DrillReport_24.03.2011.xml 13.2 KB
<?xml version="1.0" encoding="UTF-8"?>
<drillReports xmlns="http://www.witsml.org/schemas/1series" version="1.4.0.0">
<drillReport>
<nameWell>2/1-A-25</nameWell>
<nameWellbore>A-25 A</nameWellbore>
<name>2/1-A-25</name>
<dTimStart>2011-03-24T00:00:00.000Z</dTimStart>
<dTimEnd>2011-03-25T00:00:00.000Z</dTimEnd>
<versionKind>normal</versionKind>
<createDate>2011-03-25T07:45:21.061Z</createDate>
<wellAlias>
<name>0</name>
<namingSystem>NPD code</namingSystem>
</wellAlias>
<wellboreAlias>
<name>2/1-A-25 A</name>
<namingSystem>NPD code</namingSystem>
</wellboreAlias>
<wellboreAlias>
<name>6482</name>
<namingSystem>NPD number</namingSystem>
</wellboreAlias>
<wellboreInfo>
<dTimPreSpud>2011-01-27T13:00:00.000Z</dTimPreSpud>
<operator>Talisman Energy Norge</operator>
<drillContractor>Archer</drillContractor>
<rigAlias>
<name>Gyda</name>
<namingSystem>NPD Name</namingSystem>
</rigAlias>
<rigAlias>
<name>272337</name>
<namingSystem>NPD code</namingSystem>
</rigAlias>
</wellboreInfo>
<statusInfo>
<dTim>2011-03-24T00:00:00.000Z</dTim>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">3089.0</md>
<tvd datum="ff8080812d82ea35012dbcc14fac200b" uom="m">2440.23</tvd>
<diaHole uom="in">17.5</diaHole>
<mdDiaHoleStart datum="ff8080812d82ea35012dbcc14fac200b" uom="m">65.5</mdDiaHoleStart>
<diaPilot uom="in">0.0</diaPilot>
<typeWellbore>initial</typeWellbore>
<diaCsgLast uom="in">13.375</diaCsgLast>
<mdCsgLast datum="ff8080812d82ea35012dbcc14fac200b" uom="m">3081.4</mdCsgLast>
<tvdCsgLast datum="ff8080812d82ea35012dbcc14fac200b" uom="m">2435.4</tvdCsgLast>
<sum24Hr>Installed LP-riser and diverter. Tested 13 5/8" BOP. Ran wear bushing. Performed slip and Cut. </sum24Hr>
<forecast24Hr>Build and RIH 12 1/4" BHA on 6 5/8" DP down to 3900m. </forecast24Hr>
</statusInfo>
<fluid>
<type>ENVIROMUL</type>
<dTim>2011-03-24T11:00:00.000Z</dTim>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">905.0</md>
<presBopRating uom="bar">200.00000000000006</presBopRating>
<mudClass>oil based</mudClass>
<density uom="g/cm3">1.549994265</density>
<pv uom="mPa.s">47.0</pv>
<yp uom="Pa">13.4</yp>
</fluid>
<activity>
<dTimStart>2011-03-24T00:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T01:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Removed lifting device for LP-riser and changed inserts in elevator from 5 1/2" to 5". Installed diverter on LP-riser and ran in hole and landed in rotary. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T01:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T02:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Connected diverter hydraulically. 

Meanwhile: Cleaned and tidied BOP deck. Hooked riser drain pump up om A-25</comments>
</activity>
<activity>
<dTimStart>2011-03-24T02:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T02:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Removed diverter running tool and installed master bushing. 

Meanwhile: connected overshot hydraulically</comments>
</activity>
<activity>
<dTimStart>2011-03-24T02:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T03:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Pressured flow line seals and overshot. Filled trip tank and riser with seawater. Observed leak on bell nipple, ventilated system - leaking stopped. Pressurized BOP and system - OK</comments>
</activity>
<activity>
<dTimStart>2011-03-24T03:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T03:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Changed handling equipment from 5" to 5 1/2" in elevator. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T03:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T04:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Picked up 5 1/2" drill pipe single from deck. Removed riser and diverter handling equipment from drill floor.  Made up 13 3/8" cup tester and 5 1/2" x NC50 x/o to drill pipe single. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T04:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T06:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop/wellhead equipment</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Picked up 5 1/2" DP stand from derrick and ran in hole 13 3/8" cup tester and spaced out in BOP. Lined up from cement unit to A-annulus valve on A-25. Flushed line from cement unit to trip tank. Closed annular and started to test. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T06:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T07:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Tested annular BOP, lower pipe ram, and upper pipe ram to 300 PSI/5 min and 2900 PSI/10 min</comments>
</activity>
<activity>
<dTimStart>2011-03-24T07:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T08:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>POOH with cup tester. Broke and laid out same. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T08:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T08:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Inspected test plug, and made up to string. Ran in hole and landed test plug in well head.  </comments>
</activity>
<activity>
<dTimStart>2011-03-24T08:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T09:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Lined up and tested upper pipe ram, gate valve on A-annulus through kill and choke hoses to 300 PSI/5 min and 5800 PSI/10 min. Had B- annulus gate open. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T09:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T10:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>POOH slowly with test plug. Racked back 1 stand and broke off test plug and laid out same. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T10:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T11:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- rig up/down</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Made up wear bushing running tool and connected wearbushing. Ran in hole and set wearbushing at 30,65m (top wear bushing). POOH with running tool and broke off. Laid 1 single 5 1/2" DP to deck. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T11:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T14:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- rig up/down</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Performed pre-job meeting prior to start slip and cut. Performed Slip and Cut </comments>
</activity>
<activity>
<dTimStart>2011-03-24T14:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T17:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- rig up/down</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Installed and tested trolley to masterbushing/Unitong. Rigged down equipment after test was done. 

Meanwhile: tested stand pipe to 5000 psi</comments>
</activity>
<activity>
<dTimStart>2011-03-24T17:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T17:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- rig up/down</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Cleaned and tidied rig floor and prepared to test DDM. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T17:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T18:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- rig up/down</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Made up pup, kelly cock and x-over to 2" weco to DDM. Connected up cement hose</comments>
</activity>
<activity>
<dTimStart>2011-03-24T18:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T20:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Tested IBOP, 5 1/2" kelly cock and kelly hose to 300 PSI/5min and 5000PSI/ 10 min. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T20:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T21:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- bop activities</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Disconnected cement hose  broke out 5 1/2" kelly cock, 5 1/2" pup and 5 1/2" x 2" waco swedge and laid down to rig floor. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T21:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T22:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- rig up/down</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Performed Grease and Drops check in derrick. 

Meanwhile: Troubleshoot on Link tilt. Performed SJA meeting to pick up and RIH with BHA. With link tilt problems.  Tested stand pipe #5 to 300PSI/5min and 5000 PSI/10 min. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T22:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T22:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- trip</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Performed Toolbox meeting prior to lift up floor monkey to rig floor. Lifted floor monkey and installed same. 

Meanwhile: Tested stand pipe #6 to 300PSI/5min and 5000 PSI/10 min. Tested 6 5/8" Kelly cock in test skid to 300PSI/5min and 5000 PSI/10 min.</comments>
</activity>
<activity>
<dTimStart>2011-03-24T22:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T23:00:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">0.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- trip</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Picked up BHA #1 ( 12 1/4" bit and Power drive) and inspected same. Performed toolbox meeting prior to start RIH. Changed dies in BUT on Unitong.</comments>
</activity>
<activity>
<dTimStart>2011-03-24T23:00:00.000Z</dTimStart>
<dTimEnd>2011-03-24T23:30:00.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">9.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- trip</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>RIH BHA #1 (12 1/4" bit and Power drive) from surface to 9 m. Skidded Unitong in well center. </comments>
</activity>
<activity>
<dTimStart>2011-03-24T23:30:00.000Z</dTimStart>
<dTimEnd>2011-03-24T23:59:59.000Z</dTimEnd>
<md datum="ff8080812d82ea35012dbcc14fac200b" uom="m">15.0</md>
<phase>fixed</phase>
<proprietaryCode>drilling -- trip</proprietaryCode>
<state>ok</state>
<stateDetailActivity>success</stateDetailActivity>
<comments>Picked up ARC tool from deck and RIH from 9 m to 15 m.</comments>
</activity>
</drillReport>
</drillReports>