<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
  <witsml:drillReport>
    <witsml:nameWell>25/8-C-23</witsml:nameWell>
    <witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
    <witsml:name>25/8-C-23</witsml:name>
    <witsml:dTimStart>2011-04-11T06:00:00.001Z</witsml:dTimStart>
    <witsml:dTimEnd>2011-04-12T06:00:00.001Z</witsml:dTimEnd>
    <witsml:versionKind>normal</witsml:versionKind>
    <witsml:createDate>2011-04-12T08:10:00.001Z</witsml:createDate>
    <witsml:wellAlias>
      <witsml:name>25/8-C-23</witsml:name>
      <witsml:namingSystem>NPD code</witsml:namingSystem>
    </witsml:wellAlias>
    <witsml:wellboreAlias>
      <witsml:name>25/8-C-23 B</witsml:name>
      <witsml:namingSystem>NPD code</witsml:namingSystem>
    </witsml:wellboreAlias>
    <witsml:wellboreAlias>
      <witsml:name>6480</witsml:name>
      <witsml:namingSystem>NPD number</witsml:namingSystem>
    </witsml:wellboreAlias>
    <witsml:wellDatum>
      <witsml:name>Kelly Bushing</witsml:name>
      <witsml:code>KB</witsml:code>
      <witsml:elevation uom="m">32</witsml:elevation>
    </witsml:wellDatum>
    <witsml:wellDatum>
      <witsml:name>Sea Level</witsml:name>
      <witsml:code>SL</witsml:code>
      <witsml:elevation uom="m">32</witsml:elevation>
    </witsml:wellDatum>
    <witsml:wellboreInfo>
      <witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
      <witsml:operator>Esso Norway</witsml:operator>
      <witsml:drillContractor>KCA Deutag</witsml:drillContractor>
      <witsml:rigAlias>
        <witsml:name>Ringhorne</witsml:name>
        <witsml:namingSystem>NPD Name</witsml:namingSystem>
      </witsml:rigAlias>
      <witsml:rigAlias>
        <witsml:name>280849</witsml:name>
        <witsml:namingSystem>NPD Code</witsml:namingSystem>
      </witsml:rigAlias>
    </witsml:wellboreInfo>
    <witsml:statusInfo>
      <witsml:dTim>2011-04-11T06:00:00.001Z</witsml:dTim>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:presTestType>formation integrity test</witsml:presTestType>
      <witsml:distDrill uom="m">0</witsml:distDrill>
      <witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
      <witsml:sum24Hr>Circulate and condition hole at 5699m. Step up flow rate to 1130 lpm. Increase RPM to 120. Increase mud weight to 1,35 sg MW and lubricate out of hole to 9-5/8" casing shoe. Flow check and pull out of hole with 8-1/2" drilling BHA</witsml:sum24Hr>
      <witsml:forecast24Hr>Continue to pull out of hole with 8-1/2" drilling BHA. L/D 4-1/2" DP while POOH with BHA.</witsml:forecast24Hr>
    </witsml:statusInfo>
    <witsml:bitRecord>
      <witsml:numBit>b6</witsml:numBit>
      <witsml:diaBit uom="in">8.50000015393957</witsml:diaBit>
      <witsml:manufacturer>Hughes-Christensen</witsml:manufacturer>
      <witsml:codeMfg>HCM 607</witsml:codeMfg>
    </witsml:bitRecord>
    <witsml:fluid>
      <witsml:type>Oil Based</witsml:type>
      <witsml:dTim>2011-04-11T08:30:00.001Z</witsml:dTim>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:presBopRating uom="bar">344.7378515625</witsml:presBopRating>
      <witsml:mudClass>oil based</witsml:mudClass>
      <witsml:density uom="g/cm3">1.3</witsml:density>
      <witsml:pv uom="mPa.s">16</witsml:pv>
      <witsml:yp uom="Pa">6.224434</witsml:yp>
    </witsml:fluid>
    <witsml:fluid>
      <witsml:type>Oil Based</witsml:type>
      <witsml:dTim>2011-04-11T16:45:00.001Z</witsml:dTim>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:presBopRating uom="bar">344.7378515625</witsml:presBopRating>
      <witsml:mudClass>oil based</witsml:mudClass>
      <witsml:density uom="g/cm3">1.31</witsml:density>
      <witsml:pv uom="mPa.s">16</witsml:pv>
      <witsml:yp uom="Pa">5.745631</witsml:yp>
    </witsml:fluid>
    <witsml:fluid>
      <witsml:type>Oil Based</witsml:type>
      <witsml:dTim>2011-04-11T23:45:00.001Z</witsml:dTim>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:presBopRating uom="bar">344.7378515625</witsml:presBopRating>
      <witsml:mudClass>oil based</witsml:mudClass>
      <witsml:density uom="g/cm3">1.35</witsml:density>
      <witsml:pv uom="mPa.s">15</witsml:pv>
      <witsml:yp uom="Pa">6.703236</witsml:yp>
    </witsml:fluid>
    <witsml:activity>
      <witsml:dTimStart>2011-04-11T06:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-11T10:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Continue to step up pump rate slowly from 900 lpm, 48 bar to 1200 lpm, 97 bar. Hole attempting to pack off at 1200 lpm. Reduce rate to 1130 lpm, 88 bar, 42 RPM, 16-24 kNm. Circulate and condition hole with 1130 lpm. Losses 1,5m3/hr to 3m3/hr

Cuttings Weight
0600hrs - 1,1kg/min
0700hrs - 1,8kg/min
0800hrs - 2,0kg/min
0900hrs - 1,5kg/min
1000hrs - 1,5kg/min</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-11T10:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-11T13:45:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Continue circulating at 1130 lpm, 85-88 bar. Step up pipe rotation to 120 RPM, 18-23 kNm. No indication of hole packing off with increased rotation.  Losses 2-3 m3/hr

Cuttings weight:
1100hrs - 2,2kg/min
1200hrs - 1,5kg/min
1300hrs - 2,5kg/min
1330hrs - 4,0kg/min</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-11T13:45:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-12T01:30:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Increased mud weight from 1,30sg to 1,35 sg while circulating and conditioning hole section at 5699m. 1130 lpm, 88 bar, 120 RPM, 18-23 kNm. Loss rate increased from 2-3m3/hr to 4-6m3/hr while raising mud weight to 1,35sg. Continue circulating till 1,35 sg mud in and out.

cuttings weight:
1400hrs - 3,5kg/min		2000hrs - 1,6kg/min
1500hrs - 2,5kg/min		2100hrs - 1,2kg/min
1600hrs - 2,0kg/min		2200hrs - 1,7kg/min
1700hrs - 2,5kg/min		2300hrs - 1,5kg/min
1800hrs - 2,7kg/min		0000hrs - 1,5kg/min
1900hrs - 1,2kg/min		0100hrs - 1,3kg/min
</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-12T01:30:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-12T02:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>interruption -- maintain</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Flow check prior to lubricating out of hole. Grease wash pipe and check oil on top drive while checking flow.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-12T02:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-12T05:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- ream</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Attempt to POOH without rotation. Pulled 150 ton while attempting to POOH. Slack off to neutral and begin rotating with 15-20 RPM. Lubricate out of hole with slow rotation from 5699m to 5605mm. Pump 50-90 lpm, 10-15 bar. Hookload 105-111 tons while pumping out of hole.  Lost returns when top stab entered sand zone. Continue working string through zone. Increase to 27 RPM while working pipe. Regained returns 5584m when bit exited sand zone.  Continue to lubricate BHA out of hole into 9-5/8" casing shoe at 5534m. :)</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-12T05:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-12T06:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Flow check with BHA inside 9-5/8" casing shoe. Prepare to POOH with 8-1/2" drilling BHA on 5-1/2" DP</witsml:comments>
    </witsml:activity>
  </witsml:drillReport>
</witsml:drillReports>