25 11-G-12 Y2.xml 7.12 KB
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema//DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd"><witsml:documentInfo><witsml:documentName>Drill Report</witsml:documentName><witsml:owner>IIP</witsml:owner></witsml:documentInfo><witsml:drillReport><witsml:nameWell>NO 25/11-G-12 Y2</witsml:nameWell><witsml:nameWellbore>NO 25/11-G-12 Y2</witsml:nameWellbore><witsml:name>name</witsml:name><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:versionKind>normal</witsml:versionKind><witsml:createDate>2011-10-04T13:27:33.000Z</witsml:createDate>
<witsml:wellAlias><witsml:name>25/11-G-12 Y2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellAlias>
<witsml:wellboreAlias><witsml:name>25/11-G-12 Y2</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:wellboreAlias><witsml:wellboreAlias><witsml:name>5380</witsml:name><witsml:namingSystem>NPD number</witsml:namingSystem></witsml:wellboreAlias>
<witsml:wellboreInfo><witsml:dTimSpud>2006-10-22T00:00:00.000Z</witsml:dTimSpud><witsml:dateDrillComplete>2006-11-03</witsml:dateDrillComplete><witsml:operator>Statoil</witsml:operator><witsml:drillContractor>Aker Well Service</witsml:drillContractor><witsml:rigAlias><witsml:name>GRANE</witsml:name><witsml:namingSystem>NPD Name</witsml:namingSystem></witsml:rigAlias><witsml:rigAlias><witsml:name>283285</witsml:name><witsml:namingSystem>NPD code</witsml:namingSystem></witsml:rigAlias></witsml:wellboreInfo>
<witsml:statusInfo><witsml:dTim>2011-10-04T00:00:00.000Z</witsml:dTim><witsml:md uom="m">-9999</witsml:md><witsml:diaHole uom="in">0</witsml:diaHole><witsml:mdDiaHoleStart uom="m">0</witsml:mdDiaHoleStart><witsml:mdKickoff uom="m">3143.6</witsml:mdKickoff><witsml:tvdStrengthForm uom="m">0</witsml:tvdStrengthForm><witsml:diaCsgLast uom="in">9.625</witsml:diaCsgLast><witsml:mdCsgLast uom="m">3243</witsml:mdCsgLast><witsml:mdPlanned uom="m">-9999</witsml:mdPlanned><witsml:distDrill uom="m">-9999</witsml:distDrill><witsml:elevKelly uom="m">69.9</witsml:elevKelly><witsml:sum24Hr>Lifted riser and replaced WL hatch with permanent hatch. Leak tested xmas tree cap. Removed chicksan and leak tested KW cap. Prepared to demobilize personnel and equipment. ***END OF OPERATION***</witsml:sum24Hr><witsml:forecast24Hr>No projected operations.</witsml:forecast24Hr><witsml:ropCurrent uom="m/h">-9999</witsml:ropCurrent></witsml:statusInfo>





<witsml:activity><witsml:dTimStart>2011-10-03T00:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T03:30:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Continued attempting to achieve good test on cap on riser. Discussed situation with crew/control room.  Achieved good leak test on riser cap after pressuring up in x-mas tree cross and bleding quickly before leak testing riser/riser cap. Opened HMV. WHP 14 bar. Closed DHSV and bled down pressure above to 0 bar. Closed HMV and bled down pressure in xmas tree cross/riser. Drained riser/x-mas tree cross to closed drain. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T03:30:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Held A-standard/pre-job meeting on heavy lift on hatch deck with involved personnel.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T04:45:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Performed heavy lift: lifted riser and LD riser on hatch deck, and changed from WL hatch to permanent hatch.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T04:45:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T06:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Leak tested top cap on x-mas tree to 20/260 bar for 5/10 min. Meanwhile continued packing equipment.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T06:00:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T12:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Disconnected winch/unit electrically and from F&amp;G. Packed equipment. </witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T12:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-03T15:40:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Disassembled chicksan lines and leak tested KWV-cap to 20/260 bar for 5/10 min. OK.</witsml:comments></witsml:activity><witsml:activity><witsml:dTimStart>2011-10-03T15:40:00.000Z</witsml:dTimStart><witsml:dTimEnd>2011-10-04T00:00:00.000Z</witsml:dTimEnd><witsml:md uom="m">0</witsml:md><witsml:phase>wire line</witsml:phase><witsml:proprietaryCode>workover -- wire line</witsml:proprietaryCode><witsml:state>ok</witsml:state><witsml:stateDetailActivity>success</witsml:stateDetailActivity><witsml:comments>Packed equipment and cleaned hatch deck and WH. Handed well over to production. ***END OF OPERATION***</witsml:comments></witsml:activity>





<witsml:equipFailureInfo><witsml:dTim>2011-09-26T00:00:00.000Z</witsml:dTim><witsml:md uom="m">2</witsml:md><witsml:equipClass>service equ -- other</witsml:equipClass><witsml:eTimMissProduction uom="min">350.4</witsml:eTimMissProduction><witsml:dTimRepair>2011-09-26T08:10:00.000Z</witsml:dTimRepair><witsml:description>I forbindelse med kjøring av en drift i G-12 på wireline stoppet wireline verktøystrengen etter bare 2 meter under korneventilen. EN arm som skal inn i GLV var blitt aktivert under installering i sluserøret eller under kjøring av verktøystrengen. Dette med</witsml:description></witsml:equipFailureInfo>




</witsml:drillReport></witsml:drillReports>