David Leal

Updated DDR test data

1 -<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"> 1 +<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series file:///C:/ActiveData/CAESAR_projects/Reporting_hub/www.reportinghub.no/input/WITSML_drillReport_profiled_schema_2011_01_29.xsd">
2 <witsml:drillReport> 2 <witsml:drillReport>
3 <witsml:nameWell>25/8-C-23</witsml:nameWell> 3 <witsml:nameWell>25/8-C-23</witsml:nameWell>
4 <witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore> 4 <witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
...@@ -20,7 +20,7 @@ ...@@ -20,7 +20,7 @@
20 <witsml:namingSystem>NPD number</witsml:namingSystem> 20 <witsml:namingSystem>NPD number</witsml:namingSystem>
21 </witsml:wellboreAlias> 21 </witsml:wellboreAlias>
22 <witsml:wellboreInfo> 22 <witsml:wellboreInfo>
23 - <witsml:dTimSpud>1986-06-06</witsml:dTimSpud> 23 + <witsml:dTimSpud>1986-04-05T06:00:00.001Z</witsml:dTimSpud>
24 <witsml:operator>Big operator Inc</witsml:operator> 24 <witsml:operator>Big operator Inc</witsml:operator>
25 <witsml:rigAlias> 25 <witsml:rigAlias>
26 <witsml:name>4321</witsml:name> 26 <witsml:name>4321</witsml:name>
...@@ -30,30 +30,30 @@ ...@@ -30,30 +30,30 @@
30 <witsml:statusInfo> 30 <witsml:statusInfo>
31 <witsml:reportNo>1</witsml:reportNo> 31 <witsml:reportNo>1</witsml:reportNo>
32 <witsml:dTim>2011-04-05T06:00:00.001Z</witsml:dTim> 32 <witsml:dTim>2011-04-05T06:00:00.001Z</witsml:dTim>
33 + <witsml:md uom="m">6898</witsml:md>
33 <witsml:tvd uom="m">4561</witsml:tvd> 34 <witsml:tvd uom="m">4561</witsml:tvd>
34 - <witsml:presTestType>leak off test</witsml:presTestType> 35 + <witsml:mdPlugTop uom="m">3564.22</witsml:mdPlugTop>
35 - <witsml:distDrill uom="m">78.9</witsml:distDrill> 36 + <witsml:diaHole uom="in">43.33</witsml:diaHole>
36 - <witsml:elevKelly uom="m">23.5</witsml:elevKelly>
37 - <witsml:ropCurrent uom="m/h">6.22</witsml:ropCurrent>
38 <witsml:mdKickoff uom="m">1233.22</witsml:mdKickoff> 37 <witsml:mdKickoff uom="m">1233.22</witsml:mdKickoff>
39 <witsml:tvdKickoff uom="m">1245</witsml:tvdKickoff> 38 <witsml:tvdKickoff uom="m">1245</witsml:tvdKickoff>
40 - <witsml:mdPlugTop uom="m">3564.22</witsml:mdPlugTop>
41 - <witsml:mdCsgLast uom="m">1234.56</witsml:mdCsgLast>
42 - <witsml:tvdCsgLast uom="m">1234</witsml:tvdCsgLast>
43 <witsml:strengthForm uom="g/cm3">123</witsml:strengthForm> 39 <witsml:strengthForm uom="g/cm3">123</witsml:strengthForm>
44 <witsml:mdStrengthForm uom="m">1234</witsml:mdStrengthForm> 40 <witsml:mdStrengthForm uom="m">1234</witsml:mdStrengthForm>
45 <witsml:tvdStrengthForm uom="m">1240</witsml:tvdStrengthForm> 41 <witsml:tvdStrengthForm uom="m">1240</witsml:tvdStrengthForm>
46 <witsml:diaCsgLast uom="in">16.6</witsml:diaCsgLast> 42 <witsml:diaCsgLast uom="in">16.6</witsml:diaCsgLast>
47 - <witsml:diaHole uom="in">43.33</witsml:diaHole> 43 + <witsml:mdCsgLast uom="m">1234.56</witsml:mdCsgLast>
48 - <witsml:md uom="m">6898</witsml:md> 44 + <witsml:tvdCsgLast uom="m">1234</witsml:tvdCsgLast>
45 + <witsml:presTestType>leak off test</witsml:presTestType>
46 + <witsml:distDrill uom="m">78.9</witsml:distDrill>
47 + <witsml:elevKelly uom="m">23.5</witsml:elevKelly>
49 <witsml:waterDepth uom="m">15</witsml:waterDepth> 48 <witsml:waterDepth uom="m">15</witsml:waterDepth>
49 + <witsml:sum24Hr>Circulate and condition hole at 6154m. Resume drilling 8-1/2&quot; production hole section from 6154m to 6162m. Continue to circulate and condition hole to remove cuttings from hole and attempt to reduce loss rate. Resume drilling 8-1/2&quot; production hole section from 6162m to 6292m. Losses ranging from 6 m3/hr to 19 m3/hr while drilling and circulating.</witsml:sum24Hr>
50 + <witsml:forecast24Hr>Continue to drill 8-1/2&quot; production hole section to TD. Circulate and condition hole.</witsml:forecast24Hr>
51 + <witsml:ropCurrent uom="m/h">6.22</witsml:ropCurrent>
52 + <witsml:tightWell>false</witsml:tightWell>
53 + <witsml:hpht>false</witsml:hpht>
50 <witsml:avgPresBH uom="psig">2</witsml:avgPresBH> 54 <witsml:avgPresBH uom="psig">2</witsml:avgPresBH>
51 <witsml:avgTempBH uom="degC">20</witsml:avgTempBH> 55 <witsml:avgTempBH uom="degC">20</witsml:avgTempBH>
52 <witsml:fixedRig>true</witsml:fixedRig> 56 <witsml:fixedRig>true</witsml:fixedRig>
53 - <witsml:hpht>false</witsml:hpht>
54 - <witsml:tightWell>false</witsml:tightWell>
55 - <witsml:sum24Hr>Circulate and condition hole at 6154m. Resume drilling 8-1/2&quot; production hole section from 6154m to 6162m. Continue to circulate and condition hole to remove cuttings from hole and attempt to reduce loss rate. Resume drilling 8-1/2&quot; production hole section from 6162m to 6292m. Losses ranging from 6 m3/hr to 19 m3/hr while drilling and circulating.</witsml:sum24Hr>
56 - <witsml:forecast24Hr>Continue to drill 8-1/2&quot; production hole section to TD. Circulate and condition hole.</witsml:forecast24Hr>
57 </witsml:statusInfo> 57 </witsml:statusInfo>
58 <witsml:activity> 58 <witsml:activity>
59 <witsml:dTimStart>2011-04-05T06:00:00.001Z</witsml:dTimStart> 59 <witsml:dTimStart>2011-04-05T06:00:00.001Z</witsml:dTimStart>
...@@ -74,11 +74,11 @@ Cuttings weight: ...@@ -74,11 +74,11 @@ Cuttings weight:
74 <witsml:activity> 74 <witsml:activity>
75 <witsml:dTimStart>2011-04-05T06:15:00.001Z</witsml:dTimStart> 75 <witsml:dTimStart>2011-04-05T06:15:00.001Z</witsml:dTimStart>
76 <witsml:dTimEnd>2011-04-05T08:30:00.001Z</witsml:dTimEnd> 76 <witsml:dTimEnd>2011-04-05T08:30:00.001Z</witsml:dTimEnd>
77 - <witsml:mdHoleStart uom="m">6000</witsml:mdHoleStart>
78 <witsml:md uom="m">6162</witsml:md> 77 <witsml:md uom="m">6162</witsml:md>
79 <witsml:tvd uom="m">1799.94559164957</witsml:tvd> 78 <witsml:tvd uom="m">1799.94559164957</witsml:tvd>
80 <witsml:phase>fixed</witsml:phase> 79 <witsml:phase>fixed</witsml:phase>
81 <witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode> 80 <witsml:proprietaryCode>drilling -- drill</witsml:proprietaryCode>
81 + <witsml:mdHoleStart uom="m">6000</witsml:mdHoleStart>
82 <witsml:state>ok</witsml:state> 82 <witsml:state>ok</witsml:state>
83 <witsml:stateDetailActivity>success</witsml:stateDetailActivity> 83 <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
84 <witsml:comments>Continue drilling 8-1/2" production hole section. Reduce RPM to 80 and increase pump rate to 1850 lpm to send downlink. Resume drilling f/ 6154m to 6162m. 1600 lpm, 180 bar, 31-33 kNm drilling torque, 3-4 ton WOB. Losses while drilling from 8 m3/hr to 12,2m3/hr 84 <witsml:comments>Continue drilling 8-1/2" production hole section. Reduce RPM to 80 and increase pump rate to 1850 lpm to send downlink. Resume drilling f/ 6154m to 6162m. 1600 lpm, 180 bar, 31-33 kNm drilling torque, 3-4 ton WOB. Losses while drilling from 8 m3/hr to 12,2m3/hr
......