David Price

Deleted all confidential test datasets from epim ontologies

Showing 232 changed files with 0 additions and 2466 deletions
This diff is collapsed. Click to expand it.
This diff is collapsed. Click to expand it.
This diff is collapsed. Click to expand it.
This diff could not be displayed because it is too large.
<?xml version="1.0" encoding="UTF-8"?>
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:drillReport><witsml:nameWell>Norvarg</witsml:nameWell><witsml:nameWellbore>7225/3-1</witsml:nameWellbore><witsml:name>Norvarg</witsml:name><witsml:dTimStart>2011-07-21T00:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-22T00:00:00.001Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-07-22T10:26:26.001Z</witsml:createDate><witsml:wellAlias><witsml:name>Norvarg</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias><witsml:wellboreAlias><witsml:name>7225/3-1</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6587</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias><witsml:wellDatum><witsml:name>Kelly Bushing</witsml:name><witsml:code>KB</witsml:code></witsml:wellDatum><witsml:wellDatum><witsml:name>Sea Level</witsml:name><witsml:code>SL</witsml:code></witsml:wellDatum><witsml:wellboreInfo><witsml:dTimSpud>2011-04-30T14:30:00.001Z</witsml:dTimSpud><witsml:operator>TOTAL E&amp;P Norge</witsml:operator><witsml:drillContractor>Seadrill</witsml:drillContractor><witsml:rigAlias><witsml:name>WEST PHOENIX</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>390874</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo><witsml:statusInfo><witsml:dTim>2011-07-21T00:00:00.001Z</witsml:dTim><witsml:md uom="m">4150</witsml:md><witsml:diaPilot uom="in">0</witsml:diaPilot><witsml:mdDiaPilotPlan uom="m">0</witsml:mdDiaPilotPlan><witsml:tvdDiaPilotPlan uom="m">0</witsml:tvdDiaPilotPlan><witsml:typeWellbore>initial</witsml:typeWellbore><witsml:diaCsgLast uom="in">6.999986</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3750</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3748.267</witsml:tvdCsgLast><witsml:mdPlanned uom="m">0</witsml:mdPlanned><witsml:distDrill uom="m">0</witsml:distDrill><witsml:elevKelly uom="m">39</witsml:elevKelly><witsml:sum24Hr>Performed MH software and maintenance on main rig. Pressure tested cement plug 2B to 168 bar. RIH with 9 5/8" clean out assembly. Scraped packer setting area from 1510 m to 1540 m.</witsml:sum24Hr><witsml:forecast24Hr>Clean well with mud. Displace to SW. Inflow test. Displace to brine.</witsml:forecast24Hr></witsml:statusInfo><witsml:fluid><witsml:type>waterbased</witsml:type><witsml:dTim>2011-07-21T21:00:00.001Z</witsml:dTim><witsml:md uom="m">2100</witsml:md><witsml:tvd uom="m">2099.668</witsml:tvd><witsml:presBopRating uom="bar">1034.214</witsml:presBopRating><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.45</witsml:density><witsml:pv uom="mPa.s">24</witsml:pv><witsml:yp uom="Pa">18.6733</witsml:yp></witsml:fluid><witsml:extendedReport dTim="2011-07-22T06:00:00.001Z">Circulating well clean with mud.</witsml:extendedReport><witsml:activity><witsml:dTimStart>2011-07-21T00:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-21T14:30:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed MH software update and maintenance program on aux. and main rig. Problems initiating TIA due to blocked slide in valve. Meanwhile lined up and pressure tested cement plug no 2B to 168 bar for 10 min.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-07-21T14:30:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-21T15:00:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>WELL TESTING,WELL TESTING,SCRAP</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>PU premade assemblies from deck and RIH to 23 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-07-21T15:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-21T22:00:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>WELL TESTING,WELL TESTING,SCRAP</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with casing scraping BHA on 5 7/8" DP from 23 m to 1527 m. broke circulation every 500 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-07-21T22:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-22T00:00:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>WELL TESTING,WELL TESTING,SCRAP</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>MU DDM. Scraped 9 5/8" casing from 1510 m to 1540 m, 1625 lpm, 60 bar, 120 RPM, 6,4 KNm torque. Had to change shaker screens from 230 to 120 mesh at 22:25 hrs. Max flow prior to change screens 945 lpm.</witsml:comments></witsml:activity></witsml:drillReport></witsml:drillReports>
<?xml version="1.0" encoding="UTF-8"?>
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:drillReport><witsml:nameWell>Norvarg</witsml:nameWell><witsml:nameWellbore>7225/3-1</witsml:nameWellbore><witsml:name>Norvarg</witsml:name><witsml:dTimStart>2011-07-21T00:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-22T00:00:00.001Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-07-22T14:46:12.001Z</witsml:createDate><witsml:wellAlias><witsml:name>Norvarg</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias><witsml:wellboreAlias><witsml:name>7225/3-1</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6587</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias><witsml:wellDatum><witsml:name>Kelly Bushing</witsml:name><witsml:code>KB</witsml:code></witsml:wellDatum><witsml:wellDatum><witsml:name>Sea Level</witsml:name><witsml:code>SL</witsml:code></witsml:wellDatum><witsml:wellboreInfo><witsml:dTimSpud>2011-04-30T14:30:00.001Z</witsml:dTimSpud><witsml:operator>TOTAL E&amp;P Norge</witsml:operator><witsml:drillContractor>Seadrill</witsml:drillContractor><witsml:rigAlias><witsml:name>WEST PHOENIX</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>390874</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo><witsml:statusInfo><witsml:dTim>2011-07-21T00:00:00.001Z</witsml:dTim><witsml:md uom="m">4150</witsml:md><witsml:diaPilot uom="in">0</witsml:diaPilot><witsml:mdDiaPilotPlan uom="m">0</witsml:mdDiaPilotPlan><witsml:tvdDiaPilotPlan uom="m">0</witsml:tvdDiaPilotPlan><witsml:typeWellbore>initial</witsml:typeWellbore><witsml:diaCsgLast uom="in">6.999986</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3750</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3748.267</witsml:tvdCsgLast><witsml:mdPlanned uom="m">0</witsml:mdPlanned><witsml:distDrill uom="m">0</witsml:distDrill><witsml:elevKelly uom="m">39</witsml:elevKelly><witsml:sum24Hr>Performed MH software and maintenance on main rig. Pressure tested cement plug 2B to 168 bar. RIH with 9 5/8" clean out assembly. Scraped packer setting area from 1510 m to 1540 m.</witsml:sum24Hr><witsml:forecast24Hr>Clean well with mud. Displace to SW. Inflow test. Displace to brine.</witsml:forecast24Hr></witsml:statusInfo><witsml:fluid><witsml:type>waterbased</witsml:type><witsml:dTim>2011-07-21T21:00:00.001Z</witsml:dTim><witsml:md uom="m">2100</witsml:md><witsml:tvd uom="m">2099.668</witsml:tvd><witsml:presBopRating uom="bar">1034.214</witsml:presBopRating><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.45</witsml:density><witsml:pv uom="mPa.s">24</witsml:pv><witsml:yp uom="Pa">18.6733</witsml:yp></witsml:fluid><witsml:extendedReport dTim="2011-07-22T06:00:00.001Z">Circulating well clean with mud.</witsml:extendedReport><witsml:activity><witsml:dTimStart>2011-07-21T00:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-21T14:30:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed MH software update and maintenance program on aux. and main rig. Problems initiating TIA due to blocked slide in valve. Meanwhile lined up and pressure tested cement plug no 2B to 168 bar for 10 min.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-07-21T14:30:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-21T15:00:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>PU premade assemblies from deck and RIH to 23 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-07-21T15:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-21T22:00:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RIH with casing scraping BHA on 5 7/8" DP from 23 m to 1527 m. broke circulation every 500 m.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-07-21T22:00:00.001Z</witsml:dTimStart><witsml:dTimEnd>2011-07-22T00:00:00.001Z</witsml:dTimEnd><witsml:md uom="m">4150</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>MU DDM. Scraped 9 5/8" casing from 1510 m to 1540 m, 1625 lpm, 60 bar, 120 RPM, 6,4 KNm torque. Had to change shaker screens from 230 to 120 mesh at 22:25 hrs. Max flow prior to change screens 945 lpm.</witsml:comments></witsml:activity></witsml:drillReport></witsml:drillReports>
This diff is collapsed. Click to expand it.
<?xml-stylesheet type="text/xsl" href="ddr_HTML_Report.xsl"?>
<witsml:drillReports version="1.3.1.0(NPD)" xmlns:witsml="http://www.witsml.org/schemas/131" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/131 http://www.npd.no/schema/CDRS/131/WITSML_DrillReport_Norwegian_Profiled_Schema.xsd"><witsml:documentInfo><witsml:DocumentName>Drill Report</witsml:DocumentName><witsml:Owner>IIP</witsml:Owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 30/9-F-9</witsml:nameWell><witsml:nameWellbore>NO 30/9-F-9</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2009-01-12T06:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T06:00:00</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2009-01-13T12:00:26</witsml:createDate><witsml:wellAlias><witsml:name>30/9-F-9</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias><witsml:wellboreAlias><witsml:name>30/9-F-9</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5857</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreInfo><witsml:dTimSpud>2006-07-23T00:00:00</witsml:dTimSpud><witsml:operator>StatoilHydro</witsml:operator><witsml:drillContractor>KCA Deutag Drilling Norge AS</witsml:drillContractor><witsml:rigAlias><witsml:name>OSEBERG SØR</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280205</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo><witsml:statusInfo><witsml:dTim>2009-01-13T00:00:00</witsml:dTim><witsml:md uom="m">5350</witsml:md><witsml:tvd uom="m">2645.6</witsml:tvd><witsml:diaHole uom="in">17.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">5350</witsml:mdDiaHoleStart><witsml:mdDiaPilotPlan uom="m">5350</witsml:mdDiaPilotPlan><witsml:strengthForm uom="g/cm3">1.58</witsml:strengthForm><witsml:mdStrengthForm uom="m">3609</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2230.4</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">13.375</witsml:diaCsgLast><witsml:mdCsgLast uom="m">5344</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2644.6</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">67.2</witsml:elevKelly><witsml:sum24Hr>Waited on production to finish testing of X-mas tree. Nippled up add-on spool, new drilling spool, HP riser, BOP and diverter.</witsml:sum24Hr><witsml:forecast24Hr>Pick up and make up 6 5/8&quot; DP. Test add-on spool and HP riser connection.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo><witsml:activity><witsml:dTimStart>2009-01-12T06:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T13:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on production to finish testing of X-mas tree. Meanwhile completed test of standpipe manifold, rigged down manrider winch and installed mouse hole.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T13:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T14:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held SJA meeting prior to heavy lift operation. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T14:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T15:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Prepared nippling operation. Picked up HP riser from deck and landed riser in spider.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T15:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T17:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for production to shut in wells.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T17:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T19:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Removed hatches and lowered add-on spool to well head. Oriented add-on spool and connected same to well head.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T19:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-12T23:30:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lowered down new drilling spool and made up same to add-on spool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-12T23:30:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T00:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lowered down HP riser on driling spool. Installed hatches in catedral.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T00:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T02:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Nippled up BOP, bell nipple and diverter.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T02:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T04:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Laid out 6 5/8&quot; DP on deck. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T04:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T05:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Laid down 6 5/8&quot; HWDP, R2 from derrick to deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2009-01-13T05:00:00</witsml:dTimStart><witsml:dTimEnd>2009-01-13T06:00:00</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Picked up and made up 6 5/8&quot; DP from deck. Racked stands in derrick.</witsml:comments></witsml:activity></witsml:drillReport></witsml:drillReports>
\ No newline at end of file
This diff is collapsed. Click to expand it.
<ValidateAndUploadReportResponse xmlns="uri:www.npd.no/DrillReportService/2007/11"><ValidateAndUploadReportResult xmlns:a="http://www.npd.no/KnownTypes/2007/11" xmlns:i="http://www.w3.org/2001/XMLSchema-instance"><a:Errors><a:errors><a:errorMessage>Validating facility:
Validation failed for NPD Name and NPD code in XML node 'witsml:rigAlias'.
NPD Name = POLAR PIONEER.
NPD code = 289333.
</a:errorMessage><a:errorType>FactWareHouseValidation</a:errorType></a:errors></a:Errors><a:FactpageValidation>Failure</a:FactpageValidation><a:FileReceived>2010-02-13T12:00:21.3365+01:00</a:FileReceived><a:Ip_Address>not_in_wcf</a:Ip_Address><a:JobSuccesfullyCompleted>Failure</a:JobSuccesfullyCompleted><a:Operator_Name>Statoil</a:Operator_Name><a:ReportReceivedDateTime>2010-02-13T12:00:21.3365+01:00</a:ReportReceivedDateTime><a:ReportWellboreNames>31/2-M-14 CY1H</a:ReportWellboreNames><a:Report_Id>7309866</a:Report_Id><a:Report_Log_Id>7309867</a:Report_Log_Id><a:XmlSchemaValidationState>Failure</a:XmlSchemaValidationState></ValidateAndUploadReportResult></ValidateAndUploadReportResponse>
\ No newline at end of file
<serviceResponse xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema" xmlns="http://report.ws.services.licenseweb.collaboration.ec.com/">
<status xmlns="">FAILURE</status>
<servicerrors xmlns="">
<description>Can not find a valid license based on wellname 33/9-A-17 B and wellbore_id 5836</description>
<errorType>VALIDATION</errorType>
<message>Failed in NPD validation of report: 2009-08-02T00:00:00.000Z</message>
</servicerrors>
</serviceResponse>
\ No newline at end of file
<?xml version="1.0" encoding="utf-8"?>
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:documentInfo>
<witsml:documentName>Drill Report</witsml:documentName>
<witsml:documentDate>2011-09-27T11:08:10.001Z</witsml:documentDate>
<witsml:owner>ConocoPhillips</witsml:owner>
</witsml:documentInfo>
<witsml:drillReport>
<witsml:nameWell>2/4-K-08</witsml:nameWell>
<witsml:nameWellbore>2/4-K-8 B</witsml:nameWellbore>
<witsml:name>2/4-K-8</witsml:name>
<witsml:dTimStart>2011-09-26T00:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-27T00:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-09-27T11:08:10.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>2/4-K-08</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>2/4-K-8 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6609</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m" datum="SL">36.271</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
</witsml:wellDatum>
<witsml:wellCRS>
<witsml:name>ED50</witsml:name>
<witsml:geographic>
<witsml:geodeticDatumCode>ED50</witsml:geodeticDatumCode>
</witsml:geographic>
</witsml:wellCRS>
<witsml:wellboreInfo>
<witsml:operator>ConocoPhillips</witsml:operator>
<witsml:drillContractor>ARCHER</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>EKOFISK K</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>271469</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-09-26T00:00:00.001Z</witsml:dTim>
<witsml:md uom="m">2250.948</witsml:md>
<witsml:typeWellbore>sidetrack</witsml:typeWellbore>
<witsml:mdKickoff uom="m">2735.58</witsml:mdKickoff>
<witsml:diaCsgLast uom="in">10.75</witsml:diaCsgLast>
<witsml:mdCsgLast uom="m">2735.885</witsml:mdCsgLast>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">56.693</witsml:elevKelly>
<witsml:sum24Hr>Change powerloop on eagle while waiting on GeoPilot, change plans, rih with cement stinger to plug back.</witsml:sum24Hr>
<witsml:forecast24Hr>Set balanced cement plug and pooh with cement stinger. Rih with drilling BHA.</witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:fluid>
<witsml:type>Warp</witsml:type>
<witsml:dTim>2011-09-26T00:00:00.001Z</witsml:dTim>
<witsml:md uom="m">2807.818</witsml:md>
<witsml:tvd uom="m">1987.108</witsml:tvd>
<witsml:presBopRating uom="bar">344.738</witsml:presBopRating>
<witsml:mudClass>oil based</witsml:mudClass>
<witsml:density uom="g/cm3">1.737</witsml:density>
<witsml:pv uom="mPa.s">35</witsml:pv>
<witsml:yp uom="Pa">4.309</witsml:yp>
</witsml:fluid>
<witsml:extendedReport dTim="2011-09-27T01:45:00.001Z">Rih with cement stinger @ 7385 ft</witsml:extendedReport>
<witsml:activity>
<witsml:dTimStart>2011-09-26T00:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T00:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">0</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>Clean and clear rigfloor</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T00:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T10:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">0</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>operation failed</witsml:stateDetailActivity>
<witsml:comments>Wait on GeoPilot BHA on Far Server ETA 09:00 Meanwhile change powerloop on eagle, perform PM on drawwork and Torquewinder. Perform anticollision test.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T10:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T12:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">0</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>Receive Geopilot BHA. Prepare same on deck.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T12:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T12:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">0</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>Hold pre job meeting prior to p/u new BHA.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T12:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T14:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">0</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>P/u Geopilot and MWD. Contra order from town. Plan for cmt back open hole and plan new kick off. L/d Geopilot and MWD. Order 3 1/2" DP cmt stinger from ELDA.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T14:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T17:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">0</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>Wait on cmt stinger from ELDA, meanwhile clean rig floor. Prepare handling equipment for 3 1/2" DP. Rig maintenance.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T17:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-26T19:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">144.78</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>P/u 15 jnts 3 1/2" dp cmt stinger and rih to 475 ft.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-09-26T19:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-09-27T00:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">2250.948</witsml:md>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>fail</witsml:state>
<witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
<witsml:comments>Continue rih on 5" dp from 475 - 7385 ft.</witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-11T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-12T08:10:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-11T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Circulate and condition hole at 5699m. Step up flow rate to 1130 lpm. Increase RPM to 120. Increase mud weight to 1,35 sg MW and lubricate out of hole to 9-5/8" casing shoe. Flow check and pull out of hole with 8-1/2" drilling BHA</witsml:sum24Hr>
<witsml:forecast24Hr>Continue to pull out of hole with 8-1/2" drilling BHA. L/D 4-1/2" DP while POOH with BHA.</witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:bitRecord>
<witsml:numBit>b6</witsml:numBit>
<witsml:diaBit uom="in">8.50000015393957</witsml:diaBit>
<witsml:manufacturer>Hughes-Christensen</witsml:manufacturer>
<witsml:codeMfg>HCM 607</witsml:codeMfg>
</witsml:bitRecord>
<witsml:fluid>
<witsml:type>Oil Based</witsml:type>
<witsml:dTim>2011-04-11T08:30:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presBopRating uom="bar">344.7378515625</witsml:presBopRating>
<witsml:mudClass>oil based</witsml:mudClass>
<witsml:density uom="g/cm3">1.3</witsml:density>
<witsml:pv uom="mPa.s">16</witsml:pv>
<witsml:yp uom="Pa">6.224434</witsml:yp>
</witsml:fluid>
<witsml:fluid>
<witsml:type>Oil Based</witsml:type>
<witsml:dTim>2011-04-11T16:45:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presBopRating uom="bar">344.7378515625</witsml:presBopRating>
<witsml:mudClass>oil based</witsml:mudClass>
<witsml:density uom="g/cm3">1.31</witsml:density>
<witsml:pv uom="mPa.s">16</witsml:pv>
<witsml:yp uom="Pa">5.745631</witsml:yp>
</witsml:fluid>
<witsml:fluid>
<witsml:type>Oil Based</witsml:type>
<witsml:dTim>2011-04-11T23:45:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presBopRating uom="bar">344.7378515625</witsml:presBopRating>
<witsml:mudClass>oil based</witsml:mudClass>
<witsml:density uom="g/cm3">1.35</witsml:density>
<witsml:pv uom="mPa.s">15</witsml:pv>
<witsml:yp uom="Pa">6.703236</witsml:yp>
</witsml:fluid>
<witsml:activity>
<witsml:dTimStart>2011-04-11T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-11T10:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Continue to step up pump rate slowly from 900 lpm, 48 bar to 1200 lpm, 97 bar. Hole attempting to pack off at 1200 lpm. Reduce rate to 1130 lpm, 88 bar, 42 RPM, 16-24 kNm. Circulate and condition hole with 1130 lpm. Losses 1,5m3/hr to 3m3/hr
Cuttings Weight
0600hrs - 1,1kg/min
0700hrs - 1,8kg/min
0800hrs - 2,0kg/min
0900hrs - 1,5kg/min
1000hrs - 1,5kg/min</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-11T10:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-11T13:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Continue circulating at 1130 lpm, 85-88 bar. Step up pipe rotation to 120 RPM, 18-23 kNm. No indication of hole packing off with increased rotation. Losses 2-3 m3/hr
Cuttings weight:
1100hrs - 2,2kg/min
1200hrs - 1,5kg/min
1300hrs - 2,5kg/min
1330hrs - 4,0kg/min</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-11T13:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T01:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Increased mud weight from 1,30sg to 1,35 sg while circulating and conditioning hole section at 5699m. 1130 lpm, 88 bar, 120 RPM, 18-23 kNm. Loss rate increased from 2-3m3/hr to 4-6m3/hr while raising mud weight to 1,35sg. Continue circulating till 1,35 sg mud in and out.
cuttings weight:
1400hrs - 3,5kg/min 2000hrs - 1,6kg/min
1500hrs - 2,5kg/min 2100hrs - 1,2kg/min
1600hrs - 2,0kg/min 2200hrs - 1,7kg/min
1700hrs - 2,5kg/min 2300hrs - 1,5kg/min
1800hrs - 2,7kg/min 0000hrs - 1,5kg/min
1900hrs - 1,2kg/min 0100hrs - 1,3kg/min
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T01:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T02:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Flow check prior to lubricating out of hole. Grease wash pipe and check oil on top drive while checking flow.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T02:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T05:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- ream</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Attempt to POOH without rotation. Pulled 150 ton while attempting to POOH. Slack off to neutral and begin rotating with 15-20 RPM. Lubricate out of hole with slow rotation from 5699m to 5605mm. Pump 50-90 lpm, 10-15 bar. Hookload 105-111 tons while pumping out of hole. Lost returns when top stab entered sand zone. Continue working string through zone. Increase to 27 RPM while working pipe. Regained returns 5584m when bit exited sand zone. Continue to lubricate BHA out of hole into 9-5/8" casing shoe at 5534m. :)</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T05:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Flow check with BHA inside 9-5/8" casing shoe. Prepare to POOH with 8-1/2" drilling BHA on 5-1/2" DP</witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-12T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-13T07:00:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-12T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Pump out of hole with 8-1/2" drilling BHA in 9-5/8" casing till good returns observed. Pump slug and POOH with BHA on 5-1/2" DP. Continue to POOH with BHA on 4-1/2" DP. L/D 4-1/2" DP while POOH.</witsml:sum24Hr>
<witsml:forecast24Hr>L/D 8-1/2" drilling BHA. Test BOPs. P/U and M/U clean out BHA and RIH with same.</witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-12T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T12:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Hole not taking fluid on backside while pulling. Pump 8-1/2" drilling BHA out of hole in 9-5/8" casing f/ 5519m to 4855m. Pump 87 lpm, 10-13 bar. Hold trip drill with crew while POOH. Continue POOH on elevators from 4855m to 4513m.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T12:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T16:15:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Pump slug and POOH with 8-1/2" drilling BHA on 5-1/2" DP from 4513m to 3081m.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T16:15:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T17:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Redress elevators and slips to 4-1/2". Rearrange tubulars in derrick to allow extra 15 stands of 4-1/2" DP to be racked back. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T17:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-12T20:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with 8-1/2" drilling BHA on 4-1/2" DP from 3081m to 1350m. Rack back 4-1/2" DP in derrick.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-12T20:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>L/D 4-1/2" DP while POOH with 8-1/2" drilling BHA from 1350m to 441m. Hold trip drill with crew while POOH.</witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-13T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-14T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-14T07:06:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-13T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Completed POOH and laying down 8-1/2" BHA. Tested BOP on 4-1/2" and 5-1/2" DP. </witsml:sum24Hr>
<witsml:forecast24Hr>Complete testing BOP on 4-1/2" DP. M/U and RIH 8-1/2" clean out assembly while testing choke/kill offline. </witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-13T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T09:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>L/D 4-1/2" DP while POOH with 8-1/2" drilling BHA from 441m to 181m (L/D 77 jts to deck). </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T09:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T09:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Flow check before laying out BHA - 350 l/hr losses.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T09:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T15:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>B/O and L/D 8-1/2" BHA (removed radioactive sources and dumped MWD memory while tool in rotary).
Bit grade: 1 - 1 -WT - G - X - CT -TD</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T15:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T16:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Held PJSM. Clean and clear rig floor for upcoming operations. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T16:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T18:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- bop activities</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>M/U wear bushing running tool and pull wear bushing from well head. POOH and L/D wear bushing and running tool. M/U choke/kill lines to pump in sub. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T18:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T19:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>M/U bull nose. RIH and displaced riser to sea water. Washed wellhead and BOP area. POOH and B/O bull nose. Drain riser and wellhead. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T19:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-13T21:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- bop activities</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Held PJSM. M/U and RIH BOP test plug assembly (6-8 ton set down wt). R/U hose, chiksan and low torque. Flush lines from cement unit with s/w. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-13T21:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-14T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- bop activities</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Pressured test lines to 20/150 BAR for 5/10 min - good test. Tested BOP rams and annular against 5-1/2" DP to 20/150 BAR for 5/10 mins - good test on rams. Unable to hold pressure on annular with 1500 PSI. Raised closing pressure to 1800 PSI and observed a good test. Test with 1500 PSI closing pressure - unable to get seal.
Tested shear ram 20/150 BAR for 5/10 mins - good test.
Commenced testing BOP rams and annular against 4-1/2" DP to 20/150 BAR for 5/10 mins - good test. </witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-14T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-15T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-15T07:00:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-14T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Completed testing BOP on 4-1/2" and 5-1/2" DP. M/U and staged in hole 8-1/2" clean out assembly to 541m.</witsml:sum24Hr>
<witsml:forecast24Hr>Circulate bottoms up and take parameters at shoe depth 5534m. RIH to TD and commence circulating and conditioning mud. </witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-14T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-14T14:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- bop activities</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Completed testing BOP rams and annular against 4-1/2" DP to 20/150 BAR for 5/10 mins - good test.
Pressure tested rams and annular againts 5-1/2" and 4-1/2" DP to 15 / 241 BAR for 5 / 10 mins - good test. Tested shear ram to 15 / 241 BAR for 5 / 10 mins - good test.
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-14T14:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-14T15:15:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>NOV checked gripper head on HR main arm. Performed visual inspection. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-14T15:15:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-14T18:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- bop activities</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with test plug and L/D test string. M/U and set wear bushing in wellhead profile. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-14T18:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-14T21:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Held PJSM. P/U 6-3/4" NMSDP from deck and B/O lifting sub. L/O NMSDP to deck. B/O xo from 6-1/2" DC std in derrick. B/O and L/D 2x singles to deck. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-14T21:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-15T00:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>M/U 8-1/2" clean out assembly to 150 m.
Bit: SN PM6542, Non Jetted (TFA 2.413 in^2)
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-15T00:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-15T01:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Removed masterbushings and installed PS21. Greased and functioned tested PS21.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-15T01:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-15T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Staged in hole with 8-1/2" clean out assembly from 150m to 541m while P/U 4-1/2" DP from deck (break circulation every 500m and take TQ/Wt parameters).
Trip Drill: 40 secs at 446m.</witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-18T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-19T07:07:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-18T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Lubricated out hole from 5919m to 5530m while working through tight spots. Circulated 2 bottoms up at shoe depth 5534m while adding 1% Ultralube 2 and monitoring torque readings. Commenced RIH from 5530m to 5641m.</witsml:sum24Hr>
<witsml:forecast24Hr>Complete short trip to 5800m. Lubricate out of hole to casing. POOH 8-1/2" clean out assembly and pick up scraper run BHA.</witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-18T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-18T18:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Lubricated out of hole from 5919m to 5530m with 90 LPM / 17 BAR, 3 RPM / 22 kNM TQ (5534m csg shoe).
Worked through tight intervals from 5961m - 5927m and 5820m - 5534m (predominantly sand intervals) with 0 - 90 LPM / 17 BAR, 90 - 100 RPM / 26 kNm TQ. Slide through shale sections with 55 ton S/O wt. Rotate down sand intervals with 3 RPM /26 kNM TQ after working section.
Depth S/O Wt
---------- ------------
5800 58
5600 101
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-18T18:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T05:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Staged pumps up to 1200 LPM / 85 BAR. Commenced circulating bottoms up while adding 1% Ultralube 2 (3 m3 total) at 1100 LPM / 75 BAR, 38 RPM / 26 kNm TQ (2.3 m3/hr losses). Observed fines at shakers and no gas at bottoms up. Pumped 13.9k strokes total.
Rhyeology:
Before Ultralube 2 - 6 RPM / 11, 3 RPM / 10.
After Ultralube 2 - 6 RPM / 6, 3 RPM / 6.
P/U Wt S/O Wt TQ RPM Flow
------------ ------------ ----- -------- ------------
No Ultralube 2 146 65 N/A N/A 0 LPM
No Ultralube 2 143 68 24-32 38 600 LPM
Ultralube 2 128 76 N/A N/A 0 LPM
Ultralube 2 123 75 23-27 38 600 LPM
24 hr losses: 115 m3</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T05:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>RIH 8-1/2" clean out assembly from 5530m to 5641m with 3 RPM / 14 kNm TQ, 0 LPM to simulate screen running. </witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-19T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-20T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-20T06:56:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-19T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Observed no obstructions while RIH with 3 RPM to 5800m to simulate screen running. Lubricated out of hole with 3 RPM / 90 LPM to shoe at 5534m with no overpulls or packoffs. Pumped slug. POOH to 995m (L/O 4-1/2" DP to deck).</witsml:sum24Hr>
<witsml:forecast24Hr>L/D 8-1/2" clean out assembly. P/U and RIH 9-5/8" scraper assembly. </witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-19T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T08:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>RIH 8-1/2" clean out assembly from 5641m to 5800 with 3 RPM / 14 kNm TQ, 0 LPM to simulate screen running. Observed no problems passing tight spots encountered on trip out. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T08:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T11:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Lubricated out of hole from 5800m to shoe depth 5534m with 90 LPM / 9 BAR, 3 RPM / 16 kNm. Observed no overpull or packoffs. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T11:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T11:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Flowcheck well - static. Pumped slug.
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T11:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T16:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH 8-1/2" clean out assembly from 5534m to 4119m while taking torque/drag readings every 300m for completion data collection.
Depth P/U Wt S/O Wt TQ RPM
---------- ------------ ------------ ----- --------
4500 140 68 17 - 25 40
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T16:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T18:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Prepared PTW. Replaced encoder for spinnertong elevation at Hydratong. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T18:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-20T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH 8-1/2" clean out assembly from 4119m to 995m while taking torque/drag readings every 300m for completion data collection. L/D 4-1/2" DP to deck while POOH (77 jts total to L/O).
Depth P/U Wt S/O Wt TQ RPM
---------- ------------ ------------ ----- --------
4200 130 68 17 - 24 40
3900 121 68 17 - 22 40
3600 118 65 15 - 21 40
3300 106 64 13 - 18 40
3000 99 64 11 - 16 40
2500 97 67 9 - 13 40
2000 82 66 6 - 10 40
1500 71 62 4 - 6 40</witsml:comments>
</witsml:activity>
<witsml:equipFailureInfo>
<witsml:dTim>2011-04-19T16:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:equipClass>drill floor -- other</witsml:equipClass>
<witsml:eTimMissProduction uom="min">120</witsml:eTimMissProduction>
<witsml:dTimRepair>2011-04-19T18:00:00.001Z</witsml:dTimRepair>
<witsml:description>Prepared PTW. Replaced encoder for spinnertong elevation at Hydratong. </witsml:description>
</witsml:equipFailureInfo>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-26T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-27T08:34:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-26T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Worked tight hole at 6071 - 6078 m MD. Unable to free 6-5/8" lower completion assembly. Set lower completion packer at 4554 m MD and pressure tested same. Bull nose at 6076 m MD. Released packer running tool and tripped out of hole to 3712 m MD at report time (06:00 hours).</witsml:sum24Hr>
<witsml:forecast24Hr>POOH and lay down HWDP with rollers while offloading upper completion tubing string. Test BOPs. RIH with cleanout assembly BHA. </witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-26T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T06:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Worked tight hole at 6071 m MD - 6078 m MD up/down. Up wt: 300 tons, down wt: 45 tons. Attempted to pull with 310 tons up weight, no go. Tried down weight of 35 tons, no go. Stuck at 6076 m MD. Continued to work string in attempt to free stuck assembly. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T06:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T08:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Made up top drive. Put 7 kNm torque in string and continued to work string to free stuck assembly for 1 hour, no go. Removed torque from string. Backed out top drive and continued to work area, no go. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T08:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T09:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Made up top drive, began to circulate with 135 lpm at 6076 m MD. Work string in tight hole. Broke out top drive and prepared to set packer. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T09:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T11:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Conducted pre-job meeting with Halliburton Cementers concerning dropping/chasing ball to set packer. Prepared/lined up for pressure test. Test lines from Halliburton cement unit to drill floor to 20 bar for 5 minutes and 280 bar for 10 minutes, good tests. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T11:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T15:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Waiting on decision from town to drop ball and set packer. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T15:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T21:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Conduct pre job meeting with crew prior to dropping/chasing ball. Dropped 1 5/8" setting ball and made up top drive. Waited for ball to drop. Put 10 bars pressure on IBOP to verify correct line up prior to chasing ball. Circulate with cement pump to chase ball and set 6 5/8" lower completion packer as per Schlumberger. Packer depth: 4554 m MD. Bull nose at 6076 m MD.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T21:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T22:15:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Pressure tested packer against annular preventer to 207 bar for 10 minutes, okay. Pumped 1500 liters, bled back 1430 liters. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T22:15:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-26T23:15:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Released running tool: Picked up 5 tons above up weight, slacked off to neutral position, and set down 5 tons below down weight. Set down 5 tons below neutral position and applied 166 bar pressure, held for 5 minutes to release. Released pressure and picked up to verify the release of running tool, okay. With service tool free (5 m above Quantum packer), sheared the ball seat (300 liters, 270 bar). </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-26T23:15:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Performed flow check prior to tripping, okay. POOH with running string from 4549 m MD to 3712 m MD.</witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-27T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-28T07:39:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-27T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Tripped out of hole with lower completion running string from 3712 m MD to 1000 m MD at report time (06:00 hrs) while laying down HWDP on pipe deck. </witsml:sum24Hr>
<witsml:forecast24Hr>Continue POOH and lay down HWDP while offloading upper completion tubing string. Test BOPs. RIH with cleanout assembly BHA. </witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-27T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T10:15:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 3712 m MD to 2980 m MD. Pumped slug prior to laying down 5 1/2" HWDP to pipe deck. Pump 400 lpm, 30 bar. Lay down range 3 HWDP while POOH with lower completion running string. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T10:15:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T11:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Rearrange HWDP on pipe deck before continuing trip out of hole. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T11:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T13:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 2980 m MD to 2580 m MD. Lay down range 3 HWDP while POOH with lower completion running string. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T13:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T14:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Rearrange HWDP on pipe deck before continuing trip out of hole. Greased block and dolly on top drive unit simultaneously. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T14:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T17:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 2580 m MD to 2136 m MD. Lay down range 3 HWDP and range 2 HWDP while POOH with lower completion running string. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T17:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T18:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Rearrange HWDP on pipe deck before continuing trip out of hole. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T18:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T21:15:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 2136 m MD to 1788 m MD. Lay down range 2 HWDP while POOH with lower completion running string. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T21:15:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-27T23:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Deck crew offloaded NSP route boat Strilmøy. Simultaneously redressed slips from 6 5/8" to 5 1/2" and performed general rig maintenance. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-27T23:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 1788 m MD to 1000 m MD. Lay down range 2 HWDP while POOH with lower completion running string. </witsml:comments>
</witsml:activity>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-28T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-29T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-29T08:10:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-28T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Tripped out of hole with running tool from 1000 m MD to surface while laying down HWDP on pipe deck. Laid down Quantum packer running tool. Washed / jetted BOP and wellhead. Tested BOPs. </witsml:sum24Hr>
<witsml:forecast24Hr>PU and RIH with cleanout assembly BHA. RIH with casing cleanout assembly to 5 m above Quantum packer.</witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-28T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T09:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 1000 m MD to 737 m MD. Lay down range 2 HWDP while POOH with lower completion running string, stopping periodically to rearrange HWDP on Pipe Deck. Performed successful kick drill, duration: 55 seconds. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-28T09:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T09:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>BDOS common alarm went off 2 times within 1 hour. Electrician reset alarm, work continued.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-28T09:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T18:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with lower completion running string from 737 m MD to 128 m MD. Lay down range 2 HWDP while POOH with lower completion running string, stopping periodically to rearrange HWDP on Pipe Deck. Changed teflon on gripper activator for knuckle boom crane on Pipe Deck. Removed remote operated slips. Installed hydraulic operated Weatherford slips with integrated safety clamp (less than 10 tons on string). Continued to POOH with running tool from 128 m MD to surface. Break out and lay down Quantum packer running tool. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-28T18:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T20:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Clean and clear rig floor. Make up wear bushing running tool and RIH. Retrieved wear bushing. POOH and lay down running tool and bushing. Make up and RIH with wash/jet assembly. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-28T20:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T20:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Washed/jetted well head and BOP area. Pumped 1800 lpm, 14 bar. Rotated 10 rpm. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-28T20:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-28T20:45:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>POOH with wash/jet assembly. Lay down same.</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-28T20:45:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-29T04:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Made up BOP test plug. Changed seal. Drained riser. RIH with test plug assembly. Performed line test to 15 bar for 5 minutes and 241 bar for 10 minutes, good test. Tested lower pipe rams and upper pipe rams (with 5 1/2" DP) to 15 bar for 5 minutes and 241 bar for 10 minutes, good test. Test annular to 15 bar for 5 minutes and 241 bar for 10 minutes, good test. Test shear rams, good test. POOH and lay down test plug assembly. </witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-29T04:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-29T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>completion -- completion string</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Pick up and RIH with wear bushing, set same. Lay down running tool. Clean and clear rig floor. Prepare to pick up / make up casing cleanout assembly.</witsml:comments>
</witsml:activity>
<witsml:equipFailureInfo>
<witsml:dTim>2011-04-28T09:30:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:equipClass>drill floor -- draw works</witsml:equipClass>
<witsml:eTimMissProduction uom="min">15</witsml:eTimMissProduction>
<witsml:dTimRepair>2011-04-28T09:45:00.001Z</witsml:dTimRepair>
<witsml:description>BDOS common alarm went off 2 times within 1 hour. Electrician reset alarm, work continued.</witsml:description>
</witsml:equipFailureInfo>
</witsml:drillReport>
</witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 25/11-G-12 Y2</witsml:nameWell><witsml:nameWellbore>NO 25/11-G-12 Y2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-04T13:27:33.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>25/11-G-12 Y2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>25/11-G-12 Y2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5380</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2006-10-22T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2006-11-03</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>GRANE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>283285</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">3143.6</witsml:mdKickoff><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3243</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">69.9</witsml:elevKelly><witsml:sum24Hr>Lifted riser and replaced WL hatch with permanent hatch. Leak tested xmas tree cap. Removed chicksan and leak tested KW cap. Prepared to demobilize personnel and equipment. ***END OF OPERATION***</witsml:sum24Hr><witsml:forecast24Hr>No projected operations.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued attempting to achieve good test on cap on riser. Discussed situation with crew/control room. Achieved good leak test on riser cap after pressuring up in x-mas tree cross and bleding quickly before leak testing riser/riser cap. Opened HMV. WHP 14 bar. Closed DHSV and bled down pressure above to 0 bar. Closed HMV and bled down pressure in xmas tree cross/riser. Drained riser/x-mas tree cross to closed drain. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held A-standard/pre-job meeting on heavy lift on hatch deck with involved personnel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed heavy lift: lifted riser and LD riser on hatch deck, and changed from WL hatch to permanent hatch.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Leak tested top cap on x-mas tree to 20/260 bar for 5/10 min. Meanwhile continued packing equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Disconnected winch/unit electrically and from F&amp;G. Packed equipment. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Disassembled chicksan lines and leak tested KWV-cap to 20/260 bar for 5/10 min. OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Packed equipment and cleaned hatch deck and WH. Handed well over to production. ***END OF OPERATION***</witsml:comments></witsml:activity>
<witsml:equipFailureInfo><witsml:dTim>2011-09-26T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2</witsml:md><witsml:equipClass>service equ -- other</witsml:equipClass><witsml:eTimMissProduction uom="min">350.4</witsml:eTimMissProduction><witsml:dTimRepair>2011-09-26T08:10:00.000Z</witsml:dTimRepair><witsml:description>I forbindelse med kjøring av en drift i G-12 på wireline stoppet wireline verktøystrengen etter bare 2 meter under korneventilen. EN arm som skal inn i GLV var blitt aktivert under installering i sluserøret eller under kjøring av verktøystrengen. Dette med</witsml:description></witsml:equipFailureInfo>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 30/9-B-45</witsml:nameWell><witsml:nameWellbore>NO 30/9-B-45</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:55:33.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>30/9-B-45</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>30/9-B-45</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4513</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2002-03-20T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>OSEBERG B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>272897</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">8225</witsml:md><witsml:tvd uom="m">2716.3</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">918</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">167</witsml:mdKickoff><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">58</witsml:elevKelly><witsml:sum24Hr>Intervention crew arrived platform.
Started to spot and check out wireline equipmen at BOP deck.</witsml:sum24Hr><witsml:forecast24Hr>Continue RU on BOP deck. Hook up equipment to platform power, F&amp;G etc.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Rig crane still down due to heavy wind.
Continued spotting and hooking up equipment on BOP deck. </witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Started to check out the arrived wireline equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rig crane down due to heavy wind.
Spotted equipment on BOP deck. Started to hook up cables and hoses between wl-winch and add-on unit.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 30/9-F-7 A</witsml:nameWell><witsml:nameWellbore>NO 30/9-F-7 AT2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:56:05.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>30/9-F-7 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>30/9-F-7 AT2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6628</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2011-09-24T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>KCA Deutag Drilling Norge AS</witsml:drillContractor><witsml:rigAlias><witsml:name>OSEBERG SØR</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280205</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">1603</witsml:md><witsml:tvd uom="m">1371.64</witsml:tvd><witsml:diaHole uom="in">17.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">1204</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">0</witsml:strengthForm><witsml:mdStrengthForm uom="m">0</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">14</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2593.44</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2080.1</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">0</witsml:distDrill><witsml:elevKelly uom="m">67.2</witsml:elevKelly><witsml:sum24Hr>POOH with 16&quot; x 17 1/2&quot; geopilot and XR reamer BHA on 6 5/8&quot; DP from 1195 m to surface. R/B same in derrick. N/D and repaired leak in annular preventer.</witsml:sum24Hr><witsml:forecast24Hr>Repair leak in annular preventer. N/U. Perform BOP test. M/U and RIH with 16&quot; x 17 1/2&quot; BHA. (status at 06:00 dependent on progress of annular repair)</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>Versatec</witsml:type><witsml:dTim>2011-10-03T16:00:00.000Z</witsml:dTim><witsml:md uom="m">1603</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.36</witsml:density><witsml:pv uom="mPa.s">33</witsml:pv><witsml:yp uom="Pa">12</witsml:yp></witsml:fluid>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Dimanteled annular preventer to inspect/replace seals on outer cylinder. Depth: 0. Unable to retrieve outer cylinder from annular preventer with 2 tonn. Discussed further action with Cameron onshore duty. Waited for Cameron representative to get required rest to discuss further action. Meanwhile cleaned area around BOP and drill floor for further operation.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1175</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Flow checked well. Pumped 5 m3 with 1,64 sg slug.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>POOH with 16&quot; x 17 1/2&quot; geopilot and XR reamer BHA on 6 5/8&quot; DP from 1195 m to 135 m . Avg. tripping speed 850 m/hr. Avg. slips to slips time 1,1 min. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">135</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting prior to B/O and racking BHA. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">25</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>B/O and racked back 16&quot; x 17 1/2&quot; Geopilot and XR reamer BHA</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">25</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Downloaded memory data from MWD.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>B/O and racked back 16&quot; x 17 1/2&quot; Geopilot and XR reamer BHA</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Prepared for repairing annular preventer. Removed PS-30, diverter, mandrel etc.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting with new crew prior to N/D diverter and mandrel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>N/D diverter and mandrel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Cleaned annular preventer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting prior to repairing annular preventer. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Repaired annular preventer. Removed top on annular preventer. Replaced seals. No visible damage on seals. Inspected annular element. No excessive damage to packer element. Dimanteled annular preventer to inspect/replace seals on outer cylinder.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 31/2-D-2 AY3H</witsml:nameWell><witsml:nameWellbore>NO 31/2-D-2 AY3H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:56:31.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>31/2-D-2 AY3H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>31/2-D-2 AY3H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6621</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>North Atlantic Drilling Limited </witsml:drillContractor><witsml:rigAlias><witsml:name>WEST VENTURE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>297055</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">1925</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.4</witsml:strengthForm><witsml:mdStrengthForm uom="m">1566</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">1482.2</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">1934.5</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1603.5</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">35.5</witsml:elevKelly><witsml:sum24Hr>Inflow tested DHSV.
Installed tubing hanger debris plug.
Disconnected and pulled THROT.
Prepared for pulling BOP.</witsml:sum24Hr><witsml:forecast24Hr>Waiting for a suitable weather window for pulling of BOP</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>NaCl Solids Free</witsml:type><witsml:dTim>2011-10-03T15:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">1034</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.12</witsml:density><witsml:pv uom="mPa.s">13</witsml:pv><witsml:yp uom="Pa">7.5</witsml:yp></witsml:fluid>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. further operations stopped as weather is too rough for pulling of BOP .
Estimated weather window for pulling of BOP is Oct. 5, afternoon and onwards.
Weather/ rig movements at 0600hrs :19 m/s, max waves 8,7 m, pitch 5,5 deg, roll 4,8 deg, heave 2,9 m
</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">1925</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Inflow tested DHSV as follows: Pressured up string to 125 bar against both HCM-A&apos;s and GLV. Closed DHSV and bled off pressure above to 55 bar and monitored 1/2 hr for pressure build-up. Bled further to 5 bar and monitored 10 min for pressure build-up. Equalized pressure across DHSV w 125 bar and opened DHSV, then bled off pressure to zero. Confirmed total volume pumped in equalling total volume bled off. Closed DHSV. Final status : Both HCM-A&apos;s and GLV closed</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1925</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged up wireline equipment and toolstring with 4.688&quot; R-line plug</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">371.2</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Set 4,688&quot; debris plug in wellhead nipple profile.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">371.2</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>completion -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with wireline toolstring and rigged down.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">371.2</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Retracted THROT indicator pin and unlatched THROT. Disconnected THROT and pulled above BOP.
Broke out XO-block and laid out same in chute and dismantled working platform and 2&quot; hose. Removed 16&quot; elevator and the extra long bails and installed 500 t drilling bails and elevator. Laid out lo-torque manifold and hoses prior to tripping.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out with THROT and laid out same</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cleaned and tidied rig floor. Doped pipe and removed Weatherford tong from drill floor</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>plug abandon -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Changed to 450 t elevator, checked saver sub and removed rotary table. Installed spider.
Meanwhile displaced riser to sea water, kill/choke lines to drill water through boost line.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Stopped further operations as weather window for pulling of BOP was not available on forecast. Estimated weather window for pulling of BOP is Oct. 5, afternoon and onwards.
Weather at 2400hrs : 20 m/s, max waves 6,7 m, pitch 4deg, roll 4 deg, heave 1,8
Meanwhile performed bi-weekly pressure testing of choke manifold.
</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-A-37 C</witsml:nameWell><witsml:nameWellbore>NO 33/9-A-37 C</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T07:59:10.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>33/9-A-37 C</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>33/9-A-37 C</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6610</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2011-06-01T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Archer</witsml:drillContractor><witsml:rigAlias><witsml:name>STATFJORD A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271273</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2497</witsml:md><witsml:tvd uom="m">2472.5</witsml:tvd><witsml:diaHole uom="in">8.5</witsml:diaHole><witsml:mdDiaHoleStart uom="m">2465</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.62</witsml:strengthForm><witsml:mdStrengthForm uom="m">2463</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2440</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">2463.5</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">64.5</witsml:elevKelly><witsml:sum24Hr>Waited for additional premix to arrive on location. Offloaded boat and started to mix new 1,23 sg WARP mud. Pulled out of hole to 1999 m. Draw-work disc brake failure caused elevator to land on rotary, setting down 20 tons. Troubleshot failed brake and loss of power to draw-works electric motors. Well was observed on trip tank while troubleshooting.</witsml:sum24Hr><witsml:forecast24Hr>Continue to troubleshoot and rectify fault in draw-work brake system. Continue to pull out of hole to 800 m and commence displacing well to 1,23 sg WARP mud in stages.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:bitRecord><witsml:numBit>7</witsml:numBit><witsml:diaBit uom="in">8.5</witsml:diaBit><witsml:manufacturer>Security DBS</witsml:manufacturer><witsml:codeMfg>FMR3753Z</witsml:codeMfg></witsml:bitRecord>
<witsml:fluid><witsml:type>WARP (Oil Based)</witsml:type><witsml:dTim>2011-10-03T20:00:00.000Z</witsml:dTim><witsml:md uom="m">2497</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>oil based</witsml:mudClass><witsml:density uom="g/cm3">1.23</witsml:density><witsml:pv uom="mPa.s">14</witsml:pv><witsml:yp uom="Pa">2</witsml:yp></witsml:fluid>
<witsml:porePressure><witsml:readingKind>estimated</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">.98</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2497</witsml:md></witsml:porePressure>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 1999. Continued troubleshooting fault in draw-work control system. Observed well on trip tank. </witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">2444</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for additional amount of premix required for reduction of mudweight to arrive.
Continued to observe well and reciprocate drill string at intervalls to ensure free movement.
Performed planned maintenance while waiting.
</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">2444</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for additional amount of premix required for reduction of mudweight to arrive.
Offloaded boat and started to mix new WARP mud with 1,23 sg.
Continued to observe well and reciprocate drill string at intervalls to ensure free movement.
Performed planned maintenance while waiting.
</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1999</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Pulled out of hole from 2444 m to 1999 m (average pulling speed: 356 m/hr).
Operation stopped due to draw-work brake failure.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">1999</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Draw-work power and brake failure.
Upon coming down with an empty block the draw-works parking brake failed to engage, simultaneously as the electric motors for the draw-work tripped out. This caused the traveling block to slide down until elevator landed on top of slips in rotary table setting down 20 tons on bails/elevator.
Immediately started to troubleshoot fault in draw-work control system. Observed well on trip tank. </witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-E-1 H</witsml:nameWell><witsml:nameWellbore>NO 33/9-E-1 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:00:02.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>33/9-E-1 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>33/9-E-1 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>2417</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>1996-03-13T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>DeepOcean</witsml:drillContractor><witsml:rigAlias><witsml:name>EDDA FAUNA</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>403711</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3322.2</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">2</witsml:elevKelly><witsml:sum24Hr>None</witsml:sum24Hr><witsml:forecast24Hr>None</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 265. Continued mobilizing equipment for Statfjord Nord E-1 H, E-4 H and Vigdis G-1 H.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">262</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Started mobilising equipment for well Statfjord E-1 H, E-4 H and Vigdis G-1 H.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 33/9-M-3 H</witsml:nameWell><witsml:nameWellbore>NO 33/9-M-3 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:00:24.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>33/9-M-3 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>33/9-M-3 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4445</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dateDrillComplete>2002-01-14</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Island Offshore Management</witsml:drillContractor><witsml:rigAlias><witsml:name>ISLAND FRONTIER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>373829</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">222</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4512.5</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2536</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">3</witsml:elevKelly><witsml:sum24Hr>Transit to shore, with stop at Fedjeosen for lubrication of ROV umbilical¿s. Moored alongside RO-RO quay at CCB. Demobilized Statfjord Øst M-3H equipment.</witsml:sum24Hr><witsml:forecast24Hr>Complete demobilizing Statfjord Øst M-3H equipment.
Status 06:00 No operation
</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. </witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Retrieved TCRT to surface. Released &amp; retrieved GW#3. Landed TCRT on skid and disconnected LS reel.Skid out TCRT and sea fastened same.
Meanwhile:
ROV closed ROV basket .
</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Deployed GW#3 connect ROV hook on transponders and retrieved to surface. Deployed GW # 3 connect ROV hook on ROV basked and retrieved to surface.Performed valve status check. Opened 3-C Annulus manifold valve 90º CCW.
</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T05:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Deployed GW #3 w/forerunner for close hatchers. Closed hatches. Retrieved GW #3.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T05:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed as left survey. Opened MC 31 with 35 turn CCW and 237 NM. Retrieved Magnum ROV.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T14:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- transit</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Transit to shore, with stop at Fedjeosen for lubrication of ROV umbilicals. ETA 19:00 CCB. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T14:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- transit</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Deployed both ROV&apos;s and lubricated the umbilicals.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>moving -- transit</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued transit to shore, ETA 19:00 CCB. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Moored alongside RO-RO quay at CCB. Skid stack into MTH. Split stack and skid out connector.
Cut off sea fasting on deck.
Backloaded:
AWS / Halliburton Explosive cont.
Welltec 8m basked
2 ea AWS 7/16 logging cont.
Halliburton 8m basked.
Baker oil tool basked.
Halliburton 8 ft container.
Connector.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-A-35</witsml:nameWell><witsml:nameWellbore>NO 34/10-A-35</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:03:18.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/10-A-35</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/10-A-35</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>1876</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>1992-01-27T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Halliburton</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271833</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:diaCsgLast uom="in">5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3017</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">85</witsml:elevKelly><witsml:sum24Hr>Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:sum24Hr><witsml:forecast24Hr> Waiting for chemicals to arrive from shore. </witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for boat to return to platform with fourth batch of silicate solution. Boat waiting to load on Batch#4 due to bad weather.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-A-40</witsml:nameWell><witsml:nameWellbore>NO 34/10-A-40</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:03:40.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/10-A-40</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/10-A-40</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>2070</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>1993-04-30T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Solution Services</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271833</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">547</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4949</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">1860</witsml:tvdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">82</witsml:elevKelly><witsml:sum24Hr>Waited for logging operation in well A-10. RIH with BHA# 1 Tractor and RST to 475 m. WL cabin and grease Skid shutt down. POOH fom 475 m. Statoil fire &amp; gas tested and solved system for EL. WL equipment.</witsml:sum24Hr><witsml:forecast24Hr>RIH with BHA# 1 Tractor and RST. Log RST - D in Brent: 4340 - 3840 m and in Cook: 3720 - 3380 m. </witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Equalized and opened HMV. Tested tractor and RST tool. Opened SV. WHP 92 bar. Depth: 2235. Ran in hole by gravity at 30 m/min lost weight at 2235 m. PU 50 m every 400 m (AWS procedure for new cable) Depth: 4280. Activated tractor and RIH from 2235 m to 4000 m 06:00. PU 50 m every 400 m (AWS procedure for new cable). Had to make 3 attempts to pass through straddle at 3548,5 m.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer. Meanwhile held A - standard / pre-job meeting with involved personnel on night shift.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed A - standard / pre-job meeting with involved personnel on day shift.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for logging operation in well A-10 to be completed. Common Slb acquisition computer.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed communication checks on logging tools. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Leaktested lubricator to 20/345 bar for 5/10 min with 100 % MEG. Opened HMV. WHP 93,8 bar. Pumped 50 ltr 100% MEG to equalize DHSV. Pumped 4 m3 of base oil. Openes swab. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Ran in hole by gravity at 30 m/min to 475 m. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:35:00.000Z</witsml:dTimEnd><witsml:md uom="m">475</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Winch cabin and unit for grease supply shut down. Loosed electric power due to gas alarm in D-21. AWS contacted SKR. Pressured up stuffing box to keep well control.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Gas alarm in D-21 cleared out. Electric power turned on. POOH from 475 m to surface. Closed SV and HMV.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Evaluated situation. Discussed situation w/ Statoil fire &amp; gas prod dep. and electrician for sorting out why override of ignitionsource disconnection system failed.
</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Statoil fire &amp; gas tested system for electric WL equipment. Solved the reason for cabin and grease loosed electric power shut down .Override of ignitionsource disconnection system for WL cabin was not activated on switchboard 17 - EN01.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/10-B-40 A</witsml:nameWell><witsml:nameWellbore>NO 34/10-B-40 A</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:04:03.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/10-B-40 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/10-B-40 A</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>3628</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Kvaerner Well Services</witsml:drillContractor><witsml:rigAlias><witsml:name>GULLFAKS B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>271917</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4626</witsml:mdDiaHoleStart><witsml:diaCsgLast uom="in">4.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4773</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2277.5</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">80.7</witsml:elevKelly><witsml:sum24Hr>Spotted equipment on BOP deck. Took over the well from production department. RU WL and pumping equipment on the well. On standby to lift up lubricator due to wind speed exceeded operation limit for WL crane. </witsml:sum24Hr><witsml:forecast24Hr>RIH with BHA#1 (WL brush). Spot Safe-Solv 148 and brush DHSV area. Inflow test DHSV and RD equipment from the well.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Performed pre-job meeting with night crew. Depth: 0. Waited on weather. Continued on standby due to strong wind. Depth: 0. Function test Well Equip jar. MU BHA#1 (6,3&quot; brush with 6,1&quot; no-go) and installed in lubricator. Leak tested RU to 20/345 bar 5/10 min. </witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T00:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed startup meeting with night crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T00:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Spotted WL and pumping equipment on work area. Prepared brush BHA. Lined up pumping lines towards the well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Cont. spotting equipment in BOP area. Built scaffolding around X-mas tree.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for activity program to be signed. Meanwhile had start up meeting with day crew.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Production to hand over well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Handed well over from Production to Well operation. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>RU pumping line from cement unit to KWV. RU lower riser and WL BOP. Function tested WL BOP. Leak tested riser and WL BOP to 20/345 bar for 5/10 mins. Leak tested pump line to 20/345 bar for 5/10 mins.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed A-standard meeting, evaluated situation prior proceed operation with respect to strong wind. Secured work place. On standby to lift up lubricator and BHA due to wind speed was up to 58 knots while max allowable wind speed to operate WL crane is 48 knots according to APOS.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/11-A-11</witsml:nameWell><witsml:nameWellbore>NO 34/11-A-11</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:05:05.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/11-A-11</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/11-A-11</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5001</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dateDrillComplete>2004-12-27</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>KVITEBJØRN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280877</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4389</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">2.1</witsml:strengthForm><witsml:mdStrengthForm uom="m">4200</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3989</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4483.2</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">60.5</witsml:elevKelly><witsml:sum24Hr>Received logging equipment from town. Waited for Baker logging personnel to arrive. Baker personnel arrived. Handed well from Prod dept. to D&amp;W. Transferred controll of DHSV and HMV from platform system to local panel. Waited for Prod dept. to close in wells prior to performing critical lift</witsml:sum24Hr><witsml:forecast24Hr>Perform critical lift and rig on well. Prepare Baker logging equipment. MU BHA no 1 with CMI logging tool. RIH with CMI logging tool to TD. Logg with CMI tool according to program.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>Fresh Water</witsml:type><witsml:dTim>2011-10-03T16:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">827</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.05</witsml:density><witsml:pv uom="mPa.s">-9999</witsml:pv><witsml:yp uom="Pa">-9999</witsml:yp></witsml:fluid>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Disconnected KWV end cap and RU kill line to KWV. Meanwhile Production department to close in wells prior to performing critical lift. Depth: 0. Changed hatch cover to WL hatch. Removed X-mas top cap. Performed critical lift and landed wireline stack onto x-mas tree. MU clamp on lower riser. Depth: 0. Function tested BOP Depth: 0. Leak tested with cmt unit against closed Lo-Tq valve outside KVW to 20/ 445 bar for 5/ 10 min Depth: 0. Leak tested against closed KWV to 20/ 445 bar for 5/ 10 min.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T01:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Received logging equipment from town. Spotted tool containers and logging cabin on pipedeck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T01:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Baker logging personnel to arrive. Meanwhile held A-standard training with topic leak testing and prepared equipment for 5/16&quot; mono cable operation.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Baker logging personnel to arrive. Meanwhile prepared WL equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T20:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Baker personnel arrived. New arrived Baker personnel on platform introduction brief.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T20:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T21:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed pre job meeting with involved personnel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T21:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Handed well from Prod dept. to D&amp;W. Transferred controll of DHSV and HMV from platform system to local panel. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T22:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Preformed SJA and DOP meeting prior critical lifting operations (RU WL riser incl WL BOP).</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T22:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for Production department to close in wells prior to performing critical lift.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/4-C-8 H</witsml:nameWell><witsml:nameWellbore>NO 34/4-C-8 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:01:15.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/4-C-8 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/4-C-8 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6546</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2005-06-02T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2011-07-05</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>SNORRE B</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>280485</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">0</witsml:md><witsml:tvd uom="m">0</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4427.6</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.69</witsml:strengthForm><witsml:mdStrengthForm uom="m">3944</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">2472</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4641.7</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2637</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">37</witsml:elevKelly><witsml:sum24Hr>Waited for 60 hrs weather window to run completion string to production packer.</witsml:sum24Hr><witsml:forecast24Hr>Wait for weather window to run completion string to production packer.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>Cs/KFormate </witsml:type><witsml:dTim>2011-10-03T15:00:00.000Z</witsml:dTim><witsml:md uom="m">4645</witsml:md><witsml:presBopRating uom="bar">345</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.63</witsml:density><witsml:pv uom="mPa.s">26</witsml:pv><witsml:yp uom="Pa">14</witsml:yp></witsml:fluid>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited for 60 hrs weather window to run completion string to production packer.
Max heave observed 6,8 m.
Meanwhile performed general maintenance on drilling equipment.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for 60 hrs weather window to be able to RIH with comletion string to prod.packer.
Meanwhile performed general maintenance on drilling equipment. Broke down drill pipe stand. Washed and greased threads, racked back same.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited for 60 hrs weather window to be able to RIH with comletion string to prod.packer.
Meanwhile performed general maintenance on drilling equipment.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/7-C-2 AH</witsml:nameWell><witsml:nameWellbore>NO 34/7-C-2 AHT4</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:01:43.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/7-C-2 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/7-C-2 AHT4</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4341</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2001-09-21T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Island Offshore Management</witsml:drillContractor><witsml:rigAlias><witsml:name>ISLAND FRONTIER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>373829</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4660</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">3177</witsml:mdKickoff><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4629</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">2</witsml:elevKelly><witsml:sum24Hr>None</witsml:sum24Hr><witsml:forecast24Hr>None</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Lifted onboard Vetco connector. Connected stack to connector. Performed between well check on stack.
Took onboard: AWS plug container.
Back loaded: TCRT, Pariser wheel., 3 ea pop-off valve to be re-set, 2 ea HW 443 tand, 1 CPI work container, 1 ea 6m guide post.</witsml:extendedReport >
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 34/7-P-7</witsml:nameWell><witsml:nameWellbore>NO 34/7-P-7</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:02:11.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>34/7-P-7</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>34/7-P-7</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>1720</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>1991-07-14T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>BJ Services</witsml:drillContractor><witsml:rigAlias><witsml:name>SNORRE A</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>272085</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">368.4</witsml:mdKickoff><witsml:strengthForm uom="g/cm3">0</witsml:strengthForm><witsml:mdStrengthForm uom="m">0</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4779.6</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">59.4</witsml:elevKelly><witsml:sum24Hr>Started to spot and prepare CT equipment prior to rig up. WOW.</witsml:sum24Hr><witsml:forecast24Hr>Continue to spot and prepare CT equipment prior to rig up.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. WOW.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T02:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>All coiled tubing equipment onboard. Prepared rig crane prior to lifting CT reels.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Repositioned CT reels. Lifted track and trolly to pipe deck and spotted same in position against well. Lifted power pack to pipe deck. Positioned turn table onto track and trolly. Positioned reel foundation onto turn table.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Crane dep. busy with other crane operations. Meanwhile unpacked CT equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T07:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Looked for and found beams to put under the tool container. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T07:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T08:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Activated work permit for working on pipe deck. Prepared rig up plan. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T08:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:05:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited due to crane lifting in pipe deck area.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:05:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T09:55:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on electrician due to busy with other work.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T09:55:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T11:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Hooked up CT power pack to platform fire &amp; gas system. Function tested CT power pack.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T11:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Lifted 3 ea. beams for tool container up to pipe deck. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- wait</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on crane dep.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:15:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held tool box talk. Lifted CT reel into foundation and removed the bridle.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:15:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:10:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW. To strong wind for crane operation.
Meanwhile started to disconnect power pack prior to replacing.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:10:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T17:50:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>workover -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Crane available. Repositioned CT reel cradle and foundation bridle. Lifted and positioned tool container onto beams.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T17:50:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>coil</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW.
Meanwhile:
Disconnected and prepared power pack prior to repositioning, due to drilling dep. needed more space on pipe deck.
Storm secured all CT equipment.
Held startup meeting for night shift crew.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 35/8-Q-14 H</witsml:nameWell><witsml:nameWellbore>NO 35/8-Q-14 H</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:05:25.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>35/8-Q-14 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>35/8-Q-14 H</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6435</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2010-08-14T00:00:00.000Z</witsml:dTimSpud><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Dolphin</witsml:drillContractor><witsml:rigAlias><witsml:name>BIDEFORD DOLPHIN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>290170</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4751</witsml:md><witsml:tvd uom="m">3649</witsml:tvd><witsml:diaHole uom="in">0</witsml:diaHole><witsml:strengthForm uom="g/cm3">1.95</witsml:strengthForm><witsml:mdStrengthForm uom="m">3654.5</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3547.5</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">4720</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">3649</witsml:tvdCsgLast><witsml:presTestType>leak off test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">31</witsml:elevKelly><witsml:sum24Hr>Waited on weather. Not sufficient weather window for cleaning up well.</witsml:sum24Hr><witsml:forecast24Hr>Wait on weather.
When weather permits : pull deep set BTU plug.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Waited on weather.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on weather. Not sufficient weather window for cleaning up well.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Waited on weather. Not sufficient weather window for cleaning up well.
Simultaneously prepared for disconnecting EDP:
Bled off pressure in well from 80 bar to zero. Closed all valves in XT and LRP (except GSR). Disconnected all 3 electrical jumpers between EDP and LRP and parked on EDP. Bled off LP and HP pressure to XT. Disconnected hydraulic jumper from LRP and parked on LRP. Disconnected grease injection head hoses.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6506/12-P-1 BH</witsml:nameWell><witsml:nameWellbore>NO 6506/12-P-1 BH</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:06:58.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>6506/12-P-1 BH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>6506/12-P-1 BH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>6644</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimPreSpud>2011-09-21T21:00:00.000Z</witsml:dTimPreSpud><witsml:dateDrillComplete>2011-09-21</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Odfjell Drilling AS</witsml:drillContractor><witsml:rigAlias><witsml:name>DEEPSEA BERGEN</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>287983</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">6798.6</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">4440</witsml:mdDiaHoleStart><witsml:strengthForm uom="g/cm3">1.6</witsml:strengthForm><witsml:mdStrengthForm uom="m">4376</witsml:mdStrengthForm><witsml:tvdStrengthForm uom="m">3909.5</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">5.5</witsml:diaCsgLast><witsml:mdCsgLast uom="m">6746.6</witsml:mdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">23</witsml:elevKelly><witsml:sum24Hr>Laid down weak link bails to deck. Performed maintenance on BOP.</witsml:sum24Hr><witsml:forecast24Hr>Maintenance on BOP. WOW for running BOP.
Operational target tomorrow at 06:00; WOW for running BOP.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:fluid><witsml:type>Packer fluid</witsml:type><witsml:dTim>2011-10-03T23:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:presBopRating uom="bar">690</witsml:presBopRating ><witsml:mudClass>water based</witsml:mudClass><witsml:density uom="g/cm3">1.11</witsml:density><witsml:pv uom="mPa.s">-9999</witsml:pv><witsml:yp uom="Pa">-9999</witsml:yp></witsml:fluid>
<witsml:porePressure><witsml:readingKind>measured</witsml:readingKind><witsml:equivalentMudWeight uom="g/cm3">1.06</witsml:equivalentMudWeight><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">4376</witsml:md></witsml:porePressure>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. Performed maintenance on BOP. Changed UAP element.
Meanwhile: Changed out chicksan piping on rig floor. Installed pipe handler on top drive.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T02:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Rigged down weak link bail system from rig floor.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T02:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed maintenance on BOP. Changed to 9 5/8&quot; LPR.
Meanwhile: Disconnected pipe handler, upper and lower IBOP and saver sub from top drive for NDT testing. Checked main shaft and solid body elevator. Checked fluid level on ruckers.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>completion -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed maintenance on BOP. Pressure tested BOP on stump to 20/485 bar for 5/10 min. Found UAP leaking. Changed UAP element.
Meanwhile: Continued NDT of top drive components. Installed new upper and lower IBOP valves on top drive. Repaired hydraulic hoses on pipe handler. Changed out chicksan piping on rig floor. Greased kill and choke manifold. Checked fluid level on ruckers. Checked marine riser dogs.</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 6608/10-C-4 AH</witsml:nameWell><witsml:nameWellbore>NO 6608/10-C-4 AH</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-05T08:07:51.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>6608/10-C-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>6608/10-C-4 AH</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>4826</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2003-11-15T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2003-12-10</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Island Offshore Management</witsml:drillContractor><witsml:rigAlias><witsml:name>ISLAND WELLSERVER</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>404470</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:diaCsgLast uom="in">7</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3617</witsml:mdCsgLast><witsml:tvdCsgLast uom="m">2901</witsml:tvdCsgLast><witsml:presTestType>formation integrity test</witsml:presTestType><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">3</witsml:elevKelly><witsml:sum24Hr>Performed RST log. Not able to get signals from RST tool after two passes. Decided to log caliper. Logged OOH with caliper. Lost signals from caliper at 1000 m MD. POOH. L/D BHA#2. Disconnected UTH. WOW, meanwhile in transit to Sandnessjøen.</witsml:sum24Hr><witsml:forecast24Hr>WOW, meanwhile in transit to Sandnessjøen. WOW.
Status at 06:00: WOW at quay in Sandnessjøen.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>
<witsml:extendedReport dTim="2011-10-04T00:00:00.000Z">Depth: 0. WOW.
Meanwhile: Transit to Sandnessjøen.</witsml:extendedReport >
<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">3455</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed RST-D in IC mode from 3418-3375 m MD at 0.5 m/min. Repeated logging pass. After second logging pass not able to get signals from RST tool.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">3455</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubelshot RST tool. Not able to get signals. Decided to continue with caliper logging.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T10:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">3455</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed caliper logging from 3455 m to 3415 m MD with 4.5 m/min. RIH to 3455 m MD. Performed caliper logging from 3455 m to 1021 m 10 m/min. WHP 118 bar. Annulus pressure 30 bar. Lost communication with caliper.
Meanwhile: Norne pressured up annulus pressure on D-1 to 60 bar. Performed survey with ROV on D-1. No visual leaks observed.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T10:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T13:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">1000</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Troubleshot signals from BHA while POOH. Pulled BHA into toolcatcher.
Meanwhile: Closed MV#42(230 Nm, 23 turn)</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T13:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T16:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">371</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Closed UPIV and LPIV. Flushed stack with 800 ltr MEG. Inflow tested LPIV 70 bar/10 min. Inflow tested UPIV 345 bar/10 min.
Meanwhile: Established GW 2 and 4. Deployed PCH RT.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T16:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T18:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>interruption -- other</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity><witsml:comments>Retrieved PCH and BHA to surface. Inspected and L/D BHA.
Meanwhile: Closed AMV, AP 50 bar. Closed DHSV. Connected Norne to SEM A.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T18:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T19:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>workover -- bop/wellhead equipment</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Prepared to disconnect UTH. Disconnected UTH and retrieved same to surface.
Meanwhile: Seafastened equipment on deck.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T19:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>fixed</witsml:phase><witsml:proprietaryCode>interruption -- waiting on weather</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>WOW, meanwhile in transit to Sandnessjøen, ETA 08:00</witsml:comments></witsml:activity>
</witsml:drillReport></witsml:drillReports>
\ No newline at end of file
# Saved by TopBraid on Sun Sep 18 11:19:24 BST 2011
# baseURI: http://www.reportinghub.no/test/ddr/testcase/DATA_ddr-report-header
@prefix : <http://www.reportinghub.no/test/ddr/testcase/DATA_ddr-report-header#> .
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://www.reportinghub.no/test/ddr/testcase/DATA_ddr-report-header>
rdf:type <http://www.w3.org/2002/07/owl#Ontology> ;
<http://www.w3.org/2002/07/owl#versionInfo>
"Created with TopBraid Composer"^^xsd:string .
This diff could not be displayed because it is too large.
<?xml version="1.0" encoding="utf-8"?>
<drillReports version="1.4.0.0" xmlns="http://www.witsml.org/schemas/1series" xmlns:abs="http://www.energistics.org/schemas/abstract" xmlns:gml="http://www.opengis.net/gml/3.2" xmlns:sawsdl="http://www.w3.org/ns/sawsdl" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" >
<drillReport uid="AkRZZqQUNw" uidWell="1/3-A-1" uidWellbore="1/3-A-1_H">
<nameWell>1/3-A-1</nameWell>
<nameWellbore>1/3-A-1 H</nameWellbore>
<name>Daily Drilling Report for Aug 18, 2011</name>
<dTimStart>2011-08-18T00:00:00Z</dTimStart>
<dTimEnd>2011-08-19T00:00:00Z</dTimEnd>
<versionKind>normal</versionKind>
<createDate>2011-08-19T12:00:12Z</createDate>
<wellAlias uid="1">
<name>3365-P</name>
<namingSystem>NPD code</namingSystem>
</wellAlias>
<wellboreAlias uid="1">
<name>1/3-A-1 H</name>
<namingSystem>NPD code</namingSystem>
</wellboreAlias>
<wellboreAlias uid="2">
<name>6612</name>
<namingSystem>NPD number</namingSystem>
</wellboreAlias>
<wellDatum defaultElevation="true" defaultMeasuredDepth="true" defaultVerticalDepth="true" uid="CF">
<name>RT</name>
<code>RT</code>
<kind>Rotary Table</kind>
<wellbore>
<wellboreReference>--None--</wellboreReference>
<wellParent>1/3-A-1</wellParent>
</wellbore>
<rig>
<rigReference>MÆRSK GIANT</rigReference>
<wellboreParent>--None--</wellboreParent>
<wellParent>1/3-A-1</wellParent>
</rig>
<measuredDepth datum="SL" uom="m">45.40</measuredDepth>
<comment>depths to be updated</comment>
</wellDatum>
<wellDatum uid="KB">
<name>Mean Sea Level</name>
<code>SL</code>
</wellDatum>
<wellboreInfo>
<operator>DONG_E_and_P_ Norge</operator>
<drillContractor>Mærsk Drilling</drillContractor>
<rigAlias uid="2">
<name>MÆRSK GIANT</name>
<namingSystem>NPD Name</namingSystem>
</rigAlias>
<rigAlias>
<name>278245</name>
<namingSystem>NPD Code</namingSystem>
</rigAlias>
</wellboreInfo>
<statusInfo uid="1">
<dTim>2011-08-18T00:00:00Z</dTim>
<md uom="m">3583.00</md>
<tvd uom="m">3109.69</tvd>
<mdPlugTop uom="m">0.00</mdPlugTop>
<diaHole uom="in">12.250</diaHole>
<mdDiaHoleStart uom="m">2020.00</mdDiaHoleStart>
<diaPilot uom="in">12.250</diaPilot>
<mdKickoff uom="m">0.00</mdKickoff>
<tvdKickoff uom="m">0.00</tvdKickoff>
<diaCsgLast uom="in">13.375</diaCsgLast>
<mdCsgLast uom="m">2013.00</mdCsgLast>
<tvdCsgLast uom="m">1926.90</tvdCsgLast>
<distDrill uom="m">342.00</distDrill>
<elevKelly uom="m">24.50</elevKelly>
<sum24Hr>Drilled and oriented 12 1/4&amp;quot; hole from 3241 to 3317 m. Reduced ROP due to geological purposes from 3280 m. Changed valves and seats in suction module #2 and 3, mud pump #3. Drilled and oriented 12 1/4&amp;quot; hole from 3317 to 3583 m at reduced ROP.</sum24Hr>
<forecast24Hr>Drill and orient 12 1/4&amp;quot; hole from 3583 to TD of section (3880 m) at reduced ROP.</forecast24Hr>
<ropCurrent uom="m/h">14.20</ropCurrent>
</statusInfo>
<bitRecord uid="1">
<numBit>4.N</numBit>
<diaBit uom="in">16.000</diaBit>
<manufacturer>ReedHycalog</manufacturer>
<codeMfg>M423</codeMfg>
</bitRecord>
<bitRecord uid="2">
<numBit>5.N</numBit>
<diaBit uom="in">12.250</diaBit>
<manufacturer>ReedHycalog</manufacturer>
<codeMfg>M422</codeMfg>
</bitRecord>
<fluid uid="1">
<type>Synthetic</type>
<dTim>2011-08-16T22:00:00Z</dTim>
<md uom="m">3558.00</md>
<tvd uom="m">3102.00</tvd>
<presBopRating uom="bar">1034.0000</presBopRating>
<mudClass>oil based</mudClass>
<density uom="g/cm3">1.750</density>
<pv uom="Pa.s">0.04900</pv>
<yp uom="Pa">5.746</yp>
</fluid>
<porePressure uid="1">
<readingKind>estimated</readingKind>
<equivalentMudWeight uom="g/cm3">1.470</equivalentMudWeight>
<dTim>2011-08-16T22:00:00Z</dTim>
<md uom="m">3558.00</md>
</porePressure>
<extendedReport dTim="2011-08-19T00:00:00Z">Drilled and oriented 12 1/4&quot; hole from 3583 to 3640 m as pr landing plan.</extendedReport>
<surveyStation uid="1">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3514.20</md>
<tvd uom="m">3086.93</tvd>
<incl uom="dega">67.77</incl>
<azi uom="dega">99.86</azi>
</surveyStation>
<surveyStation uid="2">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3485.10</md>
<tvd uom="m">3075.40</tvd>
<incl uom="dega">65.55</incl>
<azi uom="dega">98.19</azi>
</surveyStation>
<surveyStation uid="3">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3312.10</md>
<tvd uom="m">2993.91</tvd>
<incl uom="dega">57.75</incl>
<azi uom="dega">90.07</azi>
</surveyStation>
<surveyStation uid="4">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3340.70</md>
<tvd uom="m">3008.81</tvd>
<incl uom="dega">59.48</incl>
<azi uom="dega">91.76</azi>
</surveyStation>
<surveyStation uid="5">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3398.50</md>
<tvd uom="m">3037.12</tvd>
<incl uom="dega">61.97</incl>
<azi uom="dega">94.42</azi>
</surveyStation>
<surveyStation uid="6">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3571.80</md>
<tvd uom="m">3106.41</tvd>
<incl uom="dega">72.60</incl>
<azi uom="dega">103.82</azi>
</surveyStation>
<surveyStation uid="7">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3600.20</md>
<tvd uom="m">3114.48</tvd>
<incl uom="dega">74.39</incl>
<azi uom="dega">104.89</azi>
</surveyStation>
<surveyStation uid="8">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3456.10</md>
<tvd uom="m">3063.12</tvd>
<incl uom="dega">64.36</incl>
<azi uom="dega">96.60</azi>
</surveyStation>
<surveyStation uid="9">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3369.50</md>
<tvd uom="m">3023.19</tvd>
<incl uom="dega">60.60</incl>
<azi uom="dega">93.00</azi>
</surveyStation>
<surveyStation uid="10">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3542.70</md>
<tvd uom="m">3097.14</tvd>
<incl uom="dega">70.24</incl>
<azi uom="dega">101.88</azi>
</surveyStation>
<surveyStation uid="11">
<dTim>2011-08-18T00:01:00Z</dTim>
<md uom="m">3427.20</md>
<tvd uom="m">3050.34</tvd>
<incl uom="dega">63.17</incl>
<azi uom="dega">95.35</azi>
</surveyStation>
<activity uid="1">
<dTimStart>2011-08-18T00:00:00Z</dTimStart>
<dTimEnd>2011-08-18T01:30:00Z</dTimEnd>
<md uom="m">3280.00</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- drill</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Drilled and oriented 12 1/4&amp;quot; hole from 3241 to 3280 m with: 22 tons WOB, 140 RPM, ROP+- 50 m/hr, 12-14 kNm TQ, 36350 lpm and 260 bar, 1.78 sg ECD. </comments>
</activity>
<activity uid="2">
<dTimStart>2011-08-18T01:30:00Z</dTimStart>
<dTimEnd>2011-08-18T02:30:00Z</dTimEnd>
<md uom="m">3299.00</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- drill</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Continued drilling and orienting 12 1/4&amp;quot; hole from 3280 to 3299 m at reduced ROP (for geological purposes). with: 10-22 tons WOB, 145 RPM, ROP+- 30 m/hr, 20 kNm TQ, 3350 lpm and 260 bar, 1.78 sg ECD. </comments>
</activity>
<activity uid="3">
<dTimStart>2011-08-18T02:30:00Z</dTimStart>
<dTimEnd>2011-08-18T05:00:00Z</dTimEnd>
<md uom="m">3299.00</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- other</proprietaryCode>
<state>fail</state>
<stateDetailActivity>equipment failure</stateDetailActivity>
<comments>Drilling operation aborted due to 40 bar drop in Stand pipe pressure. Investigated problem. Identified problem to Mud pump #3 . Opened up and cleaned suction and discharge fluid ends. Changed valves and seats in #2 and #3 suction module.</comments>
</activity>
<activity uid="4">
<dTimStart>2011-08-18T05:00:00Z</dTimStart>
<dTimEnd>2011-08-18T12:00:00Z</dTimEnd>
<md uom="m">3429.00</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- drill</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Continued drilling and orienting 12 1/4&amp;quot; hole from 3299 to 3429 m with: 10-17 tons WOB, 142 RPM, ROP+- 25 m/hr, 14-17 kNm TQ, 3350 lpm and 260 bar, 1.77 sg ECD. </comments>
</activity>
<activity uid="5">
<dTimStart>2011-08-18T12:00:00Z</dTimStart>
<dTimEnd>2011-08-19T00:00:00Z</dTimEnd>
<md uom="m">3583.00</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- drill</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Continued drilling and orienting 12 1/4&amp;quot; hole from 3429 to 3583 m with: 12-19 tons WOB, 142 RPM, ROP 7-25 m/hr, 15-24 kNm TQ, 3340 lpm and 278 bar, 1.77 sg ECD. Mud pump # 2 on line 13:10 hr. Enter Balder formation at 3489 m and Sele formation at 3525 m. Lost mud while drilling from 3509 to 3538 m. Lost total off 20 m3 mud. Max loss rate of 15 m3/ hr.&amp;#xA;0.3m below and 1.2m to the right of target line.</comments>
</activity>
<equipFailureInfo uid="1">
<dTim>2011-08-18T02:30:00Z</dTim>
<md uom="m">3299.00</md>
<equipClass>mud and bulk syst -- mud supply</equipClass>
<eTimMissProduction uom="h">2.00</eTimMissProduction>
<dTimRepair>2011-08-18T05:00:00Z</dTimRepair>
<description>Mud pump 3 suction module 2&amp;amp; 3, changed valves and seats</description>
</equipFailureInfo>
</drillReport>
</drillReports>
<?xml version="1.0" encoding="UTF-8"?>
<drillReports xmlns="http://www.witsml.org/schemas/1series" version="1.4.0.0">
<drillReport>
<nameWell>2/1-A-25</nameWell>
<nameWellbore>A-25 A</nameWellbore>
<name>2/1-A-25</name>
<dTimStart>2011-03-23T00:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T00:00:00.000Z</dTimEnd>
<versionKind>normal</versionKind>
<createDate>2011-03-24T07:04:05.550Z</createDate>
<wellAlias>
<name>0</name>
<namingSystem>NPD code</namingSystem>
</wellAlias>
<wellboreAlias>
<name>2/1-A-25 A</name>
<namingSystem>NPD code</namingSystem>
</wellboreAlias>
<wellboreAlias>
<name>6482</name>
<namingSystem>NPD number</namingSystem>
</wellboreAlias>
<wellboreInfo>
<dTimPreSpud>2011-01-27T13:00:00.000Z</dTimPreSpud>
<operator>Talisman Energy Norge</operator>
<drillContractor>Archer</drillContractor>
<rigAlias>
<name>Gyda</name>
<namingSystem>NPD Name</namingSystem>
</rigAlias>
<rigAlias>
<name>272337</name>
<namingSystem>NPD code</namingSystem>
</rigAlias>
</wellboreInfo>
<statusInfo>
<dTim>2011-03-23T00:00:00.000Z</dTim>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">3089.0</md>
<tvd datum="ff8080812d82ea35012dbcc14fac200b" uom="m">2440.23</tvd>
<diaHole uom="in">17.5</diaHole>
<mdDiaHoleStart datum="ff8080812d82ea35012dbcc14fac200b" uom="m">65.5</mdDiaHoleStart>
<diaPilot uom="in">0.0</diaPilot>
<typeWellbore>initial</typeWellbore>
<diaCsgLast uom="in">13.375</diaCsgLast>
<mdCsgLast datum="ff8080812d82ea35012dbcc14fac200b" uom="m">3081.4</mdCsgLast>
<tvdCsgLast datum="ff8080812d82ea35012dbcc14fac200b" uom="m">2435.4</tvdCsgLast>
<sum24Hr>Installed outer and Inner FOG on A-25. Skidded rig from Slot 32 to slot 25. Nippled up HP riser on slot 25 . Nippled up 13 5/8" BOP. Moved 21 1/4" BOP to be stored on slot 28.</sum24Hr>
<forecast24Hr>N/U 13 5/8" low pressure riser and diverter. Pressure test BOP to 200 bar.</forecast24Hr>
</statusInfo>
<fluid>
<type>ENVIROMUL</type>
<dTim>2011-03-23T15:00:00.000Z</dTim>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">905.0</md>
<presBopRating uom="bar">200.00000000000006</presBopRating>
<mudClass>oil based</mudClass>
<density uom="g/cm3">1.549994265</density>
<pv uom="mPa.s">47.0</pv>
<yp uom="Pa">13.4</yp>
</fluid>
<activity>
<dTimStart>2011-03-23T00:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T02:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Installed Outer &amp; Inner FOGs on A-32. Outer FOG installed and landed in frame on BOP deck by use of tugger and North crane. Inner FOG installed with tugger from drill floor.</comments>
</activity>
<activity>
<dTimStart>2011-03-23T02:30:00.000Z</dTimStart>
<dTimEnd>2011-03-23T04:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Disconnected HP riser from A-32 wellhead. Connected 10 ton slings from DDM to HP riser and lifted riser to BOP deck. Laid down HP riser to BOP deck with DDM &amp; North Crane.</comments>
</activity>
<activity>
<dTimStart>2011-03-23T04:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T06:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Removed Inner and Outer FOGs from A-32 and positioned on BOP deck. Moved aside BOP hatch from A-25 and lifted FOG frame from A-32 to A-25. Moved scaffolding from A-32 to A-25. Installed Outer &amp; Inner FOGs on A-25.
</comments>
</activity>
<activity>
<dTimStart>2011-03-23T06:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T08:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Preparing for skidding rig from A-32 to A-25.</comments>
</activity>
<activity>
<dTimStart>2011-03-23T08:30:00.000Z</dTimStart>
<dTimEnd>2011-03-23T09:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Performed pre-job meeting prior to start skid from slot 32 to slot 25</comments>
</activity>
<activity>
<dTimStart>2011-03-23T09:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T10:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Skidded rig from slot 32 to slot 25. </comments>
</activity>
<activity>
<dTimStart>2011-03-23T10:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T13:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Rig on location on slot 25. Secured rig according to compass procedures.</comments>
</activity>
<activity>
<dTimStart>2011-03-23T13:30:00.000Z</dTimStart>
<dTimEnd>2011-03-23T14:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Performed pre-job meeting prior to start nippling up HP-riser and BOP on A-25.</comments>
</activity>
<activity>
<dTimStart>2011-03-23T14:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T14:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Build scaffolding to secure around open hatch on diverter deck. </comments>
</activity>
<activity>
<dTimStart>2011-03-23T14:30:00.000Z</dTimStart>
<dTimEnd>2011-03-23T16:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Nippled up HP riser on A-25 well head. </comments>
</activity>
<activity>
<dTimStart>2011-03-23T16:30:00.000Z</dTimStart>
<dTimEnd>2011-03-23T19:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Installed 13 5/8" BOP on HP-riser and made up fast lock connector. </comments>
</activity>
<activity>
<dTimStart>2011-03-23T19:30:00.000Z</dTimStart>
<dTimEnd>2011-03-23T21:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Moved 21 1/4" BOP to slot 28 on BOP deck for storage.
Meanwhile: cleaned and tidied on rig floor. And troubleshot on DDM tilt link.
</comments>
</activity>
<activity>
<dTimStart>2011-03-23T21:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T23:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Turned Kill and choke outlets on BOP to install kill and choke hoses. Lifted down kill and choke hoses from drill floor to BOP deck and installed same.
Meanwhile: Changed out slide in link tilt operating valve - Link tilt working properly </comments>
</activity>
<activity>
<dTimStart>2011-03-23T23:00:00.000Z</dTimStart>
<dTimEnd>2011-03-23T23:59:59.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Installed master bushing in rotary. Performed pre-job meeting prior to lifting in LP-riser. Picked up LP-riser and installed same in RKB. </comments>
</activity>
</drillReport>
</drillReports>
# Saved by TopBraid on Fri Oct 14 13:27:14 BST 2011
# baseURI: http://www.reportinghub.no/test/dpr/DATA_Owner-Jotun
@prefix : <http://www.reportinghub.no/test/dpr/DATA_Owner-Jotun#> .
@prefix inparm: <http://www.reportinghub.no/user-input-parameter#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://www.reportinghub.no/test/dpr/DATA_Owner-Jotun>
rdf:type owl:Ontology ;
owl:versionInfo "Created with TopBraid Composer"^^xsd:string .
:Jotun
rdf:type rdfs:Resource ;
inparm:owner "http://www.reportinghub.no/np/data/npd/BAA-40655"^^xsd:anyURI .
inparm:owner
rdf:type owl:DatatypeProperty ;
rdfs:range xsd:anyURI .
# Saved by TopBraid on Fri Oct 14 13:35:40 BST 2011
# baseURI: http://www.reportinghub.no/test/dpr/TEST_dpr-xml-ingest-Jotun
# imports: http://www.reportinghub.no/test/dpr/DATA_Owner-Jotun
# imports: http://www.reportinghub.no/np/data/npd
# imports: http://www.reportinghub.no/np/data/npd-alias-identifiers
# imports: http://spinrdf.org/spin
# imports: http://www.reportinghub.no/ep/transform/TRANSFORM_dpr-collector-v1.0
@prefix DATA_Owner-Jotun: <http://www.reportinghub.no/test/dpr/DATA_Owner-Jotun#> .
@prefix TEST_dpr-xml-ingest-Jotun: <http://www.reportinghub.no/test/dpr/TEST_dpr-xml-ingest-Jotun#> .
@prefix npd-alias-identifiers: <http://www.reportinghub.no/np/data/npd-alias-identifiers#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix sp: <http://spinrdf.org/sp#> .
@prefix spin: <http://spinrdf.org/spin#> .
@prefix spl: <http://spinrdf.org/spl#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://www.reportinghub.no/test/dpr/TEST_dpr-xml-ingest-Jotun>
rdf:type owl:Ontology ;
owl:imports <http://www.reportinghub.no/np/data/npd-alias-identifiers> , <http://www.reportinghub.no/np/data/npd> , <http://www.reportinghub.no/ep/transform/TRANSFORM_dpr-collector-v1.0> , <http://www.reportinghub.no/test/dpr/DATA_Owner-Jotun> , <http://spinrdf.org/spin> ;
owl:versionInfo "Created with TopBraid Composer"^^xsd:string .
# Saved by TopBraid on Fri Oct 14 13:35:40 BST 2011
# baseURI: null
@prefix composite: <http://www.topbraid.org/2007/05/composite.owl#> .
@prefix forms: <http://www.topbraid.org/2007/01/forms.owl#> .
@prefix inference: <http://www.topbraid.org/2007/06/inference.owl#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix visual: <http://topbraid.org/visual#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
[] rdf:type inference:Configuration ;
composite:child
[ rdf:type <http://spinrdf.org/spin#TopSPIN> ;
<http://spinrdf.org/spin#topSPINOptions>
"singlePass" ;
composite:index "0"^^xsd:int
] ;
inference:completeMode
"true"^^xsd:boolean .
This diff could not be displayed because it is too large.