58 to 394 m. Average running speed 448 m/hr.
Performance feedback: Reduced running speed due to full bore tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">420</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Connected DDM to DP string. Washed wellhead area several times with 1500 lpm, 6 bar.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">453</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up one joint of 5-7/8" DP from deck. RIH with same. Picked up 1 stand of 5-7/8" DP. RIH and landed SLT in Wwellhead. Sat down 10 mT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">453</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested BOP as per AKD operation procedure to 20 bar for 5 minutes, then 345 bar for 10 minutes. Used yellow pod from Koomey unit.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>