<?xml version="1.0" encoding="utf-8"?>
<witsml:drillReports version="1.4.0.0" xmlns:witsml="http://www.witsml.org/schemas/1series" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.witsml.org/schemas/1series http://www.npd.no/schema/DDRS/1series/WITSML_drillReport_profiled_schema_phase2.xsd">
  <witsml:documentInfo>
    <witsml:documentName>Drill Report</witsml:documentName>
    <witsml:documentDate>2011-09-27T11:08:10.001Z</witsml:documentDate>
    <witsml:owner>ConocoPhillips</witsml:owner>
  </witsml:documentInfo>
  <witsml:drillReport>
    <witsml:nameWell>2/4-K-08</witsml:nameWell>
    <witsml:nameWellbore>2/4-K-8 B</witsml:nameWellbore>
    <witsml:name>2/4-K-8</witsml:name>
    <witsml:dTimStart>2011-09-26T00:00:00.001Z</witsml:dTimStart>
    <witsml:dTimEnd>2011-09-27T00:00:00.001Z</witsml:dTimEnd>
    <witsml:versionKind>normal</witsml:versionKind>
    <witsml:createDate>2011-09-27T11:08:10.001Z</witsml:createDate>
    <witsml:wellAlias>
      <witsml:name>2/4-K-08</witsml:name>
      <witsml:namingSystem>NPD code</witsml:namingSystem>
    </witsml:wellAlias>
    <witsml:wellboreAlias>
      <witsml:name>2/4-K-8 B</witsml:name>
      <witsml:namingSystem>NPD code</witsml:namingSystem>
    </witsml:wellboreAlias>
    <witsml:wellboreAlias>
      <witsml:name>6609</witsml:name>
      <witsml:namingSystem>NPD number</witsml:namingSystem>
    </witsml:wellboreAlias>
    <witsml:wellDatum>
      <witsml:name>Kelly Bushing</witsml:name>
      <witsml:code>KB</witsml:code>
      <witsml:elevation uom="m" datum="SL">36.271</witsml:elevation>
    </witsml:wellDatum>
    <witsml:wellDatum>
      <witsml:name>Sea Level</witsml:name>
      <witsml:code>SL</witsml:code>
    </witsml:wellDatum>
    <witsml:wellCRS>
      <witsml:name>ED50</witsml:name>
      <witsml:geographic>
        <witsml:geodeticDatumCode>ED50</witsml:geodeticDatumCode>
      </witsml:geographic>
    </witsml:wellCRS>
    <witsml:wellboreInfo>
      <witsml:operator>ConocoPhillips</witsml:operator>
      <witsml:drillContractor>ARCHER</witsml:drillContractor>
      <witsml:rigAlias>
        <witsml:name>EKOFISK K</witsml:name>
        <witsml:namingSystem>NPD Name</witsml:namingSystem>
      </witsml:rigAlias>
      <witsml:rigAlias>
        <witsml:name>271469</witsml:name>
        <witsml:namingSystem>NPD code</witsml:namingSystem>
      </witsml:rigAlias>
    </witsml:wellboreInfo>
    <witsml:statusInfo>
      <witsml:dTim>2011-09-26T00:00:00.001Z</witsml:dTim>
      <witsml:md uom="m">2250.948</witsml:md>
      <witsml:typeWellbore>sidetrack</witsml:typeWellbore>
      <witsml:mdKickoff uom="m">2735.58</witsml:mdKickoff>
      <witsml:diaCsgLast uom="in">10.75</witsml:diaCsgLast>
      <witsml:mdCsgLast uom="m">2735.885</witsml:mdCsgLast>
      <witsml:distDrill uom="m">0</witsml:distDrill>
      <witsml:elevKelly uom="m">56.693</witsml:elevKelly>
      <witsml:sum24Hr>Change powerloop on eagle while waiting on GeoPilot, change plans, rih with cement stinger to plug back.</witsml:sum24Hr>
      <witsml:forecast24Hr>Set balanced cement plug and pooh with cement stinger. Rih with drilling BHA.</witsml:forecast24Hr>
    </witsml:statusInfo>
    <witsml:fluid>
      <witsml:type>Warp</witsml:type>
      <witsml:dTim>2011-09-26T00:00:00.001Z</witsml:dTim>
      <witsml:md uom="m">2807.818</witsml:md>
      <witsml:tvd uom="m">1987.108</witsml:tvd>
      <witsml:presBopRating uom="bar">344.738</witsml:presBopRating>
      <witsml:mudClass>oil based</witsml:mudClass>
      <witsml:density uom="g/cm3">1.737</witsml:density>
      <witsml:pv uom="mPa.s">35</witsml:pv>
      <witsml:yp uom="Pa">4.309</witsml:yp>
    </witsml:fluid>
    <witsml:extendedReport dTim="2011-09-27T01:45:00.001Z">Rih with cement stinger @ 7385 ft</witsml:extendedReport>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T00:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T00:30:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">0</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>Clean and clear rigfloor</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T00:30:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T10:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">0</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>operation failed</witsml:stateDetailActivity>
      <witsml:comments>Wait on GeoPilot BHA on Far Server ETA 09:00 Meanwhile change powerloop on eagle, perform PM on drawwork and Torquewinder. Perform anticollision test.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T10:00:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T12:30:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">0</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>Receive Geopilot BHA. Prepare same on deck.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T12:30:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T12:45:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">0</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>Hold pre job meeting prior to p/u new BHA.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T12:45:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T14:45:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">0</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>P/u Geopilot and MWD. Contra order from town. Plan for cmt back open hole and plan new kick off. L/d Geopilot and MWD. Order 3 1/2" DP cmt stinger from ELDA.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T14:45:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T17:45:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">0</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- other</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>Wait on cmt stinger from ELDA, meanwhile clean rig floor. Prepare handling equipment for 3 1/2" DP. Rig maintenance.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T17:45:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-26T19:45:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">144.78</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>P/u 15 jnts 3 1/2" dp cmt stinger and rih to 475 ft.</witsml:comments>
    </witsml:activity>
    <witsml:activity>
      <witsml:dTimStart>2011-09-26T19:45:00.001Z</witsml:dTimStart>
      <witsml:dTimEnd>2011-09-27T00:00:00.001Z</witsml:dTimEnd>
      <witsml:md uom="m">2250.948</witsml:md>
      <witsml:phase>fixed</witsml:phase>
      <witsml:proprietaryCode>drilling -- trip</witsml:proprietaryCode>
      <witsml:state>fail</witsml:state>
      <witsml:stateDetailActivity>equipment failure</witsml:stateDetailActivity>
      <witsml:comments>Continue rih on 5" dp from 475 - 7385 ft.</witsml:comments>
    </witsml:activity>
  </witsml:drillReport>
</witsml:drillReports>