34 11-A-11.xml 7.96 KB
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/11-A-11</witsml:nameWell><witsml:nameWellbore>NO 34/11-A-11</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:05:05.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/11-A-11</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/11-A-11</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5001</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dateDrillComplete>2004-12-27</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>KVITEBJØRN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280877</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4389</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">2.1</witsml:strengthForm><witsml:mdStrengthForm uom="m">4200</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3989</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4483.2</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">60.5</witsml:elevKelly><witsml:sum24Hr>Received logging equipment from town. Waited for Baker logging personnel to arrive. Baker personnel arrived. Handed well from Prod dept. to D&amp;W. Transferred controll of DHSV and HMV from platform system to local panel. Waited for Prod dept. to close in wells prior to performing critical lift</witsml:sum24Hr><witsml:forecast24Hr>Perform critical lift and rig on well. Prepare Baker logging equipment. MU BHA no 1 with CMI logging tool. RIH with CMI logging tool to TD. Logg with CMI tool according to program.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>

<witsml:fluid><witsml:type>Fresh Water</witsml:type><witsml:dTim>2011-10-03T16:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating  uom="bar">827</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.05</witsml:density><witsml:pv uom="mPa.s">-9999</witsml:pv><witsml:yp uom="Pa">-9999</witsml:yp></witsml:fluid>

<witsml:extendedReport  dTim="2011-10-04T00:00:00.000Z">Depth: 0. Disconnected KWV end cap and  RU kill line to KWV. Meanwhile Production department to close in wells prior to performing critical lift. Depth: 0. Changed hatch cover to WL hatch. Removed X-mas top cap. Performed critical lift and landed wireline stack onto x-mas tree. MU clamp on lower riser.  Depth: 0. Function tested BOP Depth: 0. Leak tested with cmt unit against closed Lo-Tq valve outside KVW to 20/ 445 bar for 5/ 10 min Depth: 0. Leak tested against closed KWV to 20/ 445 bar for 5/ 10 min.</witsml:extendedReport >

<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Received logging equipment from town. Spotted tool containers and logging cabin on pipedeck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Baker logging personnel to arrive. Meanwhile held A-standard training with topic leak testing and prepared equipment for 5/16&quot; mono cable operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Baker logging personnel to arrive. Meanwhile prepared WL equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Baker personnel arrived. New arrived Baker personnel on platform introduction brief.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting with involved personnel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Handed well from Prod dept. to D&amp;W. Transferred controll of DHSV and HMV from platform system to local panel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Preformed SJA and DOP meeting prior critical lifting operations (RU WL riser incl WL BOP).</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Production department to close in wells prior to performing critical lift.</witsml:comments></witsml:activity>










</witsml:drillReport></witsml:drillReports>