NPD_110420085604.xml 7.78 KB
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
  <witsml:drillReport>
    <witsml:nameWell>25/8-C-23</witsml:nameWell>
    <witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
    <witsml:name>25/8-C-23</witsml:name>
    <witsml:dTimStart>2011-04-19T06:00:00.001Z</witsml:dTimStart>
    <witsml:dTimEnd>2011-04-20T06:00:00.001Z</witsml:dTimEnd>
    <witsml:versionKind>normal</witsml:versionKind>
    <witsml:createDate>2011-04-20T06:56:00.001Z</witsml:createDate>
    <witsml:wellAlias>
      <witsml:name>25/8-C-23</witsml:name>
      <witsml:namingSystem>NPD code</witsml:namingSystem>
    </witsml:wellAlias>
    <witsml:wellboreAlias>
      <witsml:name>25/8-C-23 B</witsml:name>
      <witsml:namingSystem>NPD code</witsml:namingSystem>
    </witsml:wellboreAlias>
    <witsml:wellboreAlias>
      <witsml:name>6480</witsml:name>
      <witsml:namingSystem>NPD number</witsml:namingSystem>
    </witsml:wellboreAlias>
    <witsml:wellDatum>
      <witsml:name>Kelly Bushing</witsml:name>
      <witsml:code>KB</witsml:code>
      <witsml:elevation uom="m">32</witsml:elevation>
    </witsml:wellDatum>
    <witsml:wellDatum>
      <witsml:name>Sea Level</witsml:name>
      <witsml:code>SL</witsml:code>
      <witsml:elevation uom="m">32</witsml:elevation>
    </witsml:wellDatum>
    <witsml:wellboreInfo>
      <witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
      <witsml:operator>Esso Norway</witsml:operator>
      <witsml:drillContractor>KCA Deutag</witsml:drillContractor>
      <witsml:rigAlias>
        <witsml:name>Ringhorne</witsml:name>
        <witsml:namingSystem>NPD Name</witsml:namingSystem>
      </witsml:rigAlias>
      <witsml:rigAlias>
        <witsml:name>280849</witsml:name>
        <witsml:namingSystem>NPD Code</witsml:namingSystem>
      </witsml:rigAlias>
    </witsml:wellboreInfo>
    <witsml:statusInfo>
      <witsml:dTim>2011-04-19T06:00:00.001Z</witsml:dTim>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:presTestType>formation integrity test</witsml:presTestType>
      <witsml:distDrill uom="m">0</witsml:distDrill>
      <witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
      <witsml:sum24Hr>Observed no obstructions while RIH with 3 RPM to 5800m to simulate screen running. Lubricated out of hole with 3 RPM / 90 LPM to shoe at 5534m with no overpulls or packoffs. Pumped slug. POOH to 995m (L/O 4-1/2" DP to deck).</witsml:sum24Hr>
      <witsml:forecast24Hr>L/D 8-1/2" clean out assembly. P/U and RIH 9-5/8" scraper assembly. </witsml:forecast24Hr>
    </witsml:statusInfo>
    <witsml:activity>
      <witsml:dTimStart>2011-04-19T06:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-19T08:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>RIH 8-1/2" clean out assembly from 5641m to 5800 with 3 RPM / 14 kNm TQ, 0 LPM to simulate screen running. Observed no problems passing tight spots encountered on trip out. </witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-19T08:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-19T11:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Lubricated out of hole from 5800m to shoe depth 5534m with 90 LPM / 9 BAR, 3 RPM / 16 kNm. Observed no overpull or packoffs. </witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-19T11:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-19T11:30:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Flowcheck well - static. Pumped slug. 

</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-19T11:30:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-19T16:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>POOH 8-1/2" clean out assembly from 5534m to 4119m while taking torque/drag readings every 300m for completion data collection. 

Depth	P/U Wt		S/O Wt		TQ	RPM
----------	------------	------------	-----	--------
4500	140		68		17 - 25	40
</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-19T16:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-19T18:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>interruption -- repair</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>Prepared PTW. Replaced encoder for spinnertong elevation at Hydratong. </witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-04-19T18:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-04-20T06:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>ok</witsml:state>
      <witsml:stateDetailActivity>success</witsml:stateDetailActivity>
      <witsml:comments>POOH 8-1/2" clean out assembly from 4119m to 995m while taking torque/drag readings every 300m for completion data collection. L/D 4-1/2" DP to deck while POOH (77 jts total to L/O). 

Depth	P/U Wt		S/O Wt		TQ	RPM
----------	------------	------------	-----	--------
4200	130		68		17 - 24	40
3900	121		68		17 - 22	40
3600	118		65		15 - 21	40
3300	106		64		13 - 18	40
3000	99		64		11 - 16	40
2500	97		67		9 - 13	40
2000	82		66		6 - 10	40
1500	71		62		4 - 6	40</witsml:comments>
    </witsml:activity>
    <witsml:equipFailureInfo>
      <witsml:dTim>2011-04-19T16:00:00.001Z</witsml:dTim>
      <witsml:md uom="m">6414</witsml:md>
      <witsml:tvd uom="m">1800.09082865924</witsml:tvd>
      <witsml:equipClass>drill floor -- other</witsml:equipClass>
      <witsml:eTimMissProduction uom="min">120</witsml:eTimMissProduction>
      <witsml:dTimRepair>2011-04-19T18:00:00.001Z</witsml:dTimRepair>
      <witsml:description>Prepared PTW. Replaced encoder for spinnertong elevation at Hydratong. </witsml:description>
    </witsml:equipFailureInfo>
  </witsml:drillReport>
</witsml:drillReports>