NPD_110419090731.xml
5.72 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
<witsml:drillReport>
<witsml:nameWell>25/8-C-23</witsml:nameWell>
<witsml:nameWellbore>25/08-C-23 B</witsml:nameWellbore>
<witsml:name>25/8-C-23</witsml:name>
<witsml:dTimStart>2011-04-18T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T06:00:00.001Z</witsml:dTimEnd>
<witsml:versionKind>normal</witsml:versionKind>
<witsml:createDate>2011-04-19T07:07:00.001Z</witsml:createDate>
<witsml:wellAlias>
<witsml:name>25/8-C-23</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellAlias>
<witsml:wellboreAlias>
<witsml:name>25/8-C-23 B</witsml:name>
<witsml:namingSystem>NPD code</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellboreAlias>
<witsml:name>6480</witsml:name>
<witsml:namingSystem>NPD number</witsml:namingSystem>
</witsml:wellboreAlias>
<witsml:wellDatum>
<witsml:name>Kelly Bushing</witsml:name>
<witsml:code>KB</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellDatum>
<witsml:name>Sea Level</witsml:name>
<witsml:code>SL</witsml:code>
<witsml:elevation uom="m">32</witsml:elevation>
</witsml:wellDatum>
<witsml:wellboreInfo>
<witsml:dTimSpud>2011-01-24T06:00:00.001Z</witsml:dTimSpud>
<witsml:operator>Esso Norway</witsml:operator>
<witsml:drillContractor>KCA Deutag</witsml:drillContractor>
<witsml:rigAlias>
<witsml:name>Ringhorne</witsml:name>
<witsml:namingSystem>NPD Name</witsml:namingSystem>
</witsml:rigAlias>
<witsml:rigAlias>
<witsml:name>280849</witsml:name>
<witsml:namingSystem>NPD Code</witsml:namingSystem>
</witsml:rigAlias>
</witsml:wellboreInfo>
<witsml:statusInfo>
<witsml:dTim>2011-04-18T06:00:00.001Z</witsml:dTim>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:presTestType>formation integrity test</witsml:presTestType>
<witsml:distDrill uom="m">0</witsml:distDrill>
<witsml:elevKelly uom="m">60.2999992370605</witsml:elevKelly>
<witsml:sum24Hr>Lubricated out hole from 5919m to 5530m while working through tight spots. Circulated 2 bottoms up at shoe depth 5534m while adding 1% Ultralube 2 and monitoring torque readings. Commenced RIH from 5530m to 5641m.</witsml:sum24Hr>
<witsml:forecast24Hr>Complete short trip to 5800m. Lubricate out of hole to casing. POOH 8-1/2" clean out assembly and pick up scraper run BHA.</witsml:forecast24Hr>
</witsml:statusInfo>
<witsml:activity>
<witsml:dTimStart>2011-04-18T06:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-18T18:30:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Lubricated out of hole from 5919m to 5530m with 90 LPM / 17 BAR, 3 RPM / 22 kNM TQ (5534m csg shoe).
Worked through tight intervals from 5961m - 5927m and 5820m - 5534m (predominantly sand intervals) with 0 - 90 LPM / 17 BAR, 90 - 100 RPM / 26 kNm TQ. Slide through shale sections with 55 ton S/O wt. Rotate down sand intervals with 3 RPM /26 kNM TQ after working section.
Depth S/O Wt
---------- ------------
5800 58
5600 101
</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-18T18:30:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T05:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- circulating conditioning</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>Staged pumps up to 1200 LPM / 85 BAR. Commenced circulating bottoms up while adding 1% Ultralube 2 (3 m3 total) at 1100 LPM / 75 BAR, 38 RPM / 26 kNm TQ (2.3 m3/hr losses). Observed fines at shakers and no gas at bottoms up. Pumped 13.9k strokes total.
Rhyeology:
Before Ultralube 2 - 6 RPM / 11, 3 RPM / 10.
After Ultralube 2 - 6 RPM / 6, 3 RPM / 6.
P/U Wt S/O Wt TQ RPM Flow
------------ ------------ ----- -------- ------------
No Ultralube 2 146 65 N/A N/A 0 LPM
No Ultralube 2 143 68 24-32 38 600 LPM
Ultralube 2 128 76 N/A N/A 0 LPM
Ultralube 2 123 75 23-27 38 600 LPM
24 hr losses: 115 m3</witsml:comments>
</witsml:activity>
<witsml:activity>
<witsml:dTimStart>2011-04-19T05:00:00.001Z</witsml:dTimStart>
<witsml:dTimEnd>2011-04-19T06:00:00.001Z</witsml:dTimEnd>
<witsml:md uom="m">6414</witsml:md>
<witsml:tvd uom="m">1800.09082865924</witsml:tvd>
<witsml:phase>fixed</witsml:phase>
<witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
<witsml:state>ok</witsml:state>
<witsml:stateDetailActivity>success</witsml:stateDetailActivity>
<witsml:comments>RIH 8-1/2" clean out assembly from 5530m to 5641m with 3 RPM / 14 kNm TQ, 0 LPM to simulate screen running. </witsml:comments>
</witsml:activity>
</witsml:drillReport>