<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 31/4-A-14 E</witsml:nameWell><witsml:nameWellbore>NO 31/4-A-14 ET2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:57:58.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>31/4-A-14 E</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>31/4-A-14 ET2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6623</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2011-08-06T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>KCA Deutag Drilling Norge AS</witsml:drillContractor><witsml:rigAlias><witsml:name>BRAGE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>277405</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">6523</witsml:md><witsml:tvd uom="m">2316.2</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">6523</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.4</witsml:strengthForm><witsml:mdStrengthForm uom="m">5572</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2117.7</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">6522</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2316.1</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">62.6</witsml:elevKelly><witsml:sum24Hr>POOH with 5 7/8" cmt drill-out assy from 4146 m. Bit worn out. Cut and slipped drilline. Changed phone light in drk. Ran test plug with weight below. Repaired leaky choke man. valve. Tested BOP. Pulled test plug.</witsml:sum24Hr><witsml:forecast24Hr>Pull BOP test string. Test top drive valves and Kelly hose. RIH with 5 7/8" cmt drill-out assy. Drill cmt. in 7" liner from 6411 m.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:bitRecord><witsml:numBit>16</witsml:numBit><witsml:diaBit uom="in">5.875</witsml:diaBit><witsml:manufacturer>Security DBS</witsml:manufacturer><witsml:codeMfg>QH4GR</witsml:codeMfg></witsml:bitRecord><witsml:bitRecord><witsml:numBit>17</witsml:numBit><witsml:diaBit uom="in">5.875</witsml:diaBit><witsml:manufacturer>Smith Bits</witsml:manufacturer><witsml:codeMfg>XR+</witsml:codeMfg></witsml:bitRecord>
<witsml:fluid><witsml:type>Versatec</witsml:type><witsml:dTim>2011-10-03T20:00:00.000Z</witsml:dTim><witsml:md uom="m">6411</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.31</witsml:density><witsml:pv uom="mPa.s">42</witsml:pv><witsml:yp uom="Pa">9</witsml:yp></witsml:fluid>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. POOH 2 stands and laid down 8 singles of 5" HWDP used as weight below test plug. Depth: 0. Connected swedge and HP-hose to top drive.
Pressure tested top drive valves and Kelly hose to 20/ 295 bar for 5/ 10 minutes.
Removed swedge and HP-hose.
Meanwhile: Function tested shear ram. Depth: 0. Changed to 3 1/2" handling equipment. Depth: 22. Picked up 4 3/4" DC with 5 3/4" stabilizer and old 5 7/8" bit.
Changed bit. Checked float in stabilizer, ok.
Made up 1 single DC from deck. Depth: 106. Ran 4 3/4" DC stand, jar stand and accelerator stand. Depth: 106. Changed to PS-slips. Changed to 4" handling equipment. Depth: 340. RIH with 5 7/8" cement clean-out assembly from 106 m to 340 m, on 4" DP.
Tripping speed limited due to wind direction. Watched hoses/ service loop pass freely in derrick.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1200</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 5 7/8" cement drill-out assembly from 4146 m to 1200 m, on 5 1/2" DP.
Meanwile: Pressure tested standpipe- and choke manifolds, ongoing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1200</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 4" handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">200</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 5 7/8" cement drill-out assembly from 1200 m to 200 m, on 4" DP.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>POOH with 5 7/8" cement drill-out assembly from 200 m to 136 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Flowchecked well for 15 minutes before BHA.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to master bushing. Changed to 3 1/2" handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">136</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held handover and prejob meeting with day crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Racked 1 DC stand, jar stand and accelerator stand. Laid down 2 single DC's with bit and
stabilizers. Dir. driller checked bit and stabilizers.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned and cleared rig floor. Prepared next operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held prejob meeting for cut and slip of drilline according to A-standard method.
Went through relevant Wellman procedure.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Hung off travelling block. Prepared to cut and slip.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cut and slipped 33 m drilline. Checked drawworks brakes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed and secured hang-off line.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Reset anti collision system.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 5" handling equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Statoil electrician changed telephone flashing light on URA cabin in derrick.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with 8 singles from deck and 2 stands of 5" HWDP for weight below test plug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran test plug on 4 singles of 5" DP from deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot leaky choke manifold valve no. 24.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Dismantled and repaired leakage through stem on gate valve. Reinstalled valve.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested choke valve no. 24 to 20 bar/ 5 min and 345 bar/ 10 min.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T23:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pressure tested pipe rams to 20/ 295 bar and annular preventer to 20/ 239 bar - 5/ 10 minutes.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T23:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled test plug and laid down 4 singles of 5" DP.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>